Overview
The Residences At Brigade Tech Gardens
Overview
The Residences At Brigade Tech Gardens
Overview
The Residences At Brigade Tech Gardens
Overview
Photo: The Residences at Brigade Tech GardensTitle & ownership
Approvals
| Building plan (BBMP) | Sanctioned 3 Dec 2022 · No. BBMP/Addl.Dir/JD North/0139/2016-17 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹31.92 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 3 Dec 2022 | |
| Escrow bank | HDFC · World Trade Centre |
Data room
126 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
I had a truly positive experience here. The facilities are excellent and well-kept. 🤩 The location is also very convenient, which was a huge plus for me. 👍 The swimming pool is fantastic! 🏊♀️✨
This is a prime location at Brookfield and is on the Kundalahalli Main Road. We went here to see a flat for buying but I didn’t liked the design as the kitchen is fully closed and there is no window that side. This kind of design is good…
I’ve had a very disappointing experience with Brigade, their management is absolutely pathetic, and this will be my last project with them. I truly enjoy my other properties, but I would never recommend Brigade builder to anyone as far as…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | 1 | – | Review |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
All 455 projects in Whitefield → · Brigade Group's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open The Residences At Brigade Tech Gardens in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Fire NOC |
|---|
| GBC(1)512/2015 | Clear |
| Environmental clearance | SEIAA 138 CON 2015 · issued 2 Sep 2016 | Clear |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | consent order AW-345586 · issued 22 Oct 2024 |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 3 Dec 2022 |
| Land conversion | Converted 30 Jun 1992 · Deputy Commissioner | |
|---|---|---|
| Survey numbers | 113/1B |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
2 bedroom + 2 toilet + study 20%2 bedroom + 2 toilet + study 6.7%3 bedroom + 3 toilet + study 6.7%3 bedroom + 3 toilet + study 6.7%9 other types 60%
| 1 bedroom + 1 toilet + study | 3 | 840 |
| 2 bedroom + 2 toilet + study | 3 | 1,270 |
| 2 bedroom + 2 toilet + study | 3 | 1,076 |
| 2 bedroom + 2 toilet + study | 3 | 1,023 |
| 2 bedroom + 2 toilet + study | 3 | 1,023 |
| 2 bedroom + 2 toilet + study | 3 | 1,066 |
| 2 bedroom + 2 toilet + study | 3 | 1,292 |
| 2 bedroom + 2 toilet + study | 9 | 1,292 |
| 3 bedroom + 3 toilet + study | 3 | 1,432 |
| 3 bedroom + 3 toilet + study | 3 | 1,453 |
| 3 bedroom + 3 toilet + study | 3 | 1,270 |
| 3 bedroom + 3 toilet + study | 3 | 1,313 |
| 3 bedroom + 3 toilet + study | 3 | 1,615 |
| Coevolve Misty Shores | about 2.5 km | Locked | |
|---|---|---|---|
| Vaswani Starlight | about 2.5 km | Locked | |
| Reflections 66 | about 3 km | Locked | |
| Axis Ekatva | about 3 km | Locked | |
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | about 3.5 km | Locked | |
| Sobha Sentosa Phase 1 Wing 7 | about 3.5 km | Locked | |
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 3.5 km | Locked | |
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 3.5 km | Locked | |
| Sobha Sentosa Phase 4 Wing 1 And 2 | about 3.5 km | Locked | |
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 | about 3.5 km | Locked | |
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58 | about 3.5 km | Locked | |
| Adarsh Parkland | about 3.5 km | Locked |
| The Residences At Brigade Tech Gardens This project | This project is the point the others are measured from | 3 Dec 2022 | – | Not verified yet |
|---|---|---|---|---|
| Coevolve Misty Shores | about 2.5 km | 31 Dec 2029 | 2% (3 of 153) | Locked |
| Vaswani Starlight | about 2.5 km | 31 Dec 2029 | 43% (115 of 269) | Locked |
| Reflections 66 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | 66% Industrial (hi-tech), 34% Residential (main), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 1 km, Thubarahalli | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · Community Hall · Gym | |
|---|---|---|
| Covered parking per unit | 2.41 (176 covered spaces for 73 units) | |
| Power backup | Not declared |
| Completion | Completed, occupancy certificate 3 Dec 2022 |
|---|
| Schedule end | 30 Sep 2022 | |
|---|---|---|
| RERA completion date | 3 Dec 2022 | |
| Work began, as filed | 2 Jan 2018 |
| Building heights, fire NOC | 28.35 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Not provided |
|---|
| Fire safety | GBC(1)512/2015 | |
|---|---|---|
| Environmental clearance | SEIAA 138 CON 2015 · issued 2 Sep 2016 | |
| Engineer's certificate, registration | Dated 9 Jan 2023 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹162.44 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹128.00 Cr |
Sold (28) 38.4%Unsold (45) 61.6%
| Flats sold, at completion | 28 | |
|---|---|---|
| Flats unsold, at completion | 45 | |
| Flats in the phase | 73 |
| Escrow bank | HDFC · World Trade Centre | |
|---|---|---|
| Share of collections the promoter declared for escrow | 70% |
| K-RERA registrations under this promoter | 36 | |
|---|---|---|
| Marked completed | 13 | |
| Past promised date, not completed | 8 | |
| Revoked or withdrawn | 1 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 3 km |
| 31 Dec 2030 |
| 15% (10 of 66) |
| Locked |
| Axis Ekatva | about 3 km | 30 Jun 2029 | 8% (23 of 287) | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | about 3.5 km | 30 Mar 2026 | 100% (237 of 237) | Locked |
|---|
| Sobha Sentosa Phase 1 Wing 7 | about 3.5 km | 30 Jun 2026 | 100% (71 of 71) | Locked |
|---|
| Projects within 4 km, counted | 77 (77 with an approximate location) | |
|---|---|---|
| Flats in them | 23,449 | |
| Booked | 14,902 of 23,449 (64%) | |
| Unsold | 8,547 | |
| Booked a month, pooled | 378 flats | |
| Months to sell, pooled | 20 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, BWSSB, Local authority (Local Authority), Other |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, secondary drain | |
|---|---|---|
| Metro, operational | about 1.5 km, Kundalahalli | |
| Metro, under construction | about 2 km, ISRO |
| Kempegowda Airport | 41 | 26 |
| MG Road (CBD) | 15 | 13 |
| Manyata Tech Park | 17 | 14 |
| ITPL, Whitefield | 7.5 | 3 |
| Ecospace, Bellandur ORR | 7.5 | 6 |
| Electronic City Ph 1 | 21.5 | 14.5 |
| Landfill or waste transfer station | about 1 km | |
|---|---|---|
| Sewage treatment plant | about 0.5 km, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Brigade Tech Gardens Brookefield on OpenStreetMap |