Overview
Camellia Vital
Overview
Camellia Vital
Overview
Camellia Vital
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Transfer of the land
Sale deed
Survey [number withheld]
K-RERA filing, land schedule
Approvals
| Building plan (BBMP) | Sanctioned 18 Dec 2025 · No. GBA/BECC/0035/25 - 26 IN | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
2BHK, 3BHK · avg 89 m² 100%
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹12.00 Cr |
|---|
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 18 Dec 2025 | |
| Escrow bank | CITY UNION BANK · KORAMANGALA |
Data room
109 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aarna RajpathLapsed · completion date passed | AARNA PROJECTS | Mixed development | – | Apr 2025 |
| Adithi EmeraldCompleted · OC 09-12-2021 | M/s ADITHI PROJECTS | Apartment | – | Completed |
| Adithya LujosoCompleted · OC 18-05-2021 | Adithya Constructions | Apartment | 825 sqft carpet (as filed) | Completed |
| Aikya OrchidCompleted · OC 06-05-2024 | AIKYA PROMOTERS AND CONSTRUCTIONS | Apartment | 840–1,049 sqft carpet (as filed) | Completed |
| Bhuvana Boulevard Phase 1Active · 12% built | VSPR DEVELOPERS | Rowhouse | 2,056 sqft carpet (as filed) | Dec 2030 |
| Bhuvana Boulevard Phase 2Active · 10% built | VSPR DEVELOPERS | Rowhouse | 2,056 sqft carpet (as filed) | Dec 2030 |
| Bm PristineLapsed · completion date passed | B M DEVELOPERS | Apartment | – | Jul 2016 |
| Campan Valley-2Applied for completion 25/07/2022 | CORNERSTONE PROPERTIES PRIVATE LIMITED | Plot | – | Jan 2022 |
8 of 51 other projects in Varthur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Camellia Vital in the interactive atlas
Approval or registration
Khata issued
A Khatha · BBMP · Survey [number withheld]
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan GBA/BECC/0035/25 - 26 IN
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/300926/008983
K-RERA registration
Transfer of the landApproval or registrationThe parcels join the project
Described in the filing or another document; the original is not read here
| Developer's project loan | None declared |
|---|
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | [number withheld] | |
|---|---|---|
| Land extent, Sy [number withheld] | 1,283 sq m | |
| Land area of this registration | 1,236 sq m | |
| Khata | A Khatha · BBMP · 4 May 2025 | |
| Sale deed | Dated 4 Aug 2021 |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 15 Mar 2028 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | [number withheld] |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK, 3BHK | 24 | 962 |
| Sold, Q2 2026-27 | 0 / 24 | |
|---|---|---|
| Unsold, Q2 2026-27 | 24 |
| Inspira Infinity | about 1 km | Locked | |
|---|---|---|---|
| Poetry Of Earth | about 1.5 km | Locked | |
| Jeevan's Allure | about 2 km | Locked | |
| Reflections 66 | about 2.5 km | Locked | |
| Adarsh Park Heights Phase-2 | about 3 km | Locked | |
| Assetz 66 & Shibui | about 3 km | Locked | |
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 3 km | Locked | |
| Sobha Sentosa Phase 1 Wing 7 | about 3.5 km | Locked | |
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 3.5 km | Locked | |
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 3.5 km | Locked | |
| Sobha Sentosa Phase 4 Wing 1 And 2 | about 3.5 km | Locked | |
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | about 3.5 km | Locked |
| Camellia Vital This project | This project is the point the others are measured from | 15 Mar 2028 | 0% (0 of 24) | Not verified yet |
|---|---|---|---|---|
| Inspira Infinity | about 1 km | 31 Jan 2029 | 95% (100 of 105) | Locked |
| Poetry Of Earth | about 1.5 km | 31 Dec 2028 | 25% (77 of 312) | Locked |
| Jeevan's Allure | about 2 km |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1 km, Varthur police station |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Power Backup, built | 0% | |
| Covered parking per unit | 1.13 (27 covered spaces for 24 units) | |
| Power backup | Declared by the promoter |
| Main structure | 60% · planned by 15 Mar 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 20 Dec 2027 | |
| Completion | 28% |
| Schedule end | 15 Mar 2028 | |
|---|---|---|
| RERA completion date | 15 Mar 2028 | |
| Work began, as filed | 4 Feb 2026 |
| Building heights, fire NOC | 15 m filed |
|---|
| Power backup | Provided |
|---|
| Structural engineer, quarterly | Form 6 · Oct 2026 | Clear |
|---|---|---|
| Architect, quarterly | Form 5 · Oct 2026 |
Unsold (24) 100%
| Sold, Q2 2026-27 | 0 / 24 · 24 available | |
|---|---|---|
| Unsold, Q2 2026-27 | 24 |
| Escrow bank | CITY UNION BANK · KORAMANGALA | |
|---|---|---|
| Designated account, collected | ₹0 in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 31 Jul 2027 |
| 32% (49 of 152) |
| Locked |
| Reflections 66 | about 2.5 km | 31 Dec 2030 | 15% (10 of 66) | Locked |
|---|
| Adarsh Park Heights Phase-2 | about 3 km | 31 May 2027 | 95% (471 of 494) | Locked |
|---|
| Assetz 66 & Shibui | about 3 km | 30 Jun 2028 | 75% (77 of 102) | Locked |
|---|
| Projects within 4 km, counted | 91 (91 with an approximate location) | |
|---|---|---|
| Flats in them | 27,946 | |
| Booked | 15,810 of 27,946 (57%) | |
| Unsold | 12,136 | |
| Booked a month, pooled | 377 flats | |
| Months to sell, pooled | 26 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 4.5 km, Kadugodi | |
| Metro, under construction | about 6 km, Marathahalli |
| Kempegowda Airport | 41 | 28.5 |
| MG Road (CBD) | 19.5 | 17 |
| Manyata Tech Park | 23.5 | 18 |
| ITPL, Whitefield | 7.5 | 5 |
| Ecospace, Bellandur ORR | 12 | 8 |
| Electronic City Ph 1 | 22.5 | 14.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km |