Overview
VIP CITY, SECTOR -04
RAKESH PANDEY · RAIPUR
Units236
Booked194 of 236As of 2026-06-30
Construction progress100%As of 2026-06-30
Completion2027-04-30Revised · Proposed 2023-03-31
Registered on2018-06-26
Approvals3
Cases9
Sections
| Property title & search report | |
|---|---|
| Approvals | 3 approvals |
| Disputes & cases | 9 cases |
| Contract & costs | 2 cost heads · 32 quarters |
| Technical report | |
| Site & area | 3 site details · 236 unit types |
| Construction & progress | 4 progress details · 32 quarters |
| Developer & finance | |
| Developer | 3 developer details |
| The evidence | |
| Sources | 169 documents · 18 source links |
Registration
Registration
| Promoter | RAKESH PANDEY | |
|---|---|---|
| District | RAIPUR | |
| Regulator | CG RERA | |
| Registration number | PCGRERA260618000330 | |
| Registered on | 2018-06-26 | |
| Project type | Plotted Development | |
| Status (as filed) | Ongoing | |
| Proposed completion | 2023-03-31 | |
| Revised completion | 2027-04-30 |
Approvals
Is it approved for its use?
Approvals
Approvals
| Approval |
|---|
| Diversion Order By Completent authority |
| Approval Letter of Town And Country Planning |
| Building Permission from local Authority |
Disputes & cases
Are there court cases or buyer complaints on this project?
Disputes & cases
Cases
| SM-EXA-2026-03706 | CG RERA | Complaint | Disposed | 2026-07-01 |
| SM-EXP-2025-03216 | CG RERA | Complaint | Disposed | 2026-01-12 |
| M-COM-2024-02343 | CG RERA | Complaint | Disposed | 2025-04-21 |
| M-ALL-2024-02476 | CG RERA | Complaint | Disposed | 2025-01-20 |
| M-PRO-2020-01121 | CG RERA | Complaint | Disposed | 2021-03-16 |
| M-PRO-2020-01117 | CG RERA | Complaint | Disposed | 2021-03-16 |
| M-PRO-2020-01109 | CG RERA | Complaint | Disposed | 2021-03-16 |
| M-PRO-2020-01108 | CG RERA | Complaint | Disposed | 2021-03-16 |
| M-COM-2019-00408 | CG RERA | Complaint | Disposed | 2019-11-29 |
Complaints & cases
| Cases | 9 |
|---|
Contract & costs
What does a buyer commit to?
Contract & costs
Project costs
| Land | ₹51,37,000 | |
|---|---|---|
| Construction | ₹28,96,21,000 |
Quarterly money flows
| 2018-Q3 | ₹0 |
| 2018-Q4 | ₹0 |
| 2019-Q1 | ₹0 |
| 2019-Q2 | ₹0 |
| 2019-Q3 | ₹26,056 |
| 2019-Q4 | ₹52,908 |
| 2020-Q1 | ₹1,22,820 |
| 2020-Q2 | ₹1,22,820 |
| 2020-Q3 | ₹1,42,820 |
| 2020-Q4 | ₹1,08,220 |
| 2021-Q1 | ₹28,220 |
| 2021-Q2 | ₹28,220 |
| 2021-Q3 | ₹29,220 |
| 2021-Q4 | ₹89,220 |
| 2022-Q1 | ₹89,220 |
| 2022-Q2 | ₹89,720 |
| 2022-Q3 | ₹89,720 |
| 2022-Q4 | ₹0 |
| 2023-Q1 | ₹0 |
| 2023-Q2 | ₹0 |
| 2023-Q3 | ₹0 |
| 2023-Q4 | ₹0 |
| 2024-Q1 | ₹0 |
| 2024-Q2 | ₹0 |
| 2024-Q3 | ₹0 |
| 2024-Q4 | ₹0 |
| 2025-Q1 | ₹0 |
| 2025-Q2 | ₹10,93,680 |
| 2025-Q3 | ₹3,679 |
| 2025-Q4 | ₹3,680 |
| 2026-Q1 | ₹3,750 |
| 2026-Q2 | ₹3,750 |
Site & area
What does the land measure?
Site & area
Site & area
| Units | 236 | |
|---|---|---|
| Booked | 194 | |
| Booked as of | 2026-06-30 |
Unit types
| D-NBN-1 | 1 | 1 |
| D-NBN-2 | 1 | 1 |
| D-NBN-3 | 1 | 1 |
| D-NBN-4 | 1 | 1 |
| D-NBN-5 | 1 | 1 |
| D-NBN-6 | 1 | 1 |
| D-NBN-7 | 1 | 1 |
| D-NBN-8 | 1 | 1 |
| D-NBN-9 | 1 | 1 |
| D-NBN-10 | 1 | 1 |
| D-NBN-11 | 1 | 1 |
| D-NBN-12 | 1 | 1 |
| D-NBN-13 | 1 | 1 |
| D-NBN-14 | 1 | 1 |
| D-NBN-15 | 1 | 1 |
| D-NBN-16 | 1 | 1 |
| D-NBN-17 | 1 | 1 |
| D-NBN-18 | 1 | 0 |
| D-NBN-19 | 1 | 0 |
| D-NBN-20 | 1 | 1 |
| D-NBN-21 | 1 | 1 |
| D-NBN-22 | 1 | 0 |
| D-NBN-23 | 1 | 1 |
| D-NBN-24 | 1 | 1 |
| D-NBN-25 | 1 | 1 |
| D-NBN-26 | 1 | 1 |
| D-NBN-27 | 1 | 1 |
| D-NBN-28 | 1 | 1 |
| D-NBN-29 | 1 | 1 |
| D-NBN-30 | 1 | 1 |
| D-NBN-31 | 1 | 1 |
| D-NBN-32 | 1 | 0 |
| D-NBN-33 | 1 | 0 |
| D-NBN-34 | 1 | 0 |
| D-NBN-35 | 1 | 0 |
| D-NBN-36 | 1 | 0 |
| D-NBN-37 | 1 | 0 |
| D-NBN-38 | 1 | 1 |
| D-NBN-39 | 1 | 1 |
| D-NBN-40 | 1 | 1 |
| E-NBN-1 | 1 | 1 |
| E-NBN-2 | 1 | 1 |
| E-NBN-3 | 1 | 1 |
| E-NBN-4 | 1 | 1 |
| E-NBN-5 | 1 | 1 |
| E-NBN-6 | 1 | 1 |
| E-NBN-7 | 1 | 1 |
| E-NBN-8 | 1 | 1 |
| E-NBN-9 | 1 | 1 |
| E-NBN-10 | 1 | 1 |
| E-NBN-11 | 1 | 1 |
| E-NBN-12 | 1 | 0 |
| E-NBN-13 | 1 | 0 |
| E-NBN-14 | 1 | 0 |
| E-NBN-15 | 1 | 0 |
| E-NBN-16 | 1 | 0 |
| E-NBN-17 | 1 | 0 |
| E-NBN-18 | 1 | 0 |
| E-NBN-19 | 1 | 1 |
| E-NBN-20 | 1 | 1 |
| E-NBN-21 | 1 | 1 |
| E-NBN-22 | 1 | 1 |
| E-NBN-23 | 1 | 1 |
| E-NBN-24 | 1 | 1 |
| E-NBN-25 | 1 | 0 |
| E-NBN-26 | 1 | 0 |
| E-NBN-27 | 1 | 0 |
| E-NBN-28 | 1 | 0 |
| E-NBN-29 | 1 | 0 |
| E-NBN-30 | 1 | 0 |
| E-NBN-31 | 1 | 0 |
| F-NBN-1 | 1 | 1 |
| F-NBN-2 | 1 | 1 |
| F-NBN-3 | 1 | 1 |
| F-NBN-4 | 1 | 1 |
| F-NBN-5 | 1 | 1 |
| F-NBN-6 | 1 | 1 |
| F-NBN-7 | 1 | 1 |
| F-NBN-8 | 1 | 0 |
| F-NBN-9 | 1 | 0 |
| F-NBN-10 | 1 | 0 |
| F-NBN-11 | 1 | 0 |
| F-NBN-12 | 1 | 0 |
| F-NBN-13 | 1 | 0 |
| F-NBN-14 | 1 | 1 |
| F-NBN-15 | 1 | 1 |
| F-NBN-16 | 1 | 1 |
| F-NBN-17 | 1 | 1 |
| F-NBN-18 | 1 | 1 |
| F-NBN-19 | 1 | 1 |
| F-NBN-20 | 1 | 0 |
| F-NBN-21 | 1 | 0 |
| F-NBN-22 | 1 | 0 |
| F-NBN-23 | 1 | 0 |
| F-NBN-24 | 1 | 0 |
| F-NBN-25 | 1 | 0 |
| G-NBN-1 | 1 | 1 |
| G-NBN-2 | 1 | 1 |
| G-NBN-3 | 1 | 1 |
| G-NBN-4 | 1 | 1 |
| G-NBN-5 | 1 | 1 |
| G-NBN-6 | 1 | 1 |
| G-NBN-7 | 1 | 1 |
| G-NBN-8 | 1 | 1 |
| G-NBN-9 | 1 | 1 |
| G-NBN-10 | 1 | 1 |
| G-NBN-11 | 1 | 1 |
| G-NBN-12 | 1 | 0 |
| G-NBN-13 | 1 | 1 |
| G-NBN-14 | 1 | 0 |
| G-NBN-15 | 1 | 1 |
| G-NBN-16 | 1 | 0 |
| G-NBN-17 | 1 | 1 |
| G-NBN-18 | 1 | 1 |
| G-NBN-19 | 1 | 1 |
| G-NBN-20 | 1 | 1 |
| G-NBN-21 | 1 | 1 |
| G-NBN-22 | 1 | 1 |
| G-NBN-23 | 1 | 0 |
| G-NBN-24 | 1 | 1 |
| G-NBN-25 | 1 | 1 |
| G-NBN-26 | 1 | 0 |
| G-NBN-27 | 1 | 1 |
| G-NBN-28 | 1 | 0 |
| H-NBN-1 | 1 | 1 |
| H-NBN-2 | 1 | 1 |
| H-NBN-3 | 1 | 1 |
| H-NBN-4 | 1 | 1 |
| H-NBN-5 | 1 | 1 |
| H-NBN-6 | 1 | 1 |
| H-NBN-7 | 1 | 0 |
| H-NBN-8 | 1 | 1 |
| H-NBN-9 | 1 | 1 |
| H-NBN-10 | 1 | 1 |
| H-NBN-11 | 1 | 0 |
| H-NBN-12 | 1 | 0 |
| H-NBN-13 | 1 | 0 |
| H-NBN-14 | 1 | 0 |
| H-NBN-15 | 1 | 1 |
| H-NBN-16 | 1 | 1 |
| H-NBN-17 | 1 | 1 |
| H-NBN-18 | 1 | 1 |
| H-NBN-19 | 1 | 1 |
| H-NBN-20 | 1 | 0 |
| H-NBN-21 | 1 | 1 |
| H-NBN-22 | 1 | 0 |
| H-NBN-23 | 1 | 0 |
| H-NBN-24 | 1 | 0 |
| H-NBN-25 | 1 | 0 |
| H-NBN-26 | 1 | 0 |
| A-SBN-1 | 1 | 1 |
| A-SBN-2 | 1 | 1 |
| A-SBN-3 | 1 | 1 |
| A-SBN-4 | 1 | 1 |
| A-SBN-5 | 1 | 0 |
| A-SBN-6 | 1 | 0 |
| A-SBN-7 | 1 | 0 |
| A-SBN-8 | 1 | 1 |
| A-SBN-9 | 1 | 1 |
| A-SBN-10 | 1 | 1 |
| B-SBN-1 | 1 | 0 |
| B-SBN-2 | 1 | 1 |
| B-SBN-3 | 1 | 1 |
| B-SBN-4 | 1 | 1 |
| B-SBN-5 | 1 | 1 |
| B-SBN-6 | 1 | 1 |
| B-SBN-7 | 1 | 1 |
| B-SBN-8 | 1 | 0 |
| B-SBN-9 | 1 | 0 |
| B-SBN-10 | 1 | 1 |
| B-SBN-11 | 1 | 1 |
| B-SBN-12 | 1 | 1 |
| B-SBN-13 | 1 | 1 |
| B-SBN-14 | 1 | 1 |
| C-SBN-1 | 1 | 0 |
| C-SBN-2 | 1 | 0 |
| C-SBN-3 | 1 | 1 |
| C-SBN-4 | 1 | 1 |
| C-SBN-5 | 1 | 1 |
| C-SBN-6 | 1 | 1 |
| C-SBN-7 | 1 | 1 |
| C-SBN-8 | 1 | 1 |
| C-SBN-9 | 1 | 1 |
| C-SBN-10 | 1 | 1 |
| C-SBN-11 | 1 | 1 |
| C-SBN-12 | 1 | 1 |
| C-SBN-13 | 1 | 1 |
| C-SBN-14 | 1 | 1 |
| D-SBN-1 | 1 | 1 |
| D-SBN-2 | 1 | 1 |
| D-SBN-3 | 1 | 1 |
| D-SBN-4 | 1 | 1 |
| D-SBN-5 | 1 | 1 |
| D-SBN-6 | 1 | 0 |
| D-SBN-7 | 1 | 0 |
| D-SBN-8 | 1 | 1 |
| D-SBN-9 | 1 | 1 |
| D-SBN-10 | 1 | 1 |
| D-SBN-11 | 1 | 1 |
| D-SBN-12 | 1 | 1 |
| D-SBN-13 | 1 | 1 |
| D-SBN-14 | 1 | 1 |
| E-SBN-1 | 1 | 1 |
| E-SBN-2 | 1 | 1 |
| E-SBN-3 | 1 | 1 |
| E-SBN-4 | 1 | 1 |
| E-SBN-5 | 1 | 1 |
| E-SBN-6 | 1 | 1 |
| E-SBN-7 | 1 | 1 |
| E-SBN-8 | 1 | 1 |
| E-SBN-9 | 1 | 1 |
| E-SBN-10 | 1 | 1 |
| F-SBN-1 | 1 | 1 |
| F-SBN-2 | 1 | 1 |
| F-SBN-3 | 1 | 1 |
| F-SBN-4 | 1 | 1 |
| F-SBN-5 | 1 | 1 |
| F-SBN-6 | 1 | 1 |
| G-SBN-1 | 1 | 1 |
| G-SBN-2 | 1 | 1 |
| G-SBN-3 | 1 | 1 |
| G-SBN-4 | 1 | 1 |
| G-SBN-5 | 1 | 1 |
| G-SBN-6 | 1 | 1 |
| G-SBN-7 | 1 | 1 |
| G-SBN-8 | 1 | 1 |
| H-SBN-1 | 1 | 1 |
| H-SBN-2 | 1 | 1 |
| H-SBN-3 | 1 | 0 |
| H-SBN-4 | 1 | 0 |
| H-SBN-5 | 1 | 0 |
| H-SBN-6 | 1 | 0 |
| H-SBN-7 | 1 | 1 |
| H-SBN-8 | 1 | 1 |
| H-SBN-8A | 1 | 1 |
| H-SBN-9 | 1 | 1 |
Construction & progress
How is it being built, and when will it be ready?
Construction & progress
Progress
| Progress | 100% | |
|---|---|---|
| As of | 2026-06-30 | |
| Proposed completion | 2023-03-31 | |
| Revised completion | 2027-04-30 |
Quarterly progress
| 2018-Q3 | 89% |
| 2018-Q4 | 89% |
| 2019-Q1 | 89% |
| 2019-Q2 | 0% |
| 2019-Q3 | 89% |
| 2019-Q4 | 89% |
| 2020-Q1 | 89% |
| 2020-Q2 | 89% |
| 2020-Q3 | 89% |
| 2020-Q4 | 89% |
| 2021-Q1 | 92% |
| 2021-Q2 | 92% |
| 2021-Q3 | 92% |
| 2021-Q4 | 92% |
| 2022-Q1 | 92% |
| 2022-Q2 | 92% |
| 2022-Q3 | 92% |
| 2022-Q4 | 94% |
| 2023-Q1 | 95% |
| 2023-Q2 | 95% |
| 2023-Q3 | 96% |
| 2023-Q4 | 96% |
| 2024-Q1 | 97% |
| 2024-Q2 | 98% |
| 2024-Q3 | 98% |
| 2024-Q4 | 99% |
| 2025-Q1 | 99% |
| 2025-Q2 | 99% |
| 2025-Q3 | 99% |
| 2025-Q4 | 99% |
| 2026-Q1 | 99% |
| 2026-Q2 | 100% |
Developer
Can the developer deliver?
Developer
Promoter
| Promoter | RAKESH PANDEY | |
|---|---|---|
| Type | Other | |
| Other projects in this city pack | 8 |
Sources
Sources
Source URLs & documents
- https://rera.cgstate.gov.in/Approved_project_List.aspx
- https://rera.cgstate.gov.in/Approved_project_List_delay_extended.aspx
- https://rera.cgstate.gov.in/ComplaintDocs_final_order_section_all.aspx
- https://rera.cgstate.gov.in/ComplaintDocs_interim_order.aspx
- https://rera.cgstate.gov.in/Promoter_Reg_Only_View_Application_new.aspx?MyID=NDE3
- https://rera.cgstate.gov.in/cause_list.aspx
- Registration Certificate · Sign in to download
- Fee Calculation Sheet · Sign in to download
- Colonizer Registration Certiticate · Sign in to download
- Diversion Order By Completent authority
- Approval Letter of Town And Country Planning
- Sanctioned Layout Plan
- Building Permission from local Authority
- Project Specifications · Sign in to download
- Brief Details of Current Project along with Stilt and Cover Parking Details (ANNEX-11) · Sign in to download
- Development Team Details · Sign in to download
- Development Work Plan
- CA Certificate(For New Project (ANNEXURE-01) and FOR Ongoing Project (ANNEXURE-02))
- Undertaking by the Promoter for pending documents (ANNEX-08) · Sign in to download
- Engineer Certificate
- CA Certificate
- Self Declaration by the Promoter for those documents which are not applicable (ANNEX-07) · Sign in to download
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- Brouchre · Sign in to download
- CA Certificate
- Engg Certificate
- Architect Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- CA Certificate
- Engg Certificate
- Architect Certificate
- Brouchre · Sign in to download
- Brouchre · Sign in to download
- Brouchre · Sign in to download
- Brouchre · Sign in to download
- Brouchre · Sign in to download
- Brouchre · Sign in to download
- Brouchre · Sign in to download
- Brouchre · Sign in to download
- Brouchre · Sign in to download
- Brouchre · Sign in to download
- Brouchre · Sign in to download
- Brouchre · Sign in to download
- Brouchre · Sign in to download
- Brouchre · Sign in to download
- Brouchre · Sign in to download
- Brouchre · Sign in to download
- Brouchre · Sign in to download
- Brouchre · Sign in to download
- Brouchre · Sign in to download
- Final order · 2026-07-01 · Sign in to download
- Final order · 2026-01-12 · Sign in to download
- Final order · 2025-04-21 · Sign in to download
- Final order · 2025-01-20 · Sign in to download
- Final order · 2021-03-16 · Sign in to download
- Final order · 2021-03-16 · Sign in to download
- Final order · 2021-03-16 · Sign in to download
- Final order · 2021-03-16 · Sign in to download
- Final order · 2019-11-29 · Sign in to download
- Interim order · 2025-12-10 · Sign in to download
- Interim order · 2024-05-03 · Sign in to download
- Diversion Order By Completent authority
- Approval Letter of Town And Country Planning
- Building Permission from local Authority
- SM-EXA-2026-03706 · Sign in to download
- SM-EXP-2025-03216 · Sign in to download
- M-COM-2024-02343 · Sign in to download
- M-ALL-2024-02476 · Sign in to download
- M-PRO-2020-01121 · Sign in to download
- M-PRO-2020-01117 · Sign in to download
- M-PRO-2020-01109 · Sign in to download
- M-PRO-2020-01108 · Sign in to download
- M-COM-2019-00408 · Sign in to download