Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (BDA) | Sanctioned 10 Feb 2016 · No. BDA/TPM/PRL-05-2015-16/4164/2015-16 | |
|---|---|---|
| Power NOC | Filed with the registration | |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹8.73 Cr 54.9%Development · ₹7.17 Cr
Loan & collateral
| Developer's project loan | Private lender (individual) · ₹14.00 Cr disbursed | |
|---|---|---|
| Building plan (BDA) | Sanctioned 10 Feb 2016 | |
| Escrow bank | Karnataka State Co-operative Apex Bank Ltd. · CHANDRA LAYOUT, BANGALORE |
Data room
147 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 2 | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aaradhya GardensRegistered · no quarterly update yet | SAI SAMRUDHI CONSTRUCTIONS | Apartment | 992 sqft carpet (as filed) | Dec 2028 |
| Aashirvad Siddhi PriyaFiled as completed · no completion certificate on record | SEENAPPA P | Plot | ~600–1,240 sqft (estimate: filed carpet plus 25%) | Nov 2024 |
| Aashirvad's Panchamukhi ShreyodhamaCompleted (regulator flag) | RAJESHWARI AASHIRVAD INFRA PROJECTS PRIVATE LIMITED | Plot | ~1,650 sqft (estimate: filed carpet plus 25%) | Completed |
| Aditya OrchardLapsed · completion date passed | Mangala Raghavan | Plot | ~1,200–1,800 sqft (estimate: filed carpet plus 25%) | May 2024 |
| Aprameya Brindavanam EliteCompleted (regulator flag) | Aprameya Properties Pvt Ltd | Plot | – | Completed |
| Ashwasurya Atharva RitewayCompleted (regulator flag) | RITEWAY & KUBERA PROMOTERS | Plot | ~1,200–2,400 sqft (estimate: filed carpet plus 25%) | Completed |
| Axis Banyan CountyCompleted (regulator flag) | R.Harish babu | Plot | – | Completed |
| Birla Apple SpireLapsed · completion date passed | Apple spire India LLP | Apartment | 1,667 sqft carpet (as filed) | Sep 2019 |
8 of 121 other projects in Mysore Road, A to Z. Status is taken from each project's own filing.
All 126 projects in Mysore Road → · S P Puttaswamy's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Vanasiri Badavane in the interactive atlas
Transfer of the land
Title deed executed
Consideration ₹1.54 Cr · Sy 186/2, Kambipura village, Kengeri hobli, Bangalore South taluk · 2 Acres 07 Guntas
Title deed filed with K-RERA, pp. 1, 5, 10 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹2.18 Cr · Sy 186/1, Kambipura village, Kengeri hobli, Bangalore South taluk
Title deed filed with K-RERA, pp. 1, 5, 11 · See it in Documents
Transfer of the land
Sale deed
Survey 186/1, 186/2
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · TAHASILDHAR, BANGALORE SOUTH TALUK · Survey 186/1, 186/2
K-RERA filing, land schedule
Approval or registration
Land use converted
DEPUTY COMMISSIONER, BANGALORE · Survey 186/1, 186/2
K-RERA filing, land schedule
Transfer of the land
Title deed registered
No. KEN-1-08700-2013-14 · Book 1 · executed 27 Nov 2013 · Consideration ₹3.05 Cr · Sy 185/2, Kambipura village, Kengeri hobli, Bangalore South taluk
Title deed filed with K-RERA, pp. 1, 5, 8, 10 · See it in Documents
Transfer of the land
Sale deed
Survey 185/2
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Consideration ₹92.5 L · Sy 187; 187/3, Kambipura village, Kengeri hobli, Bangalore South taluk
Title deed filed with K-RERA, pp. 1, 5, 10 · See it in Documents
Transfer of the land
Sale deed
Survey 187/3
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · TAHASILDHAR, BANGALORE SOUTH TALUK · Survey 185/2
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · TAHASILDHAR, BANGALORE SOUTH TALUK · Survey 187/3
K-RERA filing, land schedule
Approval or registration
Land use converted
DEPUTY COMMISSIONER, BANGALORE · Survey 187/3
K-RERA filing, land schedule
Approval or registration
Land use converted
DEPUTY COMMISSIONER, BANGALORE · Survey 185/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/TPM/PRL-05-2015-16/4164/2015-16
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/060422/004820
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | Private lender (individual) · ₹14.00 Cr disbursed | |
|---|---|---|
| Mortgage on the project land | None declared |
Page 1
Page 1 of 1 of the encumbrance certificate. Filed with K-RERA: EC 185 - 2, 1 page.
| Filed survey numbers matched to the KGIS map | 3 of 3 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 53,637 sq m | |
| Extent the filed land schedule names for these survey numbers | 32,918 sq m | |
| Plot area against the filed extent | 1.63 times | |
| Village, hobli and taluk on the KGIS map | K.G.Kambipura, Kengeri-2 hobli, Bangalore-South taluk | |
| Sy. 185/2: filed extent, KGIS plot | 11,432 sq m, 17,917 sq m | |
| Sy. 187/3: filed extent, KGIS plot | 37 sq m, 14,574 sq m | |
| Mutation entry | None open on 4 of 4 filed surveys |
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 185/2, 186/1, 186/2, 187/3 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 53,637 sq m (the project holds a share) | |
| Khata | A Khatha · TAHASILDHAR, BANGALORE SOUTH TALUK · 11 Feb 2014; A Khatha · TAHASILDHAR, BANGALORE SOUTH TALUK · 21 May 2012; A Khatha · TAHASILDHAR, BANGALORE SOUTH TALUK · 30 May 2014 | |
| Sale deed | Dated 27 Feb 2012, 27 Nov 2013, 22 Jan 2014 | |
| Title deed | Sy 14/6, Kambipura village, Kengeri hobli, Bangalore South taluk · 0-28 Guntas; Sy 187, Kambipura village, Kengeri hobli, Bangalore South taluk |
| Sy. No. 185/2 | 1 | 2 acres 33 guntas | 2 acres 33 guntas | 4 acres 17 guntas | The map differs by 1 acre 24 guntas | 0 | ||
| Sy. No. 186/1 | 1 | 3 acres 3 guntas | 0 | |||||
| Sy. No. 186/2 |
| Fire department |
|---|
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Oct 2022 |
| Land conversion | 4 of 4 parcels converted | |
|---|---|---|
| Sy 185/2 | Converted 16 Dec 2015 · DEPUTY COMMISSIONER, BANGALORE | |
| Sy 186/1, 186/2 | Converted 27 Mar 2013 · DEPUTY COMMISSIONER, BANGALORE | |
| Sy 187/3 | Converted 16 Feb 2015 · DEPUTY COMMISSIONER, BANGALORE | |
| Survey numbers | 185/2 · 186/1 · 186/2 · 187/3 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Rent, 3BHK, 3 km | ₹28,000 /mo · 5 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹24,150 /mo · 5 listings | |
| Rent per sq ft, 3 km | ₹25.9 /mo, as listed · 11 listings with a size |
| Projects within 4 km, counted | 21 (8 with an approximate location) | |
|---|---|---|
| Plots in them | 6,163 | |
| Booked | 2,976 of 6,163 (48%) | |
| Unsold | 3,187 | |
| Booked a month, pooled | 37 plots | |
| Months to sell, pooled | 66 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 400 kV, 340 m from the filed location | Clear |
| Nearest government-flagged flood location | 3.9 km, Kengeri Yellamma temple | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | 2.0 km to the north-east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 570 m to the south-east, an unnamed pond |
| RERA completion date | 31 Oct 2022 | |
|---|---|---|
| Work began, as filed | 1 Apr 2019 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Architect's certificate, registration | Dated 10 Dec 2021 · site inspected 10 Nov 2021 | |
|---|---|---|
| Engineer's certificate, registration | Dated 4 Feb 2022 | |
| Chartered accountant's certificate, registration | Dated 1 Feb 2022 |
| Estimated cost, at registration | ₹15.91 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹7.17 Cr |
| Escrow bank | Karnataka State Co-operative Apex Bank Ltd. · CHANDRA LAYOUT, BANGALORE |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 1 |
| 2 acres 7 guntas |
| 0 |
| Sy. No. 187/3 | 1 | 37 guntas | 0 guntas | 3 acres 24 guntas | Differs: 3 acres 24 guntas apart | 0 |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Borewell, Local authority (Kumbalagodu Gram Panchayath) | |
| Nearest city water main | 3.9 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 2.0 km to the north-east, tertiary drain | |
|---|---|---|
| Ground level | 776 m above sea level, plus or minus 4 m | |
| Metro, operational | 2.5 km, Challaghatta | |
| Metro, under construction | 15.2 km, Kalena Agrahara |
| Kempegowda Airport | 55.0 | 60 | 45.0 |
| MG Road (CBD) | 22.2 | 29 | 19.3 |
| Manyata Tech Park | 32.6 | 39 | 25.9 |
| ITPL, Whitefield | 39.4 | 47 | 32.9 |
| Ecospace, Bellandur ORR | 34.0 | 38 | 25.0 |
| Electronic City Ph 1 | 30.8 | 28 | 24.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.5 km to the north, named STP-6 on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 180 m to the south-west, named Kambipura Substation on OpenStreetMap |