Overview
TULSA REVANTA
M/S TULSA SIDHI REALTORS · N.H. 37
Units108
Booked76 of 108
Completion2025-12-31Revised · Proposed 2025-12-31
Registered on2021-08-10
Valid to2025-12-31
Approvals8
Sections
| Property title & search report | |
|---|---|
| Approvals | 8 approvals |
| Disputes & cases | 2 registration details |
| Contract & costs | 3 cost heads · 17 quarters |
| Technical report | |
| Site & area | 3 site details · 108 unit types |
| Construction & progress | 3 progress details · 17 quarters |
| Developer & finance | |
| Developer | 2 developer details |
| The evidence | |
| Sources | 136 documents · 7 source links |
Registration
Registration
| Promoter | M/S TULSA SIDHI REALTORS | |
|---|---|---|
| District | KAMRUP METRO | |
| Locality | N.H. 37 | |
| Regulator | RERA Assam | |
| Registration number | RERAA KM 194 OF 2021 | |
| Registered on | 2021-08-10 | |
| Valid to | 2025-12-31 | |
| Status (as filed) | Registration Expired | |
| Proposed completion | 2025-12-31 | |
| Revised completion | 2025-12-31 |
Approvals
Is it approved for its use?
Approvals
Approvals
| Layout Plan | |||
| Building Plan | |||
| NOC/Building Permit | GUWAHATI MUNICIPAL CORPORATION | 2022-03-17 | 2024-03-17 |
| I. BUILDING PLANNING PERMIT | 2020-11-18 | ||
| II. BUILDING PLANNING PERMIT | 2022-03-17 | ||
| III. FIRM REGISTRATION | 2022-02-10 | ||
| IV. FIRE NOC | 2020-02-21 | ||
| V. FIRE NOC | 2022-02-16 |
Disputes & cases
Are there court cases or buyer complaints on this project?
Disputes & cases
Registration status
| Status | Registration Expired | |
|---|---|---|
| Valid to | 2025-12-31 |
Contract & costs
What does a buyer commit to?
Contract & costs
Project costs
| Land | ₹18,00,00,000 | |
|---|---|---|
| Construction | ₹26,00,00,000 | |
| Total | ₹50,00,00,000 |
Quarterly money flows
| 2021-Q4 | ₹1,01,32,000 | ₹7,48,05,000 | ₹21,82,000 |
| 2022-Q1 | ₹2,12,50,000 | ₹10,73,19,000 | ₹11,32,000 |
| 2022-Q2 | ₹2,23,44,000 | ₹12,91,77,000 | ₹11,26,000 |
| 2022-Q3 | ₹2,73,28,000 | ₹15,09,62,000 | ₹51,54,000 |
| 2022-Q4 | ₹2,33,33,000 | ₹18,31,37,000 | ₹20,87,000 |
| 2023-Q1 | ₹2,18,72,000 | ₹20,81,00,000 | ₹59,000 |
| 2023-Q2 | ₹2,78,49,000 | ₹22,04,77,000 | ₹13,21,000 |
| 2023-Q3 | ₹2,51,19,000 | ₹24,63,62,000 | ₹24,68,000 |
| 2023-Q4 | ₹81,11,000 | ₹26,87,93,000 | ₹11,93,000 |
| 2024-Q1 | ₹77,55,000 | ₹29,00,20,000 | ₹10,92,000 |
| 2024-Q2 | ₹92,01,000 | ₹30,35,38,000 | ₹3,50,000 |
| 2024-Q3 | ₹1,43,21,000 | ₹32,44,82,000 | ₹1,000 |
| 2024-Q4 | ₹1,73,50,000 | ₹34,87,75,000 | ₹37,70,000 |
| 2025-Q1 | ₹2,83,99,000 | ₹30,47,42,000 | ₹51,49,000 |
| 2025-Q2 | ₹1,29,32,000 | ₹32,31,31,000 | ₹14,30,000 |
| 2025-Q3 | ₹1,45,67,000 | ₹33,93,61,000 | ₹10,50,000 |
| 2025-Q4 | ₹82,19,000 | ₹35,08,29,000 | ₹0 |
Site & area
What does the land measure?
Site & area
Site & area
| Land area (m²) | 5,762.93 | |
|---|---|---|
| Units | 108 | |
| Booked | 76 |
Unit types
| APARTMENT/SHOPS/OTHER BUILDINGS Type 1ST FLOOR COMMERCIAL 1A | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 1ST FLOOR COMMERCIAL 1B | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 1ST FLOOR COMMERCIAL 1C | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 1ST FLOOR COMMERCIAL 1D | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 1ST FLOOR COMMERCIAL 1E | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 1ST FLOOR COMMERCIAL 1F | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 1ST FLOOR COMMERCIAL 1G | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 2ND FLOOR COMMERCIAL 2A | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 2ND FLOOR COMMERCIAL 2B | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 2ND FLOOR COMMERCIAL 2C | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 2ND FLOOR COMMERCIAL 2D | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 2ND FLOOR COMMERCIAL 2E | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 2ND FLOOR COMMERCIAL 2F | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 2ND FLOOR COMMERCIAL 2G | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 3RD FLOOR RESIDENTIAL 3 BHK 3A | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 3RD FLOOR RESIDENTIAL 3 BHK 3B | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 3RD FLOOR RESIDENTIAL 3 BHK 3C | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 3RD FLOOR RESIDENTIAL 3 BHK 3D | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 3RD FLOOR RESIDENTIAL 3 BHK 3E | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 3RD FLOOR RESIDENTIAL 2 BHK 3F | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 3RD FLOOR RESIDENTIAL 3 BHK 3G | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 3RD FLOOR RESIDENTIAL 3 BHK 3H | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 3RD FLOOR RESIDENTIAL 2 BHK 3I | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 3RD FLOOR RESIDENTIAL 3 BHK 3J | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 3RD FLOOR RESIDENTIAL 3 BHK 3K | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 3RD FLOOR RESIDENTIAL 2 BHK 3L | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 3RD FLOOR RESIDENTIAL 3 BHK 3M | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 3RD FLOOR RESIDENTIAL 3 BHK 3N | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 4TH FLOOR RESIDENTIAL 3 BHK 4A | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 4TH FLOOR RESIDENTIAL 3 BHK 4B | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 4TH FLOOR RESIDENTIAL 3 BHK 4C | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 4TH FLOOR RESIDENTIAL 3 BHK 4D | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 4TH FLOOR RESIDENTIAL 3 BHK 4E | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 4TH FLOOR RESIDENTIAL 2 BHK 4F | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 4TH FLOOR RESIDENTIAL 3 BHK 4G | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 4TH FLOOR RESIDENTIAL 3 BHK 4H | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 4TH FLOOR RESIDENTIAL 2 BHK 4I | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 4TH FLOOR RESIDENTIAL 3 BHK 4J | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 4TH FLOOR RESIDENTIAL 3 BHK 4K | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 4TH FLOOR RESIDENTIAL 2 BHK 4L | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 4TH FLOOR RESIDENTIAL 3 BHK 4M | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 4TH FLOOR RESIDENTIAL 3 BHK 4N | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 5TH FLOOR RESIDENTIAL 3 BHK 5A | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 5TH FLOOR RESIDENTIAL 3 BHK 5B | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 5TH FLOOR RESIDENTIAL 3 BHK 5C | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 5TH FLOOR RESIDENTIAL 3 BHK 5D | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 5TH FLOOR RESIDENTIAL 3 BHK 5E | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 5TH FLOOR RESIDENTIAL 2 BHK 5F | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 5TH FLOOR RESIDENTIAL 3 BHK 5G | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 5TH FLOOR RESIDENTIAL 3 BHK 5H5TH FLOOR RESIDENTIAL 3 BHK 5H | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 5TH FLOOR RESIDENTIAL 2 BHK 5I | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 5TH FLOOR RESIDENTIAL 3 BHK 5J | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 5TH FLOOR RESIDENTIAL 3 BHK 5K | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 5TH FLOOR RESIDENTIAL 2 BHK 5L | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 5TH FLOOR RESIDENTIAL 3 BHK 5M | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 5TH FLOOR RESIDENTIAL 3 BHK 5N | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 6TH FLOOR RESIDENTIAL 3 BHK 6A | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 6TH FLOOR RESIDENTIAL 3 BHK 6B | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 6TH FLOOR RESIDENTIAL 3 BHK 6C | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 6TH FLOOR RESIDENTIAL 3 BHK 6D | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 6TH FLOOR RESIDENTIAL 3 BHK 6E | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 6TH FLOOR RESIDENTIAL 2 BHK 6F | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 6TH FLOOR RESIDENTIAL 3 BHK 6G | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 6TH FLOOR RESIDENTIAL 3 BHK 6H | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 6TH FLOOR RESIDENTIAL 2 BHK 6I | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 6TH FLOOR RESIDENTIAL 3 BHK 6J | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 6TH FLOOR RESIDENTIAL 3 BHK 6K | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 6TH FLOOR RESIDENTIAL 2 BHK 6L | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 6TH FLOOR RESIDENTIAL 3 BHK 6M | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 6TH FLOOR RESIDENTIAL 3 BHK 6N | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 7TH FLOOR RESIDENTIAL 3 BHK 7A | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 7TH FLOOR RESIDENTIAL 3 BHK 7B | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 7TH FLOOR RESIDENTIAL 3 BHK 7C | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 7TH FLOOR RESIDENTIAL 3 BHK 7D | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 7TH FLOOR RESIDENTIAL 3 BHK 7E | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 7TH FLOOR RESIDENTIAL 2 BHK 7F | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 7TH FLOOR RESIDENTIAL 3 BHK 7G | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 7TH FLOOR RESIDENTIAL 3 BHK 7H | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 7TH FLOOR RESIDENTIAL 2 BHK 7I | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 7TH FLOOR RESIDENTIAL 3 BHK 7J | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 7TH FLOOR RESIDENTIAL 3 BHK 7K | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 7TH FLOOR RESIDENTIAL 2 BHK 7L | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 7TH FLOOR RESIDENTIAL 3 BHK 7M | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 7TH FLOOR RESIDENTIAL 3 BHK 7N | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 8TH FLOOR RESIDENTIAL 3 BHK 8A | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 8TH FLOOR RESIDENTIAL 3 BHK 8B | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 8TH FLOOR RESIDENTIAL 3 BHK 8C | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 8TH FLOOR RESIDENTIAL 3 BHK 8D | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 8TH FLOOR RESIDENTIAL 3 BHK 8E | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 8TH FLOOR RESIDENTIAL 2 BHK 8F | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 8TH FLOOR RESIDENTIAL 3 BHK 8G | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 8TH FLOOR RESIDENTIAL 3 BHK 8H | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 8TH FLOOR RESIDENTIAL 2 BHK 8I | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 8TH FLOOR RESIDENTIAL 3 BHK 8J | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 8TH FLOOR RESIDENTIAL 3 BHK 8K | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 8TH FLOOR RESIDENTIAL 2 BHK 8L | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 8TH FLOOR RESIDENTIAL 3 BHK 8M | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 8TH FLOOR RESIDENTIAL 3 BHK 8N | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 9TH FLOOR RESIDENTIAL PENT HOUSE 9P | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 9TH FLOOR RESIDENTIAL 3 BHK 9Q | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 9TH FLOOR RESIDENTIAL 3 BHK 9R | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 9TH FLOOR RESIDENTIAL PENT HOUSE 9S | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 9TH FLOOR RESIDENTIAL 2 BHK 9T | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 9TH FLOOR RESIDENTIAL PENT HOUSE 9U | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 9TH FLOOR RESIDENTIAL 2 BHK 9V | 1 | 1 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 9TH FLOOR RESIDENTIAL PENT HOUSE 9W | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 9TH FLOOR RESIDENTIAL 3 BHK 9X | 1 | 0 |
| APARTMENT/SHOPS/OTHER BUILDINGS Type 9TH FLOOR RESIDENTIAL 3 BHK 9Y | 1 | 1 |
Construction & progress
How is it being built, and when will it be ready?
Construction & progress
Progress
| Start | 2020-11-18 | |
|---|---|---|
| Proposed completion | 2025-12-31 | |
| Revised completion | 2025-12-31 |
Quarterly progress
| Quarter |
|---|
| 2021-Q4 |
| 2022-Q1 |
| 2022-Q2 |
| 2022-Q3 |
| 2022-Q4 |
| 2023-Q1 |
| 2023-Q2 |
| 2023-Q3 |
| 2023-Q4 |
| 2024-Q1 |
| 2024-Q2 |
| 2024-Q3 |
| 2024-Q4 |
| 2025-Q1 |
| 2025-Q2 |
| 2025-Q3 |
| 2025-Q4 |
Developer
Can the developer deliver?
Developer
Promoter
| Promoter | M/S TULSA SIDHI REALTORS | |
|---|---|---|
| Other projects in this city pack | 1 |
Sources
Sources
Source URLs & documents
- https://rera.assam.gov.in/admincontrol/custom_search
- https://rera.assam.gov.in/admincontrol/registered_projects/1
- https://rera.assam.gov.in/assistancecontrol/project_search_public/1
- https://rera.assam.gov.in/view_project/project_preview_open/1710
- https://rera.assam.gov.in/view_project/quaterly_schedule_preview_open/NzAx
- https://rera.assam.gov.in/view_project/searchprojectDetail/1710
- Registration Certificate
- Occupancy Certificate · Sign in to download
- NO OBJECTION CERTIFICATE FROM THE COMPETENT AUTHORITY · 2025-01-01 · Sign in to download
- PLANNING PERMIT FROM COMPETENT AUTHORITY · 2025-01-01
- APPROVED DRAWING FROM COMPETENT AUTHORITY · 2025-01-01 · Sign in to download
- CARPET AREA AND PARKING AREA DETAILS · 2025-01-01 · Sign in to download
- ENVIRONMENTAL CLEARANCE CERTIFICATE · 2025-01-01
- HEIGHT CLEARANCE FROM AIRPORT AUTHORITY OF INDIA · 2025-01-01
- FIRE NOC · 2025-01-01
- ARCHITECT, STRUCTURAL ENGINEER AND CONTRACTOR DETAILS WITH NAME AND ADDRESS AS THE CASE MAY BE · 2025-01-01 · Sign in to download
- PLAN OF DEVELOPMENT WORKS · 2025-01-01
- COMMENCEMENT CERTIFICATE OF THE PROJECT · 2025-01-01 · Sign in to download
- LOCATIONAL MAP INCLUDING LATITUDE AND LONGITUDE · 2025-01-01 · Sign in to download
- NOC FROM ASSAM POLLUTION CONTROL BOARD · 2025-01-01
- CLEARANCE FROM ASSAM GROUND WATER CONTROL AND REGULATION AUTHORITY · 2025-01-01
- OCCUPANCY CERTIFICATE (IF APPLICABLE) · 2025-01-01 · Sign in to download
- PROJECT COST ESTIMATE · 2025-01-01 · Sign in to download
- PROOF CHECKING OF STRUCTURAL DESIGN / VETTING CERTIFICATE · 2025-01-01 · Sign in to download
- LETTER OF AUTHORIZATION FOR AUTHORIZED SIGNATORY · 2025-01-01 · Sign in to download
- REGISTRATION CERTIFICATE OF THE ENTITY · 2025-01-01
- Other · 2025-01-01 · Sign in to download
- Other · 2025-01-01 · Sign in to download
- BANK MANAGER'S LETTER MENTIONING THAT THE ACCOUNT HAS BEEN OPENED IN COMPLIANCE WITH THE SECTION 4(2)(L)(D) OF REAL ESTATE (REGULATION AND DEVELOPMENT) ACT, 2016 · 2025-01-01 · Sign in to download
- AUDITED BALANCE SHEET OF THE PROMOTER FOR THE IMMEDIATELY PRECEDING THREE (3) FINANCIAL YEARS · 2025-01-01 · Sign in to download
- INCOME TAX RETURN OF THE PROMOTER FOR THE IMMEDIATELY PRECEDING THREE (3) FINANCIAL YEARS · 2025-01-01 · Sign in to download
- PHOTOCOPY OF BANK DRAFT · 2025-01-01 · Sign in to download
- CASHFLOW STATEMENT · 2025-01-01 · Sign in to download
- POWER OF ATTORNEY · 2025-01-01 · Sign in to download
- LATEST NON ENCUMBRANCE CERTIFICATE · 2025-01-01 · Sign in to download
- TRACE MAP SHOWING NEARBY BY STREAMS, PONDS ETC. · 2025-01-01 · Sign in to download
- FORM B, DULY NOTARIZED · 2025-01-01 · Sign in to download
- ZONING PLAN · 2025-01-01
- BUILDING PLAN · 2025-01-01
- SITE PLAN · 2025-01-01
- FLOOR PLANS · 2025-01-01
- APARTMENT PLANS · 2025-01-01
- WATER SUPPLY PLAN · 2025-01-01
- CA CERTIFICATE · 2025-01-01 · Sign in to download
- SECTION ELEVATION · 2025-01-01 · Sign in to download
- STROM WATER DRAINAGE · 2025-01-01 · Sign in to download
- DETAIL OF PERMISSIBLE FAR · 2025-01-01 · Sign in to download
- DETAIL OF COVERED AREA ACHIEVED FAR · 2025-01-01 · Sign in to download
- PARKING PLAN · 2025-01-01
- ROAD PAVEMENT PLAN · 2025-01-01
- ELECTRICAL · 2025-01-01 · Sign in to download
- STP · 2025-01-01 · Sign in to download
- STREET LIGHTING PLAN · 2025-01-01
- PLANTER · 2025-01-01
- BIODEGRABLE STP · 2025-01-01 · Sign in to download
- RAIN WATER HARVESTING DECLEARATION · 2025-01-01 · Sign in to download
- GARBAGE DISPOSAL SYSTEM · 2025-01-01 · Sign in to download
- CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT · 2025-02-10
- CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. · 2025-02-10
- A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. · 2025-02-10
- A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. · 2025-02-10
- SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. · 2025-02-10
- CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT · 2025-02-10
- CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. · 2025-02-10
- A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. · 2025-02-10
- A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. · 2025-02-10
- SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. · 2025-02-10
- CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT · 2025-02-10
- CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. · 2025-02-10
- A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. · 2025-02-10
- A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. · 2025-02-10
- SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. · 2025-02-10
- CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT · 2025-02-10
- CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. · 2025-02-10
- A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. · 2025-02-10
- A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. · 2025-02-10
- SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. · 2025-02-10
- CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT · 2025-02-10
- CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. · 2025-02-10
- A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. · 2025-02-10
- A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. · 2025-02-10
- SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. · 2025-02-10
- CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT · 2025-02-10
- A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. · 2025-02-10
- CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. · 2025-02-10
- A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. · 2025-02-10
- SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. · 2025-02-10
- CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT · 2025-02-10
- CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. · 2025-02-10
- A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. · 2025-02-10
- A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. · 2025-02-10
- SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. · 2025-02-10
- CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT · 2025-02-10
- CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. · 2025-02-10
- A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. · 2025-02-10
- A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. · 2025-02-10
- SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. · 2025-02-10
- CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT · 2025-02-10
- CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. · 2025-02-10
- A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. · 2025-02-10
- A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. · 2025-02-10
- SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. · 2025-02-10
- CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT · 2025-02-10
- CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. · 2025-02-10
- A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. · 2025-02-10
- A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. · 2025-02-10
- SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. · 2025-02-10
- CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT · 2025-02-10
- CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. · 2025-02-10
- A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. · 2025-02-10
- A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. · 2025-02-10
- SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. · 2025-02-10
- CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT · 2025-02-11
- CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. · 2025-02-11
- A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. · 2025-02-11
- A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. · 2025-02-11
- SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. · 2025-02-11
- CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT · 2025-02-11
- CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. · 2025-02-11
- A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. · 2025-02-11
- A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. · 2025-02-11
- SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. · 2025-02-11
- CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT · 2025-04-29
- CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. · 2025-04-29
- A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. · 2025-04-29
- A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. · 2025-04-29
- SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. · 2025-04-29
- CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT · 2025-07-31
- CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. · 2025-07-31
- A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. · 2025-07-31
- A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. · 2025-07-31
- SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. · 2025-07-31
- CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT · 2025-10-27
- CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. · 2025-10-27
- A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. · 2025-10-27
- A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. · 2025-10-27
- SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. · 2025-10-27
- CERTIFICATE OF CHARTERED ACCOUNTANT OF THE PROJECT TO SHOW TOTAL AMOUNT OF MONEY RECEIVED FROM ALLOTTEES AND OTHER SOURCES; MONEY DEPOSITED IN THE ESCROW ACCOUNT; THE MONEY WITHDRAWN FROM THE ESCROW ACCOUNT; AMOUNT OF FUNDS INVESTED ON THE CONSTRUCTION WORK OF THE PROJECT INCLUDING PURCHASE OF MATERIALS. THE CERTIFICATE SHALL ALSO CONTAIN INFORMATION RELATING TO THE QUANTUM OF MONEY WITHDRAWN BY THE PROMOTERS FOR THE PURPOSES OTHER THAN FOR THE PROJECT · 2026-01-31
- CERTIFICATE OF THE REGISTERED ARCHITECT OF THE PROJECT CERTIFYING THE PERCENTAGE OF THE CONSTRUCTION WORK UPTO DATE; THE PERCENTAGE OF CONSTRUCTION WORK UNDERTAKEN DURING THE PREVIOUS QUARTER; AND THE PERCENTAGE OF WORK REMAINING. · 2026-01-31
- A SEPARATE CERTIFICATE BY A CHARTERED ACCOUNTANT CERTIFYING THE TOTAL CUMULATIVE COST INCURRED ON CONSTRUCTION OF THE PROJECT UPTO END OF LAST QUARTER; THE PERCENTAGE OF REMAINING WORK IN TERMS OF COST, AND THE ESTIMATED BALANCE COST TO BE INCURRED FOR COMPLETION OF THE PROJECT. · 2026-01-31
- A CERTIFICATE OF THE REGISTERED ENGINEER CERTIFYING PERCENTAGE OF INFRASTRUCTURE WORK CARRIED OUT. THE INFRASTRUCTURE WORK INCLUDES ROADS, SEWERAGE SYSTEM, STORM WATER DRAINAGE SYSTEM, WATER SUPPLY, AND ELECTRICITY SUPPLY. · 2026-01-31
- SELF CERTIFICATE OF THE PROMOTER TO SHOW THE NUMBER OF PLOTS/APARTMENTS SOLD UPTO THE DATE OF REGISTRATION AND THE PLOTS/APARTMENTS SOLD IN EACH QUARTER THERE-AFTER. · 2026-01-31
- Occupancy certificate · Sign in to download