Approvals
| Building plan (BBMP) | Sanctioned 5 Jul 2022 · No. BBMP/AD.COM./MDP/0013/22-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Residential Flats and Commercial Space · avg… 100%
Location & risks
Construction & progress
Developer
Land · ₹2.95 Cr 18.5%Development · ₹13.01 Cr 81.5%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 5 Jul 2022 | |
| Escrow bank | Axis Bank · Whitefield Hope Farm Branch |
Data room
135 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
Be VERY CAREFUL while renting a flat here. 90 days notice, ready to sacrifice at least a month rent from the deposits. Note: you will save some money on the cost of you and your children’s health and your peace.
The building location is extremely poor, as it is right next to a cement storage area. You will constantly have to deal with hazardous cement dust, which can be harmful..especially for kids. The electrical connections in the building are…
This building is in one of the worst possible locations. The houses may look big, but you will deal with dust throughout the entire year because of the constant sand maintenance at the back. The construction quality is terrible—within just…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Adithi EmeraldCompleted · OC 09-12-2021 | M/s ADITHI PROJECTS | Apartment | – | Completed |
| Adithya LujosoCompleted · OC 18-05-2021 | Adithya Constructions | Apartment | 825 sqft carpet (as filed) | Completed |
| Aikya OrchidCompleted · OC 06-05-2024 | AIKYA PROMOTERS AND CONSTRUCTIONS | Apartment | 840–1,049 sqft carpet (as filed) | Completed |
| Bhuvana Boulevard Phase 1Active · 12% built | VSPR DEVELOPERS | Rowhouse | 2,056 sqft carpet (as filed) | Dec 2030 |
| Bhuvana Boulevard Phase 2Active · 10% built | VSPR DEVELOPERS | Rowhouse | 2,056 sqft carpet (as filed) | Dec 2030 |
| Bm PristineLapsed · completion date passed | B M DEVELOPERS | Apartment | – | Jul 2016 |
| Camellia VitalActive · 28% built | Camellia Infrastructures | Apartment | 962 sqft carpet (as filed) | Mar 2028 |
| Campan Valley-2Applied for completion 25/07/2022 | CORNERSTONE PROPERTIES PRIVATE LIMITED | Plot | – | Jan 2022 |
8 of 51 other projects in Varthur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aarna Rajpath in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner Office, Bangalore District · Survey 221/2
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · Bruhat Bangalore Mahanagara Palike · Survey 221/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/AD.COM./MDP/0013/22-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/091122/005435
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Page 1
Page 1 of 8 of the encumbrance certificate. Filed with K-RERA: EC, 8 pages, English.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched part of the survey number | 4,187 sq m | |
| The whole survey number on the KGIS map | 11,066 sq m | |
| Land area filed with K-RERA | 2,064 sq m | |
| Village, hobli and taluk on the KGIS map | Gunjuru, Varturu-1 hobli, Bangalore-East taluk | |
| Mutation entry | None open on 1 of 1 filed surveys |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Survey numbers | 221/2 | |
|---|---|---|
| Land extent, Sy 221/2 | 2,064 sq m | |
| Whole survey numbers on the KGIS map | 11,066 sq m (the project holds a share) | |
| Land area of this registration | 2,064 sq m | |
| Khata | A Khatha · Bruhat Bangalore Mahanagara Palike · 19 Mar 2022 | |
| Sale deed | 21 Mar 1997 | |
| Title deed | Executed 21 Mar 1997 · Consideration ₹4.8 L | |
| Title deed | Sy 221/2 |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Map extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|---|
| Sy. No. 221/2 | 1 | 1 acre 4 guntas | 1 acre 1 gunta | Differs: 3 guntas apart | 0 |
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Apr 2025 |
| Land conversion | Converted 22 Jul 2008 · Deputy Commissioner Office, Bangalore District | |
|---|---|---|
| Survey numbers | 221/2 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Residential Flats and Commercial Space | 33 | 719 |
| Poetry Of Earth | about 0.5 km | Locked | |
|---|---|---|---|
| Inspira Infinity | about 1 km | Locked | |
| Adarsh Park Heights Phase-2 | about 1 km | Locked | |
| Sobha Sentosa Phase 1 Wing 7 | about 2 km | Locked | |
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 2 km | Locked | |
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 2 km | Locked | |
| Sobha Sentosa Phase 4 Wing 1 And 2 | about 2 km | Locked | |
| SOBHA Ayana | about 2 km | Locked | |
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | about 2 km | Locked | |
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 | about 2 km | Locked | |
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58 | about 2 km | Locked | |
| Jeevan's Allure | about 2 km | Locked |
| Aarna Rajpath This project | This project is the point the others are measured from | 30 Apr 2025 | – | Not verified yet |
|---|---|---|---|---|
| Poetry Of Earth | about 0.5 km | 31 Dec 2028 | 25% (77 of 312) | Locked |
| Inspira Infinity | about 1 km | 31 Jan 2029 | 95% (100 of 105) | Locked |
| Adarsh Park Heights Phase-2 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Residential (main), over the filed survey numbers | |
|---|---|---|
| Nearest government-flagged flood location | about 1 km, Varthur police station | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.82 (60 covered spaces for 33 units) | |
| Power backup | Declared by the promoter |
| Schedule end | 15 Dec 2024 | |
|---|---|---|
| RERA completion date | 30 Apr 2025 | Red flag |
| Work began, as filed | 1 May 2022 |
| Building heights, fire NOC | 11.48 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 11.15 sq m |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹15.97 Cr |
|---|
| Escrow bank | Axis Bank · Whitefield Hope Farm Branch |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 1 km |
| 31 May 2027 |
| 95% (471 of 494) |
| Locked |
| Sobha Sentosa Phase 1 Wing 7 | about 2 km | 30 Jun 2026 | 100% (71 of 71) | Locked |
|---|
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 2 km | 31 Dec 2026 | 99% (140 of 142) | Locked |
|---|
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 2 km | 30 Jun 2027 | 99% (176 of 178) | Locked |
|---|
| Projects within 4 km, counted | 89 (89 with an approximate location) | |
|---|---|---|
| Flats in them | 33,608 | |
| Booked | 18,829 of 33,608 (56%) | |
| Unsold | 14,779 | |
| Booked a month, pooled | 543 flats | |
| Months to sell, pooled | 24 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 5.5 km, Nallur Halli | |
| Metro, under construction | about 5 km, Kodibeesanahalli |
| Kempegowda Airport | 42 | 30 |
| MG Road (CBD) | 20.5 | 16 |
| Manyata Tech Park | 24.5 | 18 |
| ITPL, Whitefield | 8.5 | 6 |
| Ecospace, Bellandur ORR | 9.5 | 6.5 |
| Electronic City Ph 1 | 20.5 | 12.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the north-west, named Bellandur Amani 90MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |