Good ambience and private paush residences
Overview
VDB Cardinal
Overview
VDB Cardinal
Overview
VDB Cardinal
Overview
Photo: FoodizsGood ambience and private paush residences
Excellent High End Boutique Residential apartments
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 1 | |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| 24, Defence ColonyCompleted (regulator flag) | LEWIS INFRASTRUCTURE AND PROJECTS | Apartment | – | Completed |
| Gopalan Admiralty Avenue | Gopalan Enterprises | Apartment | 1,210–2,979 sqft | – |
| Grandus 118Active · 10% built | GRANDUS PROJECTS PRIVATE LIMITED | Apartment | 1,595–2,540 sqft carpet (as filed) | Nov 2028 |
| Mounika Park VestaLapsed · completion date passed | SHRI SAI BALAJI CONSTRUCTIONS | Apartment | – | Dec 2018 |
| Ranka IrisLapsed · completion date passed | DRA DEVELOPERS AND PROJECTS PRIVATE LIMITED | Apartment | 2,030 sqft carpet (as filed) | Apr 2026 |
| Salarpuria Esplanade | Sattva Group | Apartment | 2,887 sqft | – |
| Shreyas SamruddhiCompleted (regulator flag) | M/s.Shreyas Ventures | Apartment | – | Completed |
| White Lotus AnoraLapsed · completion date passed | WHITE LOTUS URBAN HOMES LLP | Apartment | 1,631 sqft carpet (as filed) | Jul 2025 |
8 of 10 other projects in Indiranagar, A to Z. Status is taken from each project's own filing.
All 11 projects in Indiranagar → · Living Walls's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open VDB Cardinal in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Century Regalia (Project 2), price locked.
| Ranka Iris | about 1 km | Locked | |
|---|---|---|---|
| Century Regalia (Project 2) | 2.0 km | Locked | |
| Aydin Infra Signature 3 | 5.0 km | Locked | |
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 5.5 km | Locked | |
| Legacy Saviero | about 6 km | Locked | |
| Vista Svara | about 6 km | Locked | |
| Magnolia Delight | about 7 km | Locked | |
| Vkk Grand | 7.7 km | Locked | |
| Adarsh Parkland | 8.3 km | Locked | |
| Lodha Mirabelle | 8.6 km | Locked | |
| Mirabelle Phase 2 | about 8.5 km | Locked | |
| Assetz Sun & Sanctum - Phase 2 | about 8.5 km | Locked |
| VDB Cardinal This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Ranka Iris | about 1 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Century Regalia (Project 2) | 2.0 km | 28 Feb 2030 | 63% (80 of 128) | Locked |
| Aydin Infra Signature 3 | 5.0 km | 5 Aug 2027 | 50% (6 of 12) | Locked |
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 5.5 km | 30 Dec 2030 | 25% (38 of 150) | Locked |
| Legacy Saviero | about 6 km | 30 Jun 2027 | 45% (43 of 96) | Locked |
| Vista Svara | about 6 km | 30 Oct 2026 | 50% (16 of 32) | Locked |
| Rent, 5+BHK, 3 km | ₹1,49,000 /mo · 5 listings | |
|---|---|---|
| Rent, 4BHK, 3 km | ₹70,000 /mo · 9 listings | |
| Rent, 3BHK, 3 km | ₹65,000 /mo · 141 listings | |
| Rent, 2BHK, 3 km | ₹35,000 /mo · 287 listings | |
| Rent, 1BHK, 3 km | ₹20,000 /mo · 174 listings | |
| Rent per sq ft, 3 km | ₹37.7 /mo, as listed · 225 listings with a size |
| Projects within 4 km, counted | 12 (9 with an approximate location) | |
|---|---|---|
| Flats in them | 1,063 | |
| Booked | 644 of 1,063 (61%) | |
| Unsold | 419 | |
| Booked a month, pooled | 8 flats | |
| Months to sell, pooled | 52 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest government-flagged flood location | 730 m, Thippasandra |
| Nearest storm drain | 40 m to the east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 700 m to the east, an unnamed water body |
| K-RERA registrations under this promoter | 6 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 2 |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Nearest city water main | 510 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 40 m to the east, tertiary drain | |
|---|---|---|
| Ground level | 907 m above sea level, plus or minus 4 m | |
| Metro, operational | 500 m, Indiranagar | |
| Metro, under construction | 3.5 km, M.G. Road |
| Kempegowda Airport | 35.8 | 37 | 26.0 |
| MG Road (CBD) | 6.2 | 8 | 4.2 |
| Manyata Tech Park | 12.1 | 15 | 8.2 |
| ITPL, Whitefield | 13.7 | 15 | 10.5 |
| Ecospace, Bellandur ORR | 14.3 | 19 | 6.9 |
| Electronic City Ph 1 | 20.2 | 24 | 15.5 |
| Landfill or waste transfer station | 400 m to the south | |
|---|---|---|
| Sewage treatment plant | 880 m to the south-west | |
| Quarry | None within 3 km | |
| Crematorium | 1.9 km to the north, named Kalpalli Cemetery Crematorium on OpenStreetMap | |
| Prison | None within 3 km | |
| Electrical substation | 990 m to the north-east |