Overview
Venus Gardenia
Overview
Venus Gardenia
Overview
Venus Gardenia
Overview
Title & ownership
Approvals
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 18 Nov 2016 |
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion | Completed, occupancy certificate filed with K-RERA |
|---|
Developer
| Estimated cost, at registration | ₹8.00 Cr |
|---|
Loan & collateral
| Escrow bank | Union Bank of India · Hennur Main Road |
|---|
Data room
42 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Venus Gardenia in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Forfeiture, agreement | 24% of the sale consideration |
|---|
| Late-payment interest | 24% p.a. |
|---|
Map of 6 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Reflections 66, price locked; Sobha Windsor Phase 3 Wing 6, 7 And 8, price locked; Sobha Windsor Phase 4 Wing 9, 10 And 11, price locked; Sobha Windsor Phase 2 Wing 3, 4 And 5, price locked; Poetry Of Earth, price locked; Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24, price locked.
| Reflections 66 | 720 m | Locked | |
|---|---|---|---|
| Assetz 66 & Shibui | about 1 km | Locked | |
| Coevolve Misty Shores | about 2 km | Locked | |
| Axis Ekatva | about 2 km | Locked | |
| Vaswani Starlight | about 2 km | Locked | |
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | 2.3 km | Locked | |
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | 2.7 km | Locked | |
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | 2.7 km | Locked | |
| Inspira Infinity | about 3 km | Locked | |
| Poetry Of Earth | 3.0 km | Locked | |
| Vintage Valley | about 3.5 km | Locked | |
| Adarsh Park Heights Phase-2 | about 4 km | Locked |
| Venus Gardenia This project | This project is the point the others are measured from | 18 Nov 2016 | – | Not verified yet |
|---|---|---|---|---|
| Reflections 66 | 720 m | 31 Dec 2030 | 15% (10 of 66) | Locked |
| Assetz 66 & Shibui | about 1 km | 30 Jun 2028 | 75% (77 of 102) | Locked |
| Coevolve Misty Shores | about 2 km | 31 Dec 2029 | 2% (3 of 153) | Locked |
| Axis Ekatva | about 2 km | 30 Jun 2029 | 8% (23 of 287) | Locked |
| Vaswani Starlight | about 2 km | 31 Dec 2029 | 43% (115 of 269) | Locked |
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | 2.3 km | 30 Sep 2027 | 100% (192 of 192) | Locked |
| Rent, 4BHK, 3 km | ₹1,10,000 /mo · 7 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹53,750 /mo · 72 listings | |
| Rent, 2BHK, 3 km | ₹35,000 /mo · 117 listings | |
| Rent, 1BHK, 3 km | ₹18,500 /mo · 103 listings | |
| Rent per sq ft, 3 km | ₹35.4 /mo, as listed · 147 listings with a size |
| Projects within 4 km, counted | 79 (45 with an approximate location) | |
|---|---|---|
| Flats in them | 22,790 | |
| Booked | 13,613 of 22,790 (60%) | |
| Unsold | 9,177 | |
| Booked a month, pooled | 342 flats | |
| Months to sell, pooled | 22 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (hi-tech), at the filed pin | |
|---|---|---|
| Nearest government-flagged flood location | 510 m, Varthur Columbia Asia hospital |
| Nearest storm drain | 170 m to the south-east, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 240 m to the south-west, an unnamed water body |
| RERA completion date | 18 Nov 2016 | |
|---|---|---|
| Work began, as filed | 19 Nov 2014 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Escrow bank | Union Bank of India · Hennur Main Road |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development | |
| Nearest city water main | 140 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 170 m to the south-east, primary drain | |
|---|---|---|
| Ground level | 874 m above sea level, plus or minus 4 m | |
| Metro, operational | 2.5 km, Kadugodi | |
| Metro, under construction | 5.0 km, Marathahalli |
| Kempegowda Airport | 37.9 | 38 | 26.6 |
| MG Road (CBD) | 18.2 | 22 | 15.8 |
| Manyata Tech Park | 22.4 | 27 | 16.5 |
| ITPL, Whitefield | 4.6 | 6 | 2.8 |
| Ecospace, Bellandur ORR | 10.8 | 15 | 8.3 |
| Electronic City Ph 1 | 24.5 | 30 | 15.7 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.2 km to the north-west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.2 km to the south, named Prestige Tech Forest Substation on OpenStreetMap |