| Building plan (BMRDA) | Sanctioned 5 Sep 2023 · No. LAO/31/2022-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹14.11 Cr 69.1%Development · ₹6.30 Cr 30.9%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 19 Jun 2024 | Review |
| Building plan (BMRDA) | Sanctioned 5 Sep 2023 | |
| Escrow bank | YES BANK · HSR Layout Bangalore |
Data room
742 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 13 cadastral survey plots named in the filing outlined. The outline is the land, not the building. 13 of 58 filed survey numbers matched, 45 found no plot. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | 1 | – | Review |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | 1 | – | Review |
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) | M/s.Abhee Developers | Plot | – | Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 270 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open The Cape in the interactive atlas
| Survey | Land converted | Sale deed | Khata | Extent |
|---|
| Survey 20 | ||||
|---|---|---|---|---|
| 20/1 | 13 Oct 2021Deputy commissioner, Bengaluru Urban district. | No sale deed | 8 Nov 2021E Khatha · Thasildhar | 24 Guntas |
| 20/2 | 30 Apr 2022Deputy commissioner, Bengaluru Urban district. | No sale deed | 6 May 2022E Khatha · Thasildhar | 4 Guntas |
| Survey 22 | ||||
|---|---|---|---|---|
| 22/3 | 15 Feb 2022Deputy commissioner, Bengaluru Urban district. | 31 Dec 2004 | 8 Mar 2022E Khatha · Thasildhar | 2 Guntas |
| 22/4 | 15 Jun 2022Deputy commissioner, Bengaluru Urban district. | 31 Dec 2004 | 6 Aug 2022E Khatha · Thasildhar | 6 Guntas |
| Survey 23 | ||||
|---|---|---|---|---|
| 23/1 | 17 Jul 2021Deputy commissioner, Bengaluru Urban district. | 31 Dec 2004 | 29 Jul 2021E Khatha · Thasildhar | 28 Guntas |
| 23/3 | 30 Apr 2022Deputy commissioner, Bengaluru Urban district. | 31 Dec 2004 | 6 May 2022E Khatha · Thasildhar | 3 guntas |
| 24 | 30 Apr 2022Deputy commissioner, Bengaluru Urban district. | 4 Nov 2020 | 6 May 2022E Khatha · Thasildhar | 25 guntas |
|---|
| Survey 25 | ||||
|---|---|---|---|---|
| 25/1 | 6 Apr 2022Deputy commissioner, Bengaluru Urban district. | 2 Feb 1989 | 12 Apr 2022E Khatha · Thasildhar | 12.08 guntas |
| 25/2 | 6 Apr 2022Deputy commissioner, Bengaluru Urban district. | No sale deed | 12 Apr 2022E Khatha · thasildhar | 12.08 guntas |
| 25/5 | 10 Dec 2021Deputy commissioner, Bengaluru Urban district. | 1 Oct 2015 | 8 Nov 2021E Khatha · Thasildhar | 5 guntas |
| 26 | 6 Apr 2022Deputy commissioner, Bengaluru Urban district. | 24 Sep 2020 | 12 Apr 2022E Khatha · Thasildhar | 7 guntas |
|---|
| Survey 27 | ||||
|---|---|---|---|---|
| 27/1 | 13 Oct 2021Deputy commissioner, Bengaluru Urban district. | 20 Nov 2020 | 8 Nov 2021E Khatha · Thasildhar | 4.8 guntas |
| 27/2 | 13 Oct 2021Deputy commissioner, Bengaluru Urban district. | 1 Oct 2015 | 8 Nov 2021E Khatha · Thasildhar | 3.4 guntas |
| 27/3 | 10 Dec 2021Deputy commissioner, Bengaluru Urban district. | 1 Oct 2015 | 8 Nov 2021E Khatha · Thasildahr | 9.12 guntas |
| 27/4 | 13 Oct 2021Deputy commissioner, Bengaluru Urban district. | 1 Oct 2015 | 8 Nov 2021E Khatha · Thasildhar | 9.8 guntas |
| 27/6 | 10 Dec 2021Deputy commissioner, Bengaluru Urban district. | 1 Oct 2015 | 8 Nov 2021E Khatha · thasildhar | 5 guntas |
| Survey 28 | ||||
|---|---|---|---|---|
| 28/1 | 15 Jun 2022Deputy commissioner, Bengaluru Urban district. | No sale deed | 8 Jun 2023E Khatha · Thasildhar | 7.8 guntas |
| 28/2, 28/3, 28/4 | 15 Jun 2022Deputy commissioner, Bengaluru Urban district. | No sale deed | 5 Aug 2022E Khatha · Thasildhar | 7.4 guntas + 7.12 guntas + 39.08 guntas |
| Survey 29 | ||||
|---|---|---|---|---|
| 29/1 | 6 May 2017Deputy commissioner, Bengaluru Urban district. | 27 Feb 2006 | 21 Jan 2019E Khatha · Thasildhar | 13 guntas |
| 29/2 | 30 Apr 2022Deputy commissioner, Bengaluru Urban district. | 27 Jan 2016 | 5 May 2022E Khatha · Thasildhar | 13 guntas |
| 30/1 | 6 May 2017Deputy commissioner, Bengaluru Urban district. | 20 Jan 2007 | 15 Feb 2023E Khatha · Thasildhar | 11 guntas |
|---|
| Survey 31 | ||||
|---|---|---|---|---|
| 31/2 | 15 Jun 2022Deputy commissioner, Bengaluru Urban district. | No sale deed | 5 Aug 2022E Khatha · Thasildhar | 19 guntas |
| 31/3 | 25 Aug 2022Deputy commissioner, Bengaluru Urban district. | No sale deed | 20 Oct 2022E Khatha · Thasildhar | 13.04 guntas |
| Survey 32 | ||||
|---|---|---|---|---|
| 32/1 | 17 Jul 2021Deputy commissioner, Bengaluru Urban district. | No sale deed | 29 Jul 2021E Khatha · Thasildhar | 9 guntas |
| 32/2 | 25 Aug 2022Deputy commissioner, Bengaluru Urban district. | No sale deed | 29 Jul 2021E Khatha · THASILDHAR | 1 GUNTA |
| 32/3 | 7 Jul 2021Deputy commissioner, Bengaluru Urban district. | No sale deed | 29 May 2024E Khatha · Thasildhar | 14 guntas |
| 32/4 | 1 Oct 2005Deputy commissioner, Bengaluru Urban district. | 16 Dec 2005in favour of M/S Peace Developers Rep M v Bhaskar Reddy | 21 Jan 2019E Khatha · Thasildhar | 10 guntas |
| 32/5 | 15 Feb 2022Deputy commissioner, Bengaluru Urban district. | No sale deed | 8 Mar 2022E Khatha · Sub - Registrar, Anekal | 6 guntas |
| 32/6 | 12 Aug 2022Deputy commissioner, Bengaluru Urban district. | No sale deed | 29 Oct 2022E Khatha · Thasildhar | 16 guntas |
| Survey 33 | ||||
|---|---|---|---|---|
| 33/1 | 12 Aug 2022Deputy commissioner, Bengaluru Urban district. | No sale deed | 20 Oct 2022E Khatha · Thasildhar | 7 guntas |
| 33/2 | 17 Jul 2021Deputy commissioner, Bengaluru Urban district. | No sale deed | 20 Oct 2022E Khatha · Thasildhar | 8 guntas |
| 35/2, 35/3 | 17 Jul 2021Deputy commissioner, Bengaluru Urban district. | 17 Sep 2019 | 29 Jul 2021E Khatha · Thasildhar | 12 guntas + 13 guntas |
|---|
| Survey 36 | ||||
|---|---|---|---|---|
| 36/3 | 30 Apr 2022Deputy commissioner, Bengaluru Urban district. | 18 Mar 2021 | 6 May 2022E Khatha · Thasildhar | 6.8 guntas |
| 36/5 | 12 Aug 2022Deputy commissioner, Bengaluru Urban district. | No sale deed | 20 Oct 2022E Khatha · Thasildhar | 6.08 guntas |
| Survey 37 | ||||
|---|---|---|---|---|
| 37/1 | 25 Aug 2022Deputy commissioner, Bengaluru Urban district. | 18 Mar 2021 | 20 Oct 2022E Khatha · Thasildhar | 14 guntas |
| 37/2 | 30 Apr 2022Deputy commissioner, Bengaluru Urban district. | No sale deed | 5 May 2022E Khatha · Thasildhar | 9 guntas |
| 37/3 | 25 Aug 2022Deputy commissioner, Bengaluru Urban district. | 18 Mar 2021 | 20 Oct 2022E Khatha · Thasildhar | 8.8 guntas |
| Survey 39 | ||||
|---|---|---|---|---|
| 39/1 | 1 Oct 2005Deputy commissioner, Bengaluru Urban district. | 16 Nov 2005in favour of M/S PEACE DEVELOPERS REP BY MV BHASKAR REDDY | 21 Jan 2019E Khatha · Thasildhar | 10 guntas |
| 39/2 | 1 Jan 2005Deputy commissioner, Bengaluru Urban district. | 16 Nov 2005in favour of M/S Peace Developers Rep By M V Bhaskar Reddy | 21 Jan 2019E Khatha · Thasildhar | 38 guntas |
| 40 | 10 Dec 2021Deputy commissioner, Bengaluru Urban district. | No sale deed | 8 Nov 2021E Khatha · Thasildhar | 23 guntas |
|---|
| 41 | 6 May 2017Deputy commissioner, Bengaluru Urban district. | 24 Feb 2006 | 28 Oct 2022E Khatha · Thasildhar | 1 Acre 25.8 guntas |
|---|
| 43/1 | 6 May 2017Deputy commissioner, Bengaluru Urban district. | 25 Apr 2007 | 10 Jul 2015E Khatha · tHASILDAHAR | 22 GUNTAS |
|---|
| Survey 78 | ||||
|---|---|---|---|---|
| 78/1 | 17 Oct 2022Deputy commissioner, Bengaluru Urban district. | 30 Nov 2005 | 28 Oct 2022E Khatha · Thasildhar | 8.4 GUNTAS |
| 78/2 | 17 Oct 2022Deputy commissioner, Bengaluru Urban district. | 1 Mar 2006 | 28 Oct 2022E Khatha · Thasildhar | 14.12 guntas |
| Survey 73 | ||||
|---|---|---|---|---|
| 73/1 | 1 Oct 2005Deputy commissioner, Bengaluru Urban district. | 14 Dec 2005in favour of M/S PEACE DEVELOPERS REP BY M V BHASKAR REDDY | 26 Dec 2022E Khatha · Thasildhar | 11 guntas |
| 73/2A | 1 Oct 2005Deputy commissioner, Bengaluru Urban district. | 14 Dec 2005 | 26 Dec 2022E Khatha · Thasildhar | 4 guntas |
| 73/2B | 28 Sep 2022Deputy commissioner, Bengaluru Urban district. | 1 Dec 2021in favour of M/S PEACE DEVELOPERS | 25 Oct 2022E Khatha · thasildhar | 4 GUNTAS |
| 72 | 1 Oct 2005Deputy commissioner, Bengaluru Urban district. | 14 Dec 2005 | 10 Jul 2015E Khatha · Thasildhar | 14 guntas |
|---|
| Survey 69 | ||||
|---|---|---|---|---|
| 69/2 | 1 Oct 2005Deputy commissioner, Bengaluru Urban district. | 28 Nov 2005in favour of M/S peace Developers in favour of M V Bhaskar Reddy | 15 Jul 2015E Khatha · thailshar | 4 guntas |
| 69/1 | 1 Oct 2005Deputy commissioner, Bengaluru Urban district. | 14 Dec 2005in favour of M/s Peace Developers Rep by M/S Bhaskar Reddy | 26 Dec 2022E Khatha · Thasildhar | 13 guntas |
| 70 | 1 Oct 2005Deputy commissioner, Bengaluru Urban district. | 28 Nov 2005in favour of M/S Peace Developers | 10 Jul 2015E Khatha · Thasildhar | 36 guntas |
|---|
| 71 | 1 Oct 2005Deputy commissioner, Bengaluru Urban district. | 28 Nov 2005 | 10 Jul 2015E Khatha · Thasildhar | 18 guntas |
|---|
| Survey 67 | ||||
|---|---|---|---|---|
| 67/2 | 1 Oct 2005Deputy commissioner, Bengaluru Urban district. | 28 Nov 2005in favour of M/S Peace Developers Rep By M V Bhaskar Reddy | 10 Jul 2015E Khatha · Thasildhar | 5 guntas |
| 67/1 | 1 Oct 2005Deputy commissioner, Bengaluru Urban district. | 14 Dec 2005in favour of M/S Peace Developers Rep by M V Bhaskar Reddy | 26 Dec 2022E Khatha · Thasiladhar | 23 guntas |
| 68 | 1 Oct 2005Deputy commissioner, Bengaluru Urban district. | 14 Dec 2005in favour of M/S Peace Developers Rep by M V Bhaskar Reddy | 28 Dec 2022E Khatha · Thasildhar | 15 guntas |
|---|
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed executed
No. ANK-1-10723-2005-06 · Book 1
Title deed filed with K-RERA, pp. 1, 4 · See it in Documents
Transfer of the land
Title deed executed
No. ANK-1-10722-2005-06 · Book 1 · Consideration ₹18.0 L · Sy 67/1; 68; 69/1, Avadadenahalli village, Anekal taluk
Title deed filed with K-RERA, pp. 1, 4, 7, 13 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹18.0 L
Title deed filed with K-RERA, pp. 1, 7 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹1.8 L · Sy 78, Kasaba hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 11, 17 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹3.5 L
Title deed filed with K-RERA, pp. 1, 11 · See it in Documents
Transfer of the land
Title deed executed
Sy 78, Anekal taluk
Title deed filed with K-RERA, pp. 1, 17 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹1.8 L · Sy 78, Kasaba hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 11, 17 · See it in Documents
Transfer of the land
Title deed registered
No. ANK-1-11318-2005-06 · Book 1 · executed 17 Nov 2005 · Consideration ₹22.5 L
Title deed filed with K-RERA, pp. 1, 6, 10 · See it in Documents
Transfer of the land
Title deed registered
No. ANK-1-11935-2005-06 · Book 1 · executed 16 Nov 2005 · Consideration ₹10.1 L · Sy 73/1; 73/2A; 72
Title deed filed with K-RERA, pp. 1, 6, 9, 13 · See it in Documents
Transfer of the land
Title deed executed
No. ANK-1-30643-2006-07 · Book 1 · Sy 30/1, Kasaba hobli, Anekal taluk · 11 Guntas
Title deed filed with K-RERA, pp. 1, 10, 15 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹2.6 L
Title deed filed with K-RERA, pp. 1, 7 · See it in Documents
Transfer of the land
Title deed registered
No. ANK-1-18236-2005-06 · Book 1 · executed 17 Nov 2005 · Consideration ₹3.5 L
Title deed filed with K-RERA, pp. 1, 10, 11 · See it in Documents
Transfer of the land
Title deed registered
No. ANK-1-00343-2007-08 · Book 1 · executed 20 Dec 2006 · Consideration ₹4.4 L
Title deed filed with K-RERA, pp. 1, 7, 10 · See it in Documents
Transfer of the land
Title deed registered
No. ANK-1-02810-2015-16 · Book 1 · Sy 27; 27/5, Kasaba hobli, Anekal taluk; Sy 27; 2, Kasaba hobli, Anekal taluk; and 2 more items
Title deed filed with K-RERA, pp. 4, 9, 10, 11 · See it in Documents
Transfer of the land
Title deed registered
No. ANK-1-04921-2015-16 · Book 1
Title deed filed with K-RERA, p. 1 · See it in Documents
Transfer of the land
Title deed registered
No. JGN-1-06200-2016-17 · Book 1
Title deed filed with K-RERA, p. 8 · See it in Documents
Transfer of the land
Title deed executed
Sy 22/2, Kasaba hobli; Sy 33/2, Kasaba hobli · 8 guntas; and 13 more items
Title deed filed with K-RERA, pp. 1, 16, 17, 18, 19, 20, 21, 23, 24, 25 · See it in Documents
Transfer of the land
Title deed registered
No. ANK-1-04331-2019-20 · Book 1 · executed 4 Sep 2019 · Sy 22/2, Kasaba hobli; Sy 33/2, Kasaba hobli · 08 guntas; and 8 more items
Title deed filed with K-RERA, pp. 1, 10, 16, 17, 18, 19, 20, 23, 25 · See it in Documents
Transfer of the land
Title deed executed
Sy 25, Kasaba hobli, Anekal taluk; Sy 28, Kasaba hobli, Anekal taluk · 39 Guntas
Title deed filed with K-RERA, pp. 1, 23 · See it in Documents
Transfer of the land
Title deed executed
Sy 25, Byagadadenahalli village, Kasaba hobli
Title deed filed with K-RERA, pp. 1, 33 · See it in Documents
Transfer of the land
Title deed executed
Sy 23/1, Kasaba hobli · 28 Guntas; Sy 23/2, Kasaba hobli · 03 Guntas; and 1 more item
Title deed filed with K-RERA, pp. 1, 21 · See it in Documents
Transfer of the land
Title deed executed
Sy 33/1, Kasaba hobli, Anekal taluk · 07 Guntas; Sy 34/1, Kasaba hobli · 12 Guntas
Title deed filed with K-RERA, pp. 1, 43, 45 · See it in Documents
Transfer of the land
Title deed executed
Sy 33/2, Kasaba hobli, Anekal taluk; Sy 22/2, Byagadadenahalli village, Anekal taluk · 11 Guntas; and 1 more item
Title deed filed with K-RERA, pp. 1, 43, 45 · See it in Documents
Transfer of the land
Title deed executed
Sy 32/3 · 14 Guntas; Sy 32/5 · 6 Guntas
Title deed filed with K-RERA, pp. 1, 25 · See it in Documents
Transfer of the land
Title deed executed
Sy 32/2, Kasaba hobli · 01 Gunta; Sy 40, Kasaba hobli · 23 Guntas
Title deed filed with K-RERA, pp. 1, 25 · See it in Documents
Transfer of the land
Title deed executed
Byagadadenahalli village, Kasaba hobli; Byagadadenahalli village, Kasaba hobli; and 2 more items
Title deed filed with K-RERA, pp. 1, 25, 27 · See it in Documents
Transfer of the land
Title deed registered
executed 24 Sep 2020 · Consideration ₹18.5 L
Title deed filed with K-RERA, pp. 1, 3, 6 · See it in Documents
Transfer of the land
Title deed executed
Sy 20/2, Byagadadenahalli village, Kasaba hobli, Anekal taluk · 04 Guntas; Sy 31; 17025080, Byagadadenahalli village, Kasaba hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 37 · See it in Documents
Transfer of the land
Title deed registered
No. ANK-1-03869-2020-21 · Book 1 · executed 4 Nov 2020 · Consideration ₹46.0 L
Title deed filed with K-RERA, pp. 1, 3, 6 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹46.0 L
Title deed filed with K-RERA, pp. 1, 3 · See it in Documents
Transfer of the land
Title deed executed
Sy 36/1, Kasaba hobli; Sy 36/2, Kasaba hobli; and 2 more items
Title deed filed with K-RERA, pp. 1, 22, 23 · See it in Documents
Transfer of the land
Title deed executed
No. ANK-1-07729-2020-21 · Book 1 · Sy 36/3, Kasaba hobli; Sy 31/1, Kasaba hobli · 14 Guntas; and 1 more item
Title deed filed with K-RERA, pp. 1, 4, 7, 8 · See it in Documents
Transfer of the land
Title deed registered
No. ANK-1-07729-2020-21 · Book 1 · executed 9 Mar 2021 · Sy 36/2, Kasaba hobli, Anekal taluk; Sy 37/1, Kasaba hobli, Anekal taluk · 14 Guntas
Title deed filed with K-RERA, pp. 1, 4, 7 · See it in Documents
Transfer of the land
Title deed executed
Sy 36/5; 36/3, Kasaba hobli
Title deed filed with K-RERA, pp. 1, 33 · See it in Documents
Transfer of the land
Title deed executed
Sy 67/1, Avvadadenahalli village; Sy 69/1, Avvadadenahalli village; and 13 more items
Title deed filed with K-RERA, pp. 1, 31, 32, 33, 34, 35, 36 · See it in Documents
Transfer of the land
Title deed registered
No. ABL-1-06685-2021-22 · Book 1 · executed 30 Nov 2021 · Consideration ₹7.6 L · Sy 73/2B, Avadadenahalli village, Kasaba hobli
Title deed filed with K-RERA, pp. 1, 5, 10, 13 · See it in Documents
Approval or registration
Building plan sanctioned
BMRDA · plan LAO/31/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/111124/007213
K-RERA registration ·
Approval or registrationTransfer of the landTitle check
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 19 Jun 2024 |
|---|
| Developer's project loan | None declared |
|---|
| Filed survey numbers matched to the KGIS map | 13 of 58 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 20,601 sq m | |
| Extent the filed land schedule names for these survey numbers | 17,152 sq m | |
| Plot area against the filed extent | 1.2 times | |
| Village, hobli and taluk on the KGIS map | Avuda Denahalli, KASABA2 hobli, ANEKAL taluk | |
| Sy. 72: filed extent, KGIS plot | 1,416 sq m, 1,437 sq m | |
| Sy. 70: filed extent, KGIS plot | 3,642 sq m, 3,849 sq m | |
| Sy. 71: filed extent, KGIS plot | 1,821 sq m, 1,681 sq m | |
| Sy. 68: filed extent, KGIS plot | 1,518 sq m, 1,828 sq m | |
| Mutation entry | 5 open across 40 of 40 filed surveys |
Satellite map with the 13 cadastral survey plots named in the filing outlined. The outline is the land, not the building. 13 of 58 filed survey numbers matched, 45 found no plot. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 20/1, 20/2, 22/3, 22/4, 23/1, 23/3 and 52 more | |
|---|---|---|
| Whole survey numbers on the KGIS map | 20,601 sq m (the project holds a share) | |
| Khata | E Khatha · Thasildhar · 8 Nov 2021; E Khatha · Thasildhar · 6 May 2022; E Khatha · Thasildhar · 8 Mar 2022; and 24 more | |
| Sale deed | Dated 2 Feb 1989, 31 Dec 2004, 16 Nov 2005 and 17 more | |
| Sale deed in favour of | M/S Peace Developers Rep M v Bhaskar Reddy, M/S PEACE DEVELOPERS REP BY MV BHASKAR REDDY, M/S Peace Developers Rep By M V Bhaskar Reddy and 6 more | |
| Title deed | Sy 36/3, Byagadadenahalli village, Kasaba hobli; Sy 37/3, Kasaba hobli | |
| Title deed | Sy 68, Avvadadenahalli village; Sy 69/1, Avvadadenahalli village; and 9 more items | |
| Title deed | Sy 28, Kasaba hobli | |
| Title deed | Sy 23/1, Byagadadenahalli village, Kasaba hobli · 28 Guntas; Sy 23/2, Byagadadenahalli village, Kasaba hobli · 03 Guntas; and 2 more items | |
| Title deeds | And 3 more read from the filing |
| Sy. No. 78/1 | Not read yet | 0 | ||||||
| Sy. No. 78/2 | Not read yet | 0 | ||||||
| Sy. No. 73/1 | Not read yet | 0 | ||||||
| Sy. No. 73/2A | Not read yet | 0 | ||||||
| Sy. No. 73/2B |
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 5 Mar 2024 |
| Land conversion | 58 of 58 parcels converted | |
|---|---|---|
| Sy 20/1, 27/1, 27/2, 27/4 | Converted 13 Oct 2021 · Deputy commissioner, Bengaluru Urban district. | |
| Sy 20/2, 23/3, 24, 29/2, 36/3, 37/2 | Converted 30 Apr 2022 · Deputy commissioner, Bengaluru Urban district. | |
| Sy 22/3, 32/5 | Converted 15 Feb 2022 · Deputy commissioner, Bengaluru Urban district. | |
| Sy 22/4, 28/1, 28/2, 28/3, 28/4, 31/2 | Converted 15 Jun 2022 · Deputy commissioner, Bengaluru Urban district. | |
| Sy 23/1, 32/1, 33/2, 35/2, 35/3 | Converted 17 Jul 2021 · Deputy commissioner, Bengaluru Urban district. | |
| Sy 25/1, 25/2, 26 | Converted 6 Apr 2022 · Deputy commissioner, Bengaluru Urban district. | |
| Other parcels | 9 more groups on the filing | |
| Survey numbers | 20/1 · 20/2 · 22/3 · 22/4 · 23/1 · 23/3 · 24 · 25/1 · 25/2 · 26 · 27/1 · 27/2 · 27/3 · 27/4 · 25/5 · 27/6 · 28/1 · 28/2 · 28/3 · 28/4 · 29/1 · 29/2 · 30/1 · 31/2 and 34 more parcels |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 6 (6 with an approximate location) | |
|---|---|---|
| Plots in them | 1,218 | |
| Booked | 465 of 1,218 (38%) | |
| Unsold | 753 | |
| Booked a month, pooled | 31 plots | |
| Months to sell, pooled | 5 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | 49% Residential (main), 43% Industrial (general), 8% Public & semi-public, over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 14.5 km, G K LAYOUT | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Possession, agreement | 3 Dec 2027 | |
|---|---|---|
| RERA completion date | 5 Mar 2024 | |
| Work began, as filed | 1 Dec 2023 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹20.41 Cr |
|---|
| Escrow bank | YES BANK · HSR Layout Bangalore | |
|---|---|---|
| Share of collections the promoter declared for escrow | 70% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Not read yet |
| 0 |
| Sy. No. 72 | Not read yet | 14 guntas | 14 guntas | Yes | 0 |
| Sy. No. 69/2 | Not read yet | 0 |
| Sy. No. 69/1 | Not read yet | 0 |
| Sy. No. 70 | Not read yet | 36 guntas | 38 guntas | Differs: 2 guntas apart | 0 |
| Sy. No. 71 | Not read yet | 18 guntas | 17 guntas | Yes | 0 |
| Sy. No. 67/2 | Not read yet | 0 |
| Sy. No. 67/1 | Not read yet | 0 |
| Sy. No. 68 | Not read yet | 15 guntas | 18 guntas | Differs: 3 guntas apart | 0 |
| Sy. No. 20/1 | Not read yet | 1 |
| Sy. No. 20/2 | Not read yet | 0 |
| Sy. No. 22/3 | Not read yet | 1 |
| Sy. No. 22/4 | Not read yet | 1 |
| Sy. No. 23/1 | Not read yet | 0 |
| Sy. No. 23/3 | Not read yet | 0 |
| Sy. No. 24 | Not read yet | 0 |
| Sy. No. 25/1 | Not read yet | 0 |
| Sy. No. 25/2 | Not read yet | 0 |
| Sy. No. 26 | Not read yet | 0 |
| Sy. No. 27/1 | Not read yet | 0 |
| Sy. No. 27/2 | Not read yet | 0 |
| Sy. No. 27/3 | Not read yet | 0 |
| Sy. No. 27/4 | Not read yet | 0 |
| Sy. No. 25/5 | Not read yet | 0 |
| Sy. No. 27/6 | Not read yet | 0 |
| Sy. No. 28/1 | Not read yet | 0 |
| Sy. No. 28/2 | Not read yet | 0 |
| Sy. No. 28/3 | Not read yet | 1 |
| Sy. No. 28/4 | Not read yet | 1 |
| Sy. No. 29/1 | 1 | 32 guntas | 0 |
| Sy. No. 29/2 | Not read yet | 0 |
| Sy. No. 30/1 | Not read yet | 0 |
| Sy. No. 31/2 | Not read yet | 0 |
| Sy. No. 31/3 | Not read yet | 0 |
| Sy. No. 32/1 | Not read yet | 0 |
| Sy. No. 32/2 | Not read yet | 0 |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Local authority (Bygadadenahalli Grama Panchayathi) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 8 km, Bommasandra | |
| Metro, under construction | about 18 km, Kalena Agrahara |
| Kempegowda Airport | 63.5 | 50 |
| MG Road (CBD) | 29 | 27.5 |
| Manyata Tech Park | 40 | 34 |
| ITPL, Whitefield | 33 | 26.5 |
| Ecospace, Bellandur ORR | 24.5 | 20 |
| Electronic City Ph 1 | 11.5 | 10.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named STP on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Anekal on OpenStreetMap |