Overview
63 Degree East - Tower F
Part of63 Degree East4 phases, 1,124 flats
Overview
63 Degree East - Tower F
Part of63 Degree East4 phases, 1,124 flats
Overview
63 Degree East - Tower F
Part of63 Degree East4 phases, 1,124 flats
Overview
Part of63 Degree East4 phases, 1,124 flats
Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 99 m² 100%
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | HDFC Bank Limited · ₹440.39 Cr disbursed | |
|---|---|---|
| Building plan (BDA) | Sanctioned 8 Dec 2021 | |
| Escrow bank | HDFC · BENGALURU - RICHMOND ROAD |
Data room
145 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | 1 | 2 | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | 1 | – | Review |
| Loan & collateral | – | 1 | – | Review |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 513 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
All 534 projects in Sarjapur Road → · APG Intelli Homes Private Limited's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open 63 Degree East - Tower F in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 8 Dec 2021 · No. BDA/LP/EM/EO-03/TA-2/S/06/2021-22 | |
|---|---|---|
| Fire NOC | KSFES/NOC/226/2021 · issued 4 Dec 2021 | Clear |
| Environmental clearance | SEIAA 60 CON 2017 · issued 17 Apr 2018 | Clear |
| Airport height NOC | NOC ID BANG/SOUTH/B/100617/250712 · issued 20 Oct 2017 · validity ended 19 Oct 2025 | |
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
| RERA extensions | Applied for · Applied 1 Jul 2025 | |
|---|---|---|
| RERA completion date | 31 Jul 2025 |
| Land conversion | 5 of 5 parcels converted | |
|---|---|---|
| Sy 69/1, 69/2, 69/3 | Converted 17 Aug 2012 · Deputy Commissioner | |
| Sy 69/4 | Converted 16 Mar 2016 · Deputy Commissioner | |
| Sy 171 | Converted 15 Jun 2016 · Deputy Commissioner | |
| Survey numbers | 69/1 · 69/2 · 69/3 · 69/4 · 171 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 3BHK | 88 | 1,068 |
| 63 Degree East - Tower E | about 0.5 km | Locked | |
|---|---|---|---|
| Birla Evara | about 1 km | Locked | |
| Mana Jardin Neo | about 1 km | Locked | |
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 1 km | Locked | |
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 1 km | Locked | |
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 1 km | Locked | |
| Haven Phase 2 | about 1.5 km | Locked | |
| Orion Heights | about 1.5 km | Locked | |
| Assetz Muse & Maison | about 2.5 km | Locked | |
| Satori Residence By Genurise | about 2.5 km | Locked | |
| Assetz Ren & Rei | about 2.5 km | Locked | |
| Adarsh Rosewood | about 3.5 km | Locked |
| 63 Degree East - Tower F This project | This project is the point the others are measured from | 31 Jul 2025 | – | Not verified yet |
|---|---|---|---|---|
| 63 Degree East - Tower E | about 0.5 km | 31 Dec 2026 | 100% (399 of 399) | Locked |
| Birla Evara | about 1 km | 25 Dec 2031 | 66% (1,060 of 1,594) | Locked |
| Mana Jardin Neo | about 1 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1.5 km, Doddakannelli |
|---|
| Nearest storm drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.30 (114 covered spaces for 88 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate filed with K-RERA |
|---|
| Schedule end | 31 Jul 2025 | |
|---|---|---|
| RERA completion date | 31 Jul 2025 | |
| Work began, as filed | 1 Feb 2022 |
| Building heights, fire NOC | 44.85 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided |
|---|
| Fire safety | KSFES/NOC/226/2021 · issued 4 Dec 2021 | |
|---|---|---|
| Environmental clearance | SEIAA 60 CON 2017 · issued 17 Apr 2018 | |
| Architect's certificate, registration | Site inspected 18 Dec 2021 | |
| Engineer's certificate, registration | Dated 21 Dec 2021 | |
| Chartered accountant's certificate, registration | Dated 22 Dec 2021 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹56.09 Cr 42.5%Development · ₹75.87 Cr 57.5%
| Estimated cost, at registration | ₹131.96 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹131.96 Cr, same as the filing |
| Escrow bank | HDFC · BENGALURU - RICHMOND ROAD |
|---|
| K-RERA registrations under this promoter | 7 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 4 | Review |
| Other phases under this promoter name | 6 | |
| With a filed extension or completion | 4 (2 completed, 2 extended) | |
| Average schedule slip | 17 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 30 Dec 2032 |
| 27% (22 of 82) |
| Locked |
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 1 km | 30 Jun 2026 | 100% (113 of 113) | Locked |
|---|
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 1 km | 30 Jun 2026 | 100% (151 of 151) | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 1 km | 30 Jun 2026 | 100% (227 of 227) | Locked |
|---|
| Projects within 4 km, counted | 70 (70 with an approximate location) | |
|---|---|---|
| Flats in them | 20,870 | |
| Booked | 12,650 of 20,870 (61%) | |
| Unsold | 8,220 | |
| Booked a month, pooled | 250 flats | |
| Months to sell, pooled | 32 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Local authority (Gram Panchayat Kodathi) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 5.5 km, Electronic City | |
| Metro, under construction | about 5.5 km, Bellandur |
| Kempegowda Airport | 53.5 | 34.5 |
| MG Road (CBD) | 19 | 15 |
| Manyata Tech Park | 26.5 | 20 |
| ITPL, Whitefield | 20.5 | 11.5 |
| Ecospace, Bellandur ORR | 9.5 | 5 |
| Electronic City Ph 1 | 11 | 6 |
| Landfill or waste transfer station | about 2.5 km to the west | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km |