Overview
VDB Willow Farm
Overview
VDB Willow Farm
Overview
VDB Willow Farm
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Title report dated | 8 Feb 2012 |
|---|
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate.
Approvals
| Environmental clearance | issued 14 Jun 2012 | Clear |
|---|---|---|
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹4.20 Cr 3.2%Development · ₹127.85 Cr
Loan & collateral
| Escrow bank | HDFC · richmond road |
|---|
Data room
54 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | 1 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open VDB Willow Farm in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 28,227 sq m |
|---|
| RERA extensions | Granted · Approved 22 Jun 2022 | |
|---|---|---|
| RERA completion date | 31 Dec 2019 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Map of 8 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Reflections 66, price locked; Poetry Of Earth, price locked; Sobha Windsor Phase 3 Wing 6, 7 And 8, price locked; Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24, price locked; Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58, price locked; SOBHA Ayana, price locked; Sobha Windsor Phase 4 Wing 9, 10 And 11, price locked; Sobha Windsor Phase 2 Wing 3, 4 And 5, price locked.
| Reflections 66 | 1.2 km | Locked | |
|---|---|---|---|
| Coevolve Misty Shores | about 1.5 km | Locked | |
| Vaswani Starlight | about 1.5 km | Locked | |
| Axis Ekatva | about 2 km | Locked | |
| Assetz 66 & Shibui | about 2 km | Locked | |
| Poetry Of Earth | 3.3 km | Locked | |
| Inspira Infinity | about 3.5 km | Locked | |
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | 3.5 km | Locked | |
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | 3.5 km | Locked | |
| Sobha Sentosa Phase 1 Wing 7 | about 3.5 km | Locked | |
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 3.5 km | Locked | |
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 3.5 km | Locked |
| VDB Willow Farm This project | This project is the point the others are measured from | 31 Dec 2019 | – | Not verified yet |
|---|---|---|---|---|
| Reflections 66 | 1.2 km | 31 Dec 2030 | 15% (10 of 66) | Locked |
| Coevolve Misty Shores | about 1.5 km | 31 Dec 2029 | 2% (3 of 153) | Locked |
| Vaswani Starlight | about 1.5 km | 31 Dec 2029 | 43% (115 of 269) | Locked |
| Axis Ekatva | about 2 km | 30 Jun 2029 | 8% (23 of 287) | Locked |
| Assetz 66 & Shibui | about 2 km | 30 Jun 2028 | 75% (77 of 102) | Locked |
| Poetry Of Earth | 3.3 km | 31 Dec 2028 | 25% (77 of 312) | Locked |
| Rent, 4BHK, 3 km | ₹1,10,000 /mo · 9 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹56,750 /mo · 122 listings | |
| Rent, 2BHK, 3 km | ₹36,750 /mo · 174 listings | |
| Rent, 1BHK, 3 km | ₹21,000 /mo · 169 listings | |
| Rent per sq ft, 3 km | ₹35.7 /mo, as listed · 207 listings with a size |
| Projects within 4 km, counted | 84 (43 with an approximate location) | |
|---|---|---|
| Villas in them | 24,687 | |
| Booked | 15,926 of 24,687 (65%) | |
| Unsold | 8,761 | |
| Booked a month, pooled | 352 villas | |
| Months to sell, pooled | 22 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (hi-tech), at the filed pin | |
|---|---|---|
| Nearest government-flagged flood location | 510 m, Nellurahalli |
| Nearest storm drain | 120 m to the north, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 270 m to the west, an unnamed pond |
| Schedule end | 30 Nov 2019 | |
|---|---|---|
| RERA completion date | 31 Dec 2019 | Red flag |
| Work began, as filed | 17 Aug 2012 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Environmental clearance | issued 14 Jun 2012 |
|---|
| Estimated cost, at registration | ₹132.05 Cr |
|---|
| Escrow bank | HDFC · richmond road |
|---|
| K-RERA registrations under this promoter | 6 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 2 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 880 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 120 m to the north, secondary drain | |
|---|---|---|
| Ground level | 883 m above sea level, plus or minus 4 m | |
| Metro, operational | 1.7 km, Nallur Halli | |
| Metro, under construction | 3.7 km, ISRO |
| Kempegowda Airport | 39.3 | 41 | 26.2 |
| MG Road (CBD) | 16.8 | 21 | 14.6 |
| Manyata Tech Park | 19.4 | 26 | 15.3 |
| ITPL, Whitefield | 3.3 | 7 | 2.3 |
| Ecospace, Bellandur ORR | 9.3 | 14 | 7.4 |
| Electronic City Ph 1 | 23.7 | 31 | 15.4 |
| Landfill or waste transfer station | 2.6 km to the west | |
|---|---|---|
| Sewage treatment plant | 1.8 km to the north | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.4 km to the west, named Brigade Tech Gardens Brookefield on OpenStreetMap |