Overview
Overview
Overview
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | 1 | Review |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Builder: Vishwas Bawa Builders
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Not checked. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| Not checked. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Data room
Source: K-RERA project page and the documents filed there, as read by us.
| – |
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
| Area on the KGIS map | Not verified yet | |
|---|---|---|
| Land area of this registration | 2,567 sq m | |
| RERA extensions | Granted · Approved 13 Jun 2022 | |
|---|---|---|
| RERA complaints | 0 | |
| RERA completion date | 10 Dec 2019 |
2BHK 80.2%3BHK 15.1%1BHK 4.7%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 1BHK | 4 | Not filed |
| 2BHK | 69 | Not filed |
| 3BHK | 13 | Not filed |
| Amenities declared | Earth work and other leveling preparation work · Foundation footing work · Retaining wall (All types) · Plinth level Beam · Sub-structure flooring (Parking Floor, more than one floor below general ground level) · RCC or MS Framed structure · Masonry construction: Bricks, Concrete blocks etc · Plastering inside , outside & Ceiling · Joinery: Doors, Windows, Ventilators etc · Basic work of Water supply, Sanitary and Electrification · Dadoing, Skirting, Flooring, Tiles work (All types) · Railing and Grill fixing · Electrification, Water supply and Sanitary Finishing · Fire prevention and fire fighting fitting and fixture with network · Painting · Elevation work · Water Supply · Water conservation · Energy management · Education/Health/Other public amenities · Water Supply · Emergency Evacuation services · Use of renewable energy · Water conservation/rain water harvesting/recharge of ground water · Fire protection and fire safety requirements · Electricity · Gym · Power Backup · Gas · Staircases · Lifts · Staircases and Lift lobbies, corridor,lobbies, corridor · Fire escapes · Common entrance and exit for the building / common portico/foyer/verandah · Basement · Terrace · Outer Wall · Provision for lodging of management staff and security staff · Water conservation and renewable energy | |
|---|---|---|
| Kitchen handover | Not verified yet | |
| Sewage plant | Not verified yet | |
| Power backup | Declared by the promoter | |
| Possession, agreement | Not verified yet | |
|---|---|---|
| Schedule end | Not verified yet | |
| RERA completion date | 10 Dec 2019 | |
| Work began, as filed | 22 Aug 2016 | |
The promoter filed this with the registration.
| Windows | Not verified yet | |
|---|---|---|
| Flooring | Not verified yet | |
| Toilet tiles, spec vs brochure | Not verified yet | |
| Wiring | Not verified yet | |
| Sanctioned load per flat | Not verified yet | |
| Power backup | Provided | |
| Sewage plant | Not verified yet | |
| Estimated cost |
|---|
| ₹17.29 Cr |
| Cost incurred | Not verified yet | |
|---|---|---|
| Cost left | Not verified yet | |
|---|---|---|
| Collected from buyers | Not verified yet | |
|---|---|---|
| Receivable, sold flats | Not verified yet | |
|---|---|---|
| Land cost revision | Not verified yet | |
|---|---|---|
| Escrow bank | Bank of Baroda | |
|---|---|---|
| Designated account, collected | Not verified yet | |
| Designated account, withdrawn | Not verified yet | |
| Unregistered agreements, over 10% paid | Not verified yet | |
| RERA complaints | 0 | |
| Developer's project loan |
|---|
| Not verified yet |
| Records searched to | Not verified yet | |
|---|---|---|
| Building plan | Not verified yet | |
|---|---|---|
| Unregistered agreements, over 10% paid | Not verified yet | |
|---|---|---|
| Sale deed in favour of | Not verified yet | |
|---|---|---|
| Escrow bank | Bank of Baroda |
|---|