Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | 1 | 1 | 2 | Red flag |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | ||
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Builder: FELICITY ADOBE LLP
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Status not on record 2 | ||||||
|---|---|---|---|---|---|---|
| 27 Mar 2024 | 00330/2024 | K-RERA | Tumakuru | Not stated | complaint | Not stated, Low: The record does not say whether it is decided. |
| 27 Mar 2024 | 00330/2024 | K-RERA | Tumakuru | Not stated | complaint | Not stated, Low: The record does not say whether it is decided. |
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| Not checked. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us.
| – |
| – |
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
| Area on the KGIS map | Not verified yet | |
|---|---|---|
| Land area of this registration | 18,419 sq m | |
| Building plan (BDA) | Not verified yet | |
|---|---|---|
| BESCOM | Filed with the registration | |
| Fire NOC (1 of 2) | Clear | |
| Fire NOC (2 of 2) | Clear | |
| SEIAA | Filed with the registration | |
| Airport height NOC | ||
| KSPCB | Filed with the registration | |
| RERA extensions | Granted · Approved 28 Sep 2022 | |
|---|---|---|
| RERA complaints | 1 | |
| RERA completion date | 4 Jan 2023 |
2BHK 100%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 979 | Not filed |
| Amenities declared | Earth work and other leveling preparation work · Foundation footing work · Plinth level Beam · RCC or MS Framed structure · Joinery: Doors, Windows, Ventilators etc · Basic work of Water supply, Sanitary and Electrification · Dadoing, Skirting, Flooring, Tiles work (All types) · Railing and Grill fixing · Electrification, Water supply and Sanitary Finishing · Wardrobe, Showcase, Kitchen cabinet, Puja work · Fire prevention and fire fighting fitting and fixture with network · Weather Proof work(tile,concrete) · Painting · Elevation work · Internal and External work including landscapes as per santioned drawings · Water Supply · Internal Roads & Footpaths · Sewage and Drainage System · Parks & Tree planting · Street Lighting · Provision for community buildings and for treatment and disposal of sewage and sullage water · Solid waste management and disposal · Fire protection and fire safety requirements · Education/Health/Other public amenities · Water Supply · Internal Roads & Footpaths · Sewage and Drainage System · Electricity supply transformer and substation · Solid waste management and disposal · Emergency Evacuation services · Storm water drains · Water conservation/rain water harvesting/recharge of ground water · Fire protection and fire safety requirements · Electricity · CCTV Surveillance · Club House · Community Hall · Outdoor Sports facility · Indoor Sports facility · Swimming Pool · Gym · Parks · Power Backup · Water and Sanitation · Staircases · Lifts · Staircases and Lift lobbies, corridor,lobbies, corridor · Fire escapes · Common entrance and exit for the building / common portico/foyer/verandah · Terrace · Outer Wall · Open parking areas and common storage spaces · Provision for lodging of management staff and security staff | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 4 Jan 2023 | |
| Work began, as filed | 5 May 2018 | |
The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety (1 of 2) | ||
| Fire safety (2 of 2) | ||
| Environmental clearance | Not verified yet | |
The promoter filed this with the registration.
| Estimated cost |
|---|
| ₹70.29 Cr |
| Cost incurred | Not verified yet | |
|---|---|---|
| Cost left | Not verified yet | |
|---|---|---|
| Collected from buyers | Not verified yet | |
|---|---|---|
| Receivable, sold flats | Not verified yet | |
|---|---|---|
| Land cost revision | Not verified yet | |
|---|---|---|
| Escrow bank | Bank of Maharashtra | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 1 | |
| Developer's project loan |
|---|
| Not verified yet |
| Records searched to | Not verified yet | |
|---|---|---|
| Building plan | Not verified yet | |
|---|---|---|
| Unregistered agreements, over 10% paid | Not verified yet | |
|---|---|---|
| Sale deed in favour of | Not verified yet | |
|---|---|---|
| Escrow bank | Bank of Maharashtra |
|---|