Overview
Aavya Homes
Overview
Aavya Homes
Overview
Aavya Homes
Overview

Title & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 82 m² 65%2BHK · avg 68 m²
Location & risks
Construction & progress

Developer
Land · ₹4.01 Cr 18%Development · ₹18.31 Cr 82%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 3 Mar 2025 | |
| Escrow bank | Union Bank of India · ANANTH NAGAR BRANCH 25701 |
Data room
116 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing Nelaguli-2Lapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 374 sqft carpet (as filed) | Mar 2024 |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 358 sqft carpet (as filed) | Mar 2024 |
| 1 Lakh Multi Storey Bengaluru Housing ProgrammeLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 352 sqft carpet (as filed) | Mar 2024 |
| Abhee Srishti LayoutCompleted (regulator flag) | ABHEE VENTURES PRIVATE LIMITED | Plot | – | Completed |
| Aditri TulipsLapsed · completion date passed | ADITRI PROJECTS LLP | Plot | – | Jan 2020 |
| Bhumika Crystal GardenLapsed · completion date passed | BHUMIKA PROPERTIES | Plot | ~700 sqft (estimate: filed carpet plus 25%) | Feb 2025 |
| Daadys SquareFiled as completed · no completion certificate on record | Daadys Builders Private Limited | Plot | ~600–2,000 sqft (estimate: filed carpet plus 25%) | Sep 2020 |
| Future AsperaCompleted (regulator flag) | Future Infrastructures | Plot | ~900–1,500 sqft (estimate: filed carpet plus 25%) | Completed |
8 of 37 other projects in South Bengaluru, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aavya Homes in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (Anekal Planning Authority) | Sanctioned 3 Mar 2025 · No. APA/CC/04/2018-19 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-128732 · issued 30 Sep 2024 · valid until 25 Sep 2029 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2028 |
| Land conversion | Converted 23 Mar 2016 · DC OFFICE BANGALORE | |
|---|---|---|
| Survey numbers | 138/3 · 138/4 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 28 | 730 |
| 3BHK | 52 | 886 |
| Sold, Q4 2025-26 | 6 / 80 | |
|---|---|---|
| Unsold, Q4 2025-26 | 74 |
| Columbia Aaltius | about 8 km, to a locality centre | Locked | |
|---|---|---|---|
| Aiikya Forestscape | about 9 km | Locked | |
| Shriram 107southeast - Phase 3 | about 9.5 km | Locked | |
| Abhee Serenity Springs | about 10 km | Locked | |
| SOBHA Townpark | about 10 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 10 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 3, W5 | about 10 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 4, W4 | about 10 km | Locked | |
| Sobha Brooklyn Towers - Town Park Phase 5, W3 | about 10 km | Locked | |
| Sobha Hamptons -Townpark Phase 1 W4 To 6 | about 10.5 km | Locked | |
| Sobha Madison Heights-Townpark Phase 1 W5 To 7 | about 10.5 km | Locked | |
| Sobha Madison Heights-Townpark Phase 2 W1 To 4 | about 10.5 km | Locked |
| Aavya Homes This project | This project is the point the others are measured from | 31 Dec 2028 | 8% (6 of 80) | Not verified yet |
|---|---|---|---|---|
| Columbia Aaltius | about 8 km, to a locality centre | 30 Sep 2026 | 54% (89 of 165) | Locked |
| Aiikya Forestscape | about 9 km | 30 Sep 2028 | 34% (121 of 360) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 18.5 km, G K LAYOUT |
|---|
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Amenities declared | Electricity · CCTV Surveillance | |
|---|---|---|
| Electricity, built | 0% | |
| Covered parking per unit | 0.55 (44 covered spaces for 80 units) |
| Main structure | Not started · planned by 31 Dec 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Dec 2027 | |
| Completion | 70% |
| Possession, agreement | 31 Dec 2028 | |
|---|---|---|
| Schedule end | 31 Dec 2028 | |
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 3 Mar 2025 |
| Structure | RCC framed structure | |
|---|---|---|
| Wall thickness | External walls: 6"; Internal walls: 6" & 4" |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles | Anti-skid ceramic tiles (floor) |
| Environmental clearance | Filed with the registration | |
|---|---|---|
| Architect's certificate, registration | Dated 31 Dec 2025 · site inspected 31 Dec 2025 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹22.32 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹18.00 Cr |
Sold (6) 7.5%Unsold (74) 92.5%
| Sold, Q4 2025-26 | 6 / 80 · 74 available | |
|---|---|---|
| Unsold, Q4 2025-26 | 74 |
| Escrow bank | Union Bank of India · ANANTH NAGAR BRANCH 25701 | |
|---|---|---|
| Designated account, collected | ₹63.6 L in Q4 2025-26 | |
| Designated account, withdrawn | ₹11.2 L in Q4 2025-26 (18% of that quarter's deposits) | |
| Share of collections the promoter declared for escrow | 70% |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 9.5 km |
| 7 Jan 2027 |
| 100% (1,055 of 1,055) |
| Locked |
| Abhee Serenity Springs | about 10 km | 30 Jun 2030 | 38% (110 of 288) | Locked |
|---|
| SOBHA Townpark | about 10 km | 30 Jun 2033 | 51% (250 of 492) | Locked |
|---|
| Sobha Brooklyn Towers - Town Park Phase 1, W1 | about 10 km | 31 Dec 2027 | 100% (99 of 99) | Locked |
|---|
| Projects within 4 km, counted | 1 (1 with an approximate location) | |
|---|---|---|
| Flats in them | 126 | |
| Booked | 100 of 126 (79%) | |
| Unsold | 26 | |
| Booked a month, pooled | 5 flats | |
| Months to sell, pooled | 5 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Local authority (CORPORATION) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 12 km, Bommasandra | |
| Metro, under construction | about 21 km, Kalena Agrahara |
| Kempegowda Airport | 68.5 | 54.5 |
| MG Road (CBD) | 38 | 31 |
| Manyata Tech Park | 45 | 38 |
| ITPL, Whitefield | 38 | 31 |
| Ecospace, Bellandur ORR | 29.5 | 24 |
| Electronic City Ph 1 | 16.5 | 14.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |