Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Builder: Felicity Adobe LLP
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| Not checked. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us.
| – |
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | 2 | Clear |
|---|
| Loan & collateral | – | – | – | – |
|---|
| Survey numbers | Sy No - 216/15A, Sy No - 216/11, Sy No - 216/8, Sy No - 216/16A, Sy No - 216/12, Sy No - 216/19 and 10 more | |
|---|---|---|
| Area on the KGIS map | Not verified yet | |
| Land area of this registration | 20,785 sq m | |
| Building plan (Belagavi Urban Development Authority) | Sanctioned 25 Nov 2021 · No. 01/2020-21/4186 | |
|---|---|---|
| Power NOC (BESCOM) | Not verified yet | |
| Fire NOC | Clear | |
| Environmental clearance | Not verified yet | |
| Airport height NOC | Not verified yet | |
| Pollution board (CFE) | Not verified yet | |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 26 Jan 2026 |
3BHK 43.5%2BHK 19.3%2BHK · avg 45 m² 19.1%3BHK · avg 57 m² 18%
| 2BHK | 206 | 1,00,535 |
| 2BHK | 208 | Not filed |
| 3BHK | 194 | 1,18,069 |
| 3BHK | 468 | Not filed |
| Sold, Q4 2025-26 | 336 / 338 | |
|---|---|---|
| Unsold, Q4 2025-26 | 2 |
| Amenities declared | Earth work and other leveling preparation work · Foundation footing work · Retaining wall (All types) · Plinth level Beam · Sub-structure flooring (Parking Floor, more than one floor below general ground level) · RCC or MS Framed structure · Masonry construction: Bricks, Concrete blocks etc · Plastering inside , outside & Ceiling · Joinery: Doors, Windows, Ventilators etc · Basic work of Water supply, Sanitary and Electrification · Dadoing, Skirting, Flooring, Tiles work (All types) · Railing and Grill fixing · Electrification, Water supply and Sanitary Finishing · Fire prevention and fire fighting fitting and fixture with network · Weather Proof work(tile,concrete) · Painting · Internal and External work including landscapes as per santioned drawings · Water Supply · Internal Roads & Footpaths · Sewage and Drainage System · Parks & Tree planting · Street Lighting · Provision for community buildings and for treatment and disposal of sewage and sullage water · Solid waste management and disposal · Energy management · Education/Health/Other public amenities · Water Supply · Internal Roads & Footpaths · Sewage and Drainage System · Electricity supply transformer and substation · Solid waste management and disposal · Storm water drains · Water conservation/rain water harvesting/recharge of ground water · Fire protection and fire safety requirements · Electricity · CCTV Surveillance · Club House · Community Hall · Outdoor Sports facility · Indoor Sports facility · Swimming Pool · Gym · Parks · Power Backup · Staircases · Lifts · Staircases and Lift lobbies, corridor,lobbies, corridor · Fire escapes · Basement · Terrace · Outer Wall · Open parking areas and common storage spaces · Earth work and other leveling preparation work · Foundation footing work · Retaining wall (All types) · Plinth level Beam · Sub-structure flooring (Parking Floor, more than one floor below general ground level) · RCC or MS Framed structure · Masonry construction: Bricks, Concrete blocks etc · Plastering inside , outside & Ceiling · Joinery: Doors, Windows, Ventilators etc · Basic work of Water supply, Sanitary and Electrification · Dadoing, Skirting, Flooring, Tiles work (All types) · Railing and Grill fixing · Electrification, Water supply and Sanitary Finishing · Fire prevention and fire fighting fitting and fixture with network · Weather Proof work(tile,concrete) · Painting · Internal and External work including landscapes as per santioned drawings · Water Supply · Internal Roads & Footpaths · Sewage and Drainage System · Parks & Tree planting · Street Lighting · Provision for community buildings and for treatment and disposal of sewage and sullage water · Solid waste management and disposal · Energy management · Education/Health/Other public amenities · Water Supply · Internal Roads & Footpaths · Sewage and Drainage System · Electricity supply transformer and substation · Solid waste management and disposal · Storm water drains · Water conservation/rain water harvesting/recharge of ground water · Fire protection and fire safety requirements · Electricity · CCTV Surveillance · Club House · Community Hall · Outdoor Sports facility · Indoor Sports facility · Swimming Pool · Gym · Parks · Power Backup · Staircases · Lifts · Staircases and Lift lobbies, corridor,lobbies, corridor · Fire escapes · Basement · Terrace · Outer Wall · Open parking areas and common storage spaces | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
As the promoter reported it
| Main structure | Not verified yet | |
|---|---|---|
| Electrical and plumbing finishing | Not verified yet | |
| Internal roads | 100% | |
| Club house | Not verified yet | |
| Completion | 100% | |
| Completion, accountant | Not verified yet | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 26 Jan 2026 | |
| Work began, as filed | 27 Jan 2022 | |
The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Structural safety certificate | Not verified yet | |
|---|---|---|
| Structural engineer, quarterly | Not verified yet | |
| Design consultants (Form 6) | Not verified yet | |
| Fire safety | ||
| Environmental clearance | Not verified yet | |
The promoter filed this with the registration.
| Estimated cost | ₹80.30 Cr | |
|---|---|---|
| Cost incurred | Not verified yet | |
| Cost left | Not verified yet | |
| Collected from buyers | Not verified yet | |
| Receivable, sold flats | Not verified yet | |
| Land cost revision | Not verified yet | |
Sold (336) 99.4%Unsold (2) 0.6%
| Sold, Q3 2025-26 | 336 / 338 · 2 available | |
|---|---|---|
| Sold, Q4 2025-26 | 336 / 338 · 2 available | |
| Unsold, Q4 2025-26 | 2 | |
| Sold in Q4 2025-26 | 0 |
| Escrow bank | Canara Bank | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Withdrawn from the escrow account to date | ₹74,38,433 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan | Not verified yet | |
|---|---|---|
| Records searched to | Not verified yet | |
| Building plan | Sanctioned 25 Nov 2021 | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| Sale deed in favour of | Not verified yet | |
| Escrow bank | Canara Bank | |