Overview
THE RING RESIDENCY BLOCK-A
GOKUL KRIPA COLONIZERS AND DEVELOPERS PVT. LTD. · Jaipur
Units78
Booked23 of 78As of 2023-03-31
Completion2023-03-31Revised · Proposed 2021-11-02
Registered on2021-11-14
Valid to2023-03-31
Sections
| Property title & search report | |
|---|---|
| Contract & costs | 3 cost heads · 1 quarter |
| Technical report | |
| Site & area | 7 site details · 32 unit types |
| Construction & progress | 3 progress details · 1 quarter |
| Developer & finance | |
| Developer | 4 developer details |
| The evidence | |
| Sources | 48 documents · 7 source links |
Registration
Registration
| Promoter | GOKUL KRIPA COLONIZERS AND DEVELOPERS PVT. LTD. | |
|---|---|---|
| District | Jaipur | |
| Regulator | Rajasthan RERA | |
| Registration number | RAJ/P/2021/1730 | |
| Registered on | 2021-11-14 | |
| Valid to | 2023-03-31 | |
| Project type | Group Housing | |
| Status (as filed) | COMPLETED | |
| Proposed completion | 2021-11-02 | |
| Revised completion | 2023-03-31 |
Contract & costs
What does a buyer commit to?
Contract & costs
Project costs
| Land | ₹1,82,99,364 | |
|---|---|---|
| Construction | ₹0 | |
| Total | ₹11,82,99,364 |
Quarterly money flows
| Quarter | Received | Escrow balance |
|---|---|---|
| 2023-Q1 | ₹0 | ₹0 |
Site & area
What does the land measure?
Site & area
Site & area
| Land area (m²) | 10,182 | |
|---|---|---|
| Built-up (m²) | 1,368.32 | |
| Towers | 78 | |
| Maximum floors | 1 | |
| Units | 78 | |
| Booked | 23 | |
| Booked as of | 2023-03-31 |
Unit types
| E-5 TO E-7 | 33.69 | 3 | 2 | THE RING RESIDENCY BLOCK-A (Villa) |
| L-11 TO L-18 | 50.56 | 8 | 0 | THE RING RESIDENCY BLOCK-A (Villa) |
| M-14 | 86.61 | 1 | 1 | THE RING RESIDENCY BLOCK-A (Villa) |
| M-16 | 84.25 | 1 | 0 | THE RING RESIDENCY BLOCK-A (Villa) |
| M-17 | 83.34 | 1 | 1 | THE RING RESIDENCY BLOCK-A (Villa) |
| E-1 to E-4, E-8 to E-14 (42.70 Sq. Mtr) | 0 | 11 | 0 | THE RING RESIDENCY BLOCK-A (plotted) |
| L-1 (64.05 Sq. Mtr) | 0 | 1 | 1 | THE RING RESIDENCY BLOCK-A (plotted) |
| L-19 (59.50 Sq. Mtr) | 0 | 1 | 0 | THE RING RESIDENCY BLOCK-A (plotted) |
| L-2 (66.92 Sq. Mtr) | 0 | 1 | 0 | THE RING RESIDENCY BLOCK-A (plotted) |
| L-20 (51.80 Sq. Mtr) | 0 | 1 | 0 | THE RING RESIDENCY BLOCK-A (plotted) |
| L-21 (71.01 Sq. Mtr) | 0 | 1 | 0 | THE RING RESIDENCY BLOCK-A (plotted) |
| L-22 (69.52 Sq. Mtr) | 0 | 1 | 0 | THE RING RESIDENCY BLOCK-A (plotted) |
| L-23 (51.80 Sq. Mtr) | 0 | 1 | 1 | THE RING RESIDENCY BLOCK-A (plotted) |
| L-24 (59.50 Sq. Mtr) | 0 | 1 | 1 | THE RING RESIDENCY BLOCK-A (plotted) |
| L-25 (70.35 Sq. Mtr) | 0 | 1 | 0 | THE RING RESIDENCY BLOCK-A (plotted) |
| L-26 (70.45 Sq. Mtr) | 0 | 1 | 1 | THE RING RESIDENCY BLOCK-A (plotted) |
| L-27 (69.42 Sq. Mtr) | 0 | 1 | 1 | THE RING RESIDENCY BLOCK-A (plotted) |
| L-28 (68.41 Sq. Mtr) | 0 | 1 | 0 | THE RING RESIDENCY BLOCK-A (plotted) |
| L-29 (67.32 Sq. Mtr) | 0 | 1 | 1 | THE RING RESIDENCY BLOCK-A (plotted) |
| L-3 to L-10 (63.14 Sq. Mtr) | 0 | 8 | 7 | THE RING RESIDENCY BLOCK-A (plotted) |
| L-30 (65.68 Sq. Mtr) | 0 | 1 | 0 | THE RING RESIDENCY BLOCK-A (plotted) |
| L-31 (63.96 Sq. Mtr) | 0 | 1 | 1 | THE RING RESIDENCY BLOCK-A (plotted) |
| L-32 (62.12 Sq. Mtr) | 0 | 1 | 1 | THE RING RESIDENCY BLOCK-A (plotted) |
| L-33 (60.98 Sq. Mtr) | 0 | 1 | 1 | THE RING RESIDENCY BLOCK-A (plotted) |
| M-1 (111.24 Sq. Mtr) | 0 | 1 | 0 | THE RING RESIDENCY BLOCK-A (plotted) |
| M-13 (79.60 Sq. Mtr) | 0 | 1 | 0 | THE RING RESIDENCY BLOCK-A (plotted) |
| M-15 (94.08 Sq. Mtr) | 0 | 1 | 0 | THE RING RESIDENCY BLOCK-A (plotted) |
| M-2 to M-5 (81.80 Sq. Mtr) | 0 | 5 | 1 | THE RING RESIDENCY BLOCK-A (plotted) |
| M-7 (116.13 Sq. Mtr) | 0 | 1 | 1 | THE RING RESIDENCY BLOCK-A (plotted) |
| M-8 (117.25 Sq. Mtr) | 0 | 1 | 0 | THE RING RESIDENCY BLOCK-A (plotted) |
| M-9 to M-12 (80.58 Sq. Mtr) | 0 | 4 | 0 | THE RING RESIDENCY BLOCK-A (plotted) |
| S-1 to S-14 (9.00 Sq. Mtr) | 0 | 14 | 1 | THE RING RESIDENCY BLOCK-A (plotted) |
Construction & progress
How is it being built, and when will it be ready?
Construction & progress
Progress
| Start | 2021-11-02 | |
|---|---|---|
| Proposed completion | 2021-11-02 | |
| Revised completion | 2023-03-31 |
Quarterly progress
| Quarter | Filed on | Booked |
|---|---|---|
| 2023-Q1 | 2023-04-29 | 23 |
Developer
Can the developer deliver?
Developer
Promoter
| Promoter | GOKUL KRIPA COLONIZERS AND DEVELOPERS PVT. LTD. | |
|---|---|---|
| Type | Company | |
| Escrow bank | ICICI BANK | |
| Other projects in this city pack | 23 |
Sources
Sources
Source URLs & documents
- https://gisprod.rajasthan.gov.in/dynamicquery/rest/services/Rera/Rera/FeatureServer/0/query?objectIds=501%2C502%2C503%2C504%2C505%2C506%2C507%2C508%2C509%2C510%2C511%2C512%2C513%2C514%2C515%2C516%2C517%2C518%2C519%2C520%2C521%2C522%2C523%2C524%2C525%2C526%2C527%2C528%2C529%2C530%2C531%2C532%2C533%2C534%2C535%2C536%2C537%2C538%2C539%2C540%2C541%2C542%2C543%2C544%2C545%2C546%2C547%2C548%2C549%2C550%2C551%2C552%2C553%2C554%2C555%2C556%2C557%2C558%2C559%2C560%2C561%2C562%2C563%2C564%2C565%2C566%2C567%2C568%2C569%2C570%2C571%2C572%2C573%2C574%2C575%2C576%2C577%2C578%2C579%2C580%2C581%2C582%2C583%2C584%2C585%2C586%2C587%2C588%2C589%2C590%2C591%2C592%2C593%2C594%2C595%2C596%2C597%2C598%2C599%2C600%2C601%2C602%2C603%2C604%2C605%2C606%2C607%2C608%2C609%2C610%2C611%2C612%2C613%2C614%2C615%2C616%2C617%2C618%2C619%2C620%2C621%2C622%2C623%2C624%2C625%2C626%2C627%2C628%2C629%2C630%2C631%2C632%2C633%2C634%2C635%2C636%2C637%2C638%2C639%2C640%2C641%2C642%2C643%2C644%2C645%2C646%2C647%2C648%2C649%2C650%2C651%2C652%2C653%2C654%2C655%2C656%2C657%2C658%2C659%2C660%2C661%2C662%2C663%2C664%2C665%2C666%2C667%2C668%2C669%2C670%2C671%2C672%2C673%2C674%2C675%2C676%2C677%2C678%2C679%2C680%2C681%2C682%2C683%2C684%2C685%2C686%2C687%2C688%2C689%2C690%2C691%2C692%2C693%2C694%2C695%2C696%2C697%2C698%2C699%2C700%2C701%2C702%2C703%2C704%2C705%2C706%2C707%2C708%2C709%2C710%2C711%2C712%2C713%2C714%2C715%2C716%2C717%2C718%2C719%2C720%2C721%2C722%2C723%2C724%2C725%2C726%2C727%2C728%2C729%2C730%2C731%2C732%2C733%2C734%2C735%2C736%2C737%2C738%2C739%2C740%2C741%2C742%2C743%2C744%2C745%2C746%2C747%2C748%2C749%2C750&outFields=OBJECTID%2CPROJECT_ID%2CPROJECT_NAME%2CNAME_OF_THE_PROMOTER%2CCATEGORY_NAME%2CPROJECT_SUBTYPE%2CDISTRICT%2CTEHSIL%2CTOTAL_BUILDING_COUNT%2CTOTAL_NO_OF_FLOORS%2CPHASE_AREA%2CCREATED_DATE%2CLAST_EDITED_DATE%2CAPPLICATION_NO%2CREGISTRATION_NO%2CPINCODE&returnGeometry=true&outSR=4326&f=json
- https://rera.rajasthan.gov.in/ProjectDetail?id=s6v9eIgvxGuuUJajLgGC2g
- https://reraapi.rajasthan.gov.in/api/web/Home/GetProjects
- https://reraapi.rajasthan.gov.in/api/web/Home/GetprojectDetailsbyDepecryValue
- https://reraapp.rajasthan.gov.in/HomeWebsite/ProjectDtlsWebsite/s6v9eIgvxGuuUJajLgGC2g
- https://reraapp.rajasthan.gov.in/HomeWebsite/QPRSummaryWebSite?projectIdEnc=s6v9eIgvxGuuUJajLgGC2g%3D%3D&QuarterIdEnc=0dVTidllfdsvgxIT%2FflOsw%3D%3D&PT=1&isUnderProcess=&QPRPId=0
- https://reraapp.rajasthan.gov.in/HomeWebsite/ViewProjectWebsite?id=pyVGbpR%2F%2BUE%3D&type=U
- Registration Certificate
- Advocate Search Report along with Search Fee Receipt · Sign in to download
- Declaration in FORM B(As per RAJ-RERA Rules) · Sign in to download
- Location with Demarcation (Upload KMZ/KML File) · Sign in to download
- Copy Of Approved Site Plan
- Other Approvals as may be required and obtained for the project (if any)
- Project Related Approval Documents (Other than Plotted)
- Url · Sign in to download
- Url · Sign in to download
- Url · Sign in to download
- Url · Sign in to download
- Url · Sign in to download
- Url · Sign in to download
- Url · Sign in to download
- Url · Sign in to download
- Floor Plan (Door, windows, rooms, LB, Kitchen, if any)
- Electrical Drawings (Showing Electrical Legend, Floor Lighting Plan, Floor Power Plan, Single Line Diagram, Fire Alarm Layout, Floor Sound System and CCTV Camera, Equivalency Chart, Lightening Protection Earthing Details, if any)
- Plumbing Drawings (Showing pipelines of W/S, fixtures, tape, W/C, water tank, sewerage line, drainage lines, if any)
- HVAC Drawing (Showing air ducting, ac shafts etc , if any)
- Floor Plan (Door, windows, rooms, LB, Kitchen, if any)
- Electrical Drawings (Showing Electrical Legend, Floor Lighting Plan, Floor Power Plan, Single Line Diagram, Fire Alarm Layout, Floor Sound System and CCTV Camera, Equivalency Chart, Lightening Protection Earthing Details, if any)
- Plumbing Drawings (Showing pipelines of W/S, fixtures, tape, W/C, water tank, sewerage line, drainage lines, if any)
- HVAC Drawing (Showing air ducting, ac shafts etc , if any)
- Floor Plan (Door, windows, rooms, LB, Kitchen, if any)
- Electrical Drawings (Showing Electrical Legend, Floor Lighting Plan, Floor Power Plan, Single Line Diagram, Fire Alarm Layout, Floor Sound System and CCTV Camera, Equivalency Chart, Lightening Protection Earthing Details, if any)
- Plumbing Drawings (Showing pipelines of W/S, fixtures, tape, W/C, water tank, sewerage line, drainage lines, if any)
- HVAC Drawing (Showing air ducting, ac shafts etc , if any)
- Floor Plan (Door, windows, rooms, LB, Kitchen, if any)
- Electrical Drawings (Showing Electrical Legend, Floor Lighting Plan, Floor Power Plan, Single Line Diagram, Fire Alarm Layout, Floor Sound System and CCTV Camera, Equivalency Chart, Lightening Protection Earthing Details, if any)
- Plumbing Drawings (Showing pipelines of W/S, fixtures, tape, W/C, water tank, sewerage line, drainage lines, if any)
- HVAC Drawing (Showing air ducting, ac shafts etc , if any)
- Floor Plan (Door, windows, rooms, LB, Kitchen, if any)
- Electrical Drawings (Showing Electrical Legend, Floor Lighting Plan, Floor Power Plan, Single Line Diagram, Fire Alarm Layout, Floor Sound System and CCTV Camera, Equivalency Chart, Lightening Protection Earthing Details, if any)
- Plumbing Drawings (Showing pipelines of W/S, fixtures, tape, W/C, water tank, sewerage line, drainage lines, if any)
- HVAC Drawing (Showing air ducting, ac shafts etc , if any)
- Url · Sign in to download
- Water Supply
- Rain Water Harvesting/ Recharging
- Sanitation(Storm Water Drainage, Sewerage, STP, Solid Water Disposal etc)
- Electrification(Transformer, Solar Energy etc)
- Others
- RCertificate
- MCAdata · Sign in to download
- Memorandum · Sign in to download
- ArticleAssociation · Sign in to download
- R1_UploadDoc · 2023-03-27 · Sign in to download
- R2_UploadDoc · 2023-03-27 · Sign in to download
- R3_UploadedPath · 2023-03-27 · Sign in to download