Overview
Sudarshan Foresta
Overview
Sudarshan Foresta
Overview
Sudarshan Foresta
Overview
Photo: SUDARSHAN FORESTATitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Transfer of the land
Title deed executed
Consideration ₹1.40 Cr · Sy 94/2, Bangalore North taluk
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 114 m² 100%
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 9 Jan 2025 | |
| Building plan (BBMP) | Sanctioned 21 Aug 2024 | |
| Escrow bank | ICICI Bank |
Data room
113 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Wonderful quality project with great passsion of work by sudarshan family store management👍 good sales team 👍 really appreciated with modern facility and elevation of the project 👍
The surroundings are surprisingly calm. Once completed, this should be a beautiful place to live...
North Bangalore has many options, but this one feels different. More greenery, more open planning. Happy with my booking.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | 1 | – | Review |
| Loan & collateral | – | – | – | – |
| Adarsh Greens Phase 1Extended to 31-10-2026 | ADARSH HAVEN PRIVATE LIMITED | Apartment | 366–635 sqft carpet (as filed) | Oct 2025 |
| Adarsh Greens Phase 2Extended to 31-05-2027 | ADARSH HAVEN PRIVATE LIMITED | Apartment | 635 sqft carpet (as filed) | May 2026 |
| Adhishree SunshineWithdrawn | ADHISHREE VENTURES INDIA PVT LTD | Apartment | – | Sep 2021 |
| Adi's North LakeCompleted (regulator flag) | ADI DEVELOPERS | Apartment | 1,435 sqft carpet (as filed) | Completed |
| Affinity SowparnikaCompleted · OC 29-04-2019 | Affinity Projects | Apartment | – | Completed |
| Anugrha ApartmentLapsed · completion date passed | Gayathri Krishna Infrastructure Prospects Private limited | Apartment | – | Apr 2018 |
| Arun Auroville Phase ILapsed · completion date passed | Arun Shelters Pvt Ltd | Apartment | 2,716 sqft carpet (as filed) | May 2021 |
| Arvind SkylandsCompleted · OC 03-02-2020 | Arvind SmartSpaces Limited | Apartment | 1,063 sqft carpet (as filed) | Completed |
8 of 44 other projects in Jakkur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Sudarshan Foresta in the interactive atlas
Title deed filed with K-RERA, pp. 1, 7, 10 · See it in Documents
Approval or registration
Land use converted
Deputy Commissioner, Bangalore · Survey 94/2
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 94/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/Ad.Com./YLK/1144/23-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/070225/007490
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 9 Jan 2025 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of 1 of the survey sketch. Filed with K-RERA: ADLR Survey Sketch, 1 page, not in English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 94/2 | |
|---|---|---|
| Land extent, Sy 94/2 | 4,263 sq m | |
| Land area of this registration | 4,263 sq m | |
| Khata | A Khatha · BBMP · 22 May 2023 | |
| Title deed | Sy 94/2, Chokkanahalli village, Yelahanka hobli | |
| Title deed | Sy 94/2, Batigalore North taluk |
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 21 Aug 2024 · No. BBMP/Ad.Com./YLK/1144/23-24 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-129216 · issued 20 Nov 2024 · valid until 19 Nov 2029 | Clear |
| Water and sewerage NOC (BWSSB) | issued 4 Dec 2024 |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Jan 2030 |
| Land conversion | Converted 15 Oct 2022 · Deputy Commissioner, Bangalore | |
|---|---|---|
| Survey numbers | 94/2 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 3BHK | 64 | 1,225 |
| Sold, Q2 2026-27 | 7 / 64 | |
|---|---|---|
| Unsold, Q2 2026-27 | 57 | |
| Months to sell, derived from filed bookings | Too few bookings to project (4 flats booked in 9 months) |
| Sobha City Athena | about 1.5 km | Locked | |
|---|---|---|---|
| Assetz Soho & Sky Phase 1b | about 2 km | Locked | |
| Sumadhura Epitome | about 2 km | Locked | |
| Sumadhura Solea | about 2.5 km | Locked | |
| Sobha Dream Gardens Phase 5 - Wing 10 | about 2.5 km | Locked | |
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 2.5 km | Locked | |
| Sobha Dream Gardens Phase 3 - Wing 3 And 4 | about 2.5 km | Locked | |
| Sattva La Vita | about 2.5 km | Locked | |
| Cumins Sanctum | about 2.5 km | Locked | |
| 4square Park Sierra | about 2.5 km | Locked | |
| Legacy Salvador | about 3 km | Locked | |
| Assetz Soho & Sky | about 3 km | Locked |
| Sudarshan Foresta This project | This project is the point the others are measured from | 31 Jan 2030 | 11% (7 of 64) | Not verified yet |
|---|---|---|---|---|
| Sobha City Athena | about 1.5 km | 30 Sep 2027 | 100% (72 of 72) | Locked |
| Assetz Soho & Sky Phase 1b | about 2 km | 31 Dec 2027 | 100% (120 of 120) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 3 km, Shankrappa Layout, MAruthi nagar |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Agrahara |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Water and Sanitation | |
|---|---|---|
| Electricity, built | 3% | |
| Community Hall, built | 0% | |
| Swimming Pool, built | 3% | |
| Parks, built | 0% | |
| Covered parking per unit | 1.39 (89 covered spaces for 64 units) | |
| Power backup | Not declared |
As the promoter reported itPossession date in the agreement

| Main structure | 15% · planned by 23 Mar 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 2 Jan 2029 | |
| Completion | 35% | |
| Completion, accountant | 49.5% of the estimated cost spent |
| Possession, agreement | 31 Jan 2030 | |
|---|---|---|
| Schedule end | 31 Jan 2030 | |
| RERA completion date | 31 Jan 2030 | |
| Completion date, agreement | 31 Jan 2030 | |
| Work began, as filed | 1 Jan 2025 |
| Building heights, fire NOC | 14.95 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Not provided |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 23 Nov 2024 | |
| Engineer's certificate, registration | Dated 28 Nov 2024 | |
| Architect's quarterly progress certificate | 35% complete per the architect, as of 14 Oct 2026 | |
| Architect's quarterly progress certificate dated | 14 Oct 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹15.46 Cr 31%Development · ₹34.36 Cr 69%
| Estimated cost, at registration | ₹49.82 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹25.00 Cr | |
| Cost incurred | ₹24.64 Cr (49.5% of the estimate) |
Sold (7) 10.9%Unsold (57) 89.1%
| Sold, Q3 2025-26 | 3 / 64 · 61 available | |
|---|---|---|
| Sold, Q4 2025-26 | 5 / 64 · 59 available | |
| Sold, Q1 2026-27 | 7 / 64 · 57 available | |
| Sold, Q2 2026-27 | 7 / 64 · 57 available | |
| Unsold, Q2 2026-27 | 57 | |
| Sold in Q4 2025-26 | 2 | |
| Sold in Q1 2026-27 | 2 | |
| Sold in Q2 2026-27 | 0 | |
| Flats booked, Form 4 Q1 2026-27 | 7 |
| Escrow bank | ICICI Bank | |
|---|---|---|
| Designated account, collected | ₹77.4 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹26.0 L in Q2 2026-27 (34% of that quarter's deposits) | |
| Amount withdrawable, Form 4 | ₹17,43,66,138 | |
| Net amount withdrawable, Form 4 | ₹15,59,43,076 | |
| Withdrawn from the escrow account to date | ₹1,84,23,062 |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 2 km |
| 31 Dec 2027 |
| 58% (152 of 262) |
| Locked |
| Sumadhura Solea | about 2.5 km | 30 Jun 2029 | 14% (32 of 233) | Locked |
|---|
| Sobha Dream Gardens Phase 5 - Wing 10 | about 2.5 km | 31 Dec 2028 | 97% (138 of 142) | Locked |
|---|
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 2.5 km | 31 Dec 2028 | 100% (364 of 364) | Locked |
|---|
| Projects within 4 km, counted | 78 (78 with an approximate location) | |
|---|---|---|
| Flats in them | 23,047 | |
| Booked | 14,317 of 23,047 (62%) | |
| Unsold | 8,730 | |
| Booked a month, pooled | 352 flats | |
| Months to sell, pooled | 24 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Water supply, as filed | Local authority (BWSSB) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 10.5 km, Yeshwantpur | |
| Metro, under construction | about 3 km, Yelahanka |
| Kempegowda Airport | 23 | 15.5 |
| MG Road (CBD) | 15 | 12.5 |
| Manyata Tech Park | 7 | 4.5 |
| ITPL, Whitefield | 23 | 16.5 |
| Ecospace, Bellandur ORR | 27.5 | 18.5 |
| Electronic City Ph 1 | 36.5 | 28 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2 km to the north-west, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | about 0.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |