Approvals
| Building plan (BBMP) | Sanctioned 1 May 2022 · No. BBMP/Ad.Com./YLK/0691/21-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
2BHK · avg 86 m² 60%3BHK · avg 116 m² 40%
Location & risks
Construction & progress
Developer
Land · ₹6.33 Cr 27.5%Development · ₹16.70 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 1 May 2022 | |
| Escrow bank | STATE BANK OF INDIA · MG Road Branch |
Data room
100 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | 1 | – | Review |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Adarsh Greens Phase 1Extended to 31-10-2026 | ADARSH HAVEN PRIVATE LIMITED | Apartment | 366–635 sqft carpet (as filed) | Oct 2025 |
| Adarsh Greens Phase 2Extended to 31-05-2027 | ADARSH HAVEN PRIVATE LIMITED | Apartment | 635 sqft carpet (as filed) | May 2026 |
| Adhishree SunshineWithdrawn | ADHISHREE VENTURES INDIA PVT LTD | Apartment | – | Sep 2021 |
| Adi's North LakeCompleted (regulator flag) | ADI DEVELOPERS | Apartment | 1,435 sqft carpet (as filed) | Completed |
| Affinity SowparnikaCompleted · OC 29-04-2019 | Affinity Projects | Apartment | – | Completed |
| Anugrha ApartmentLapsed · completion date passed | Gayathri Krishna Infrastructure Prospects Private limited | Apartment | – | Apr 2018 |
| Arun Auroville Phase ILapsed · completion date passed | Arun Shelters Pvt Ltd | Apartment | 2,716 sqft carpet (as filed) | May 2021 |
| Arvind SkylandsCompleted · OC 03-02-2020 | Arvind SmartSpaces Limited | Apartment | 1,063 sqft carpet (as filed) | Completed |
8 of 44 other projects in Jakkur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Tetra Grand Green Essence in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2025 |
| Land conversion | Converted 5 Jan 2015 · DC Bangalore | |
|---|---|---|
| Survey numbers | 94/2 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 24 | 925 |
| 3BHK | 16 | 1,251 |
| Sobha City Athena | about 1.5 km | Locked | |
|---|---|---|---|
| Assetz Soho & Sky Phase 1b | about 2 km | Locked | |
| Sumadhura Epitome | about 2.5 km | Locked | |
| Sobha Dream Gardens Phase 5 - Wing 10 | about 2.5 km | Locked | |
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 2.5 km | Locked | |
| Sobha Dream Gardens Phase 3 - Wing 3 And 4 | about 2.5 km | Locked | |
| Sumadhura Solea | about 2.5 km | Locked | |
| Sattva La Vita | about 2.5 km | Locked | |
| 4square Park Sierra | about 2.5 km | Locked | |
| Cumins Sanctum | about 2.5 km | Locked | |
| Legacy Salvador | about 3 km | Locked | |
| Assetz Soho & Sky | about 3 km | Locked |
| Tetra Grand Green Essence This project | This project is the point the others are measured from | 31 Dec 2025 | – | Not verified yet |
|---|---|---|---|---|
| Sobha City Athena | about 1.5 km | 30 Sep 2027 | 100% (72 of 72) | Locked |
| Assetz Soho & Sky Phase 1b | about 2 km | 31 Dec 2027 | 100% (120 of 120) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 3 km, Shankrappa Layout, MAruthi nagar |
|---|
| Nearest storm drain | about 0.5 km, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Agrahara |
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.10 (44 covered spaces for 40 units) | |
| Power backup | Declared by the promoter |
| Possession, agreement | 31 Dec 2025 | |
|---|---|---|
| Schedule end | 15 May 2025 | |
| RERA completion date | 31 Dec 2025 | Review |
| Work began, as filed | 1 Jul 2023 |
| Building heights, fire NOC | 11.48 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 5 sq m |
|---|
| Architect's certificate, registration | Site inspected 20 May 2023 | |
|---|---|---|
| Engineer's certificate, registration | Dated 5 May 2023 | |
| Chartered accountant's certificate, registration | Dated 30 May 2023 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹23.03 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹16.20 Cr |
| Escrow bank | STATE BANK OF INDIA · MG Road Branch |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 2.5 km |
| 31 Dec 2027 |
| 58% (152 of 262) |
| Locked |
| Sobha Dream Gardens Phase 5 - Wing 10 | about 2.5 km | 31 Dec 2028 | 97% (138 of 142) | Locked |
|---|
| Sobha Dream Gardens Phase 4 - Wing 1 And 2 | about 2.5 km | 31 Dec 2028 | 100% (364 of 364) | Locked |
|---|
| Sobha Dream Gardens Phase 3 - Wing 3 And 4 | about 2.5 km | 31 Dec 2027 | 100% (364 of 364) | Locked |
|---|
| Projects within 4 km, counted | 80 (80 with an approximate location) | |
|---|---|---|
| Flats in them | 23,147 | |
| Booked | 14,360 of 23,147 (62%) | |
| Unsold | 8,787 | |
| Booked a month, pooled | 354 flats | |
| Months to sell, pooled | 24 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, primary drain | |
|---|---|---|
| Metro, operational | about 10.5 km, Yeshwantpur | |
| Metro, under construction | about 3 km, Yelahanka |
| Kempegowda Airport | 23 | 15.5 |
| MG Road (CBD) | 15 | 12.5 |
| Manyata Tech Park | 7 | 4.5 |
| ITPL, Whitefield | 23 | 16.5 |
| Ecospace, Bellandur ORR | 28 | 19 |
| Electronic City Ph 1 | 36.5 | 28 |
| Landfill or waste transfer station | about 3 km to the north-east, named Bellahalli Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 2 km, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | about 0.5 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |