They took the loan amount in 2023 stopped construction and still work has not started yet… looks like they have no plans to finish it. False promises so far that work will start but nothing has happened yet.
Overview
Aban Dazzle
Overview
Aban Dazzle
Overview
Aban Dazzle
Overview
Photo: Aban DazzleTitle & ownership
Approvals
| Building plan (Local Planning Authority) | Sanctioned 10 Mar 2023 · No. AYP/CC/227/2016-17 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
4BHK · avg 190 m² 100%
Location & risks
Construction & progress
Developer
Land · ₹1.50 Cr 7.8%Development · ₹17.62 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 10 Mar 2023 | |
| Escrow bank | BANK OF INDIA · HSR layout |
Data room
111 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
They took the loan amount in 2023 stopped construction and still work has not started yet… looks like they have no plans to finish it. False promises so far that work will start but nothing has happened yet.
Uday, Where did you met Manoj ?? Let's meet him together.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| “the Sanctuary”Completed (regulator flag) | Classic Ventures LLP | Plot | – | Completed |
| 42 Queens SquareCompleted (regulator flag) | GRS INFRA | Plot | – | Completed |
| 77 EastLapsed · completion date passed | MODERN SPAACES | Apartment | – | Jan 2023 |
| 77 East Phase 2 By Modern Spaaces VenturesLapsed · completion date passed | MODERN SPAACES | Apartment | 1,010 sqft carpet (as filed) | Dec 2022 |
| 302 WestCompleted · OC 30-08-2023 | MODERN SPAACES VENTURES | Apartment | 735–1,398 sqft carpet (as filed) | Completed |
| 312 WestLapsed · completion date passed | MODERN SPAACES CONSTRUCTIONS | Apartment | 604 sqft carpet (as filed) | Apr 2022 |
| Abhee Kings CourtCompleted · OC 26-05-2026 | ABHEE VENTURES PVT LTD | Apartment | 836–1,124 sqft carpet (as filed) | Completed |
| Abhee TranquilaActive · 85% built | Abhee Ventures | Plot | 1,200–1,500 sqft | Dec 2026 |
8 of 191 other projects in Sarjapur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aban Dazzle in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2028 |
| Land conversion | Converted 26 Aug 2013 · DC Office Bengaluru | |
|---|---|---|
| Survey numbers | 40/1 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Houses | Carpet per house, average (sq ft) |
|---|---|---|
| 4BHK | 38 | 2,040 |
| Bilva Phase-II By Bhavisha Homes | about 1 km | Locked | |
|---|---|---|---|
| Nambiar District 25 Phase 2 | about 2 km | Locked | |
| Coevolve Florenza | about 2.5 km | Locked | |
| Suyug's Saffron | about 2.5 km | Locked | |
| Leafy Avenue | about 3 km | Locked | |
| Engrace Vista | about 3 km | Locked | |
| Engrace 3 | about 3 km | Locked | |
| Engrace 4 | about 3 km | Locked | |
| Vasudharini Nest | about 3.5 km | Locked | |
| Sowparnika Olivia Nest | about 4 km | Locked | |
| Royal Nest | about 4 km | Locked | |
| Leafy Delight | about 5 km | Locked |
| Aban Dazzle This project | This project is the point the others are measured from | 31 Dec 2028 | – | Not verified yet |
|---|---|---|---|---|
| Bilva Phase-II By Bhavisha Homes | about 1 km | 30 Apr 2027 | 39% (89 of 226) | Locked |
| Nambiar District 25 Phase 2 | about 2 km | 31 Aug 2030 | 86% (705 of 816) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 6 km, Gunjur | |
|---|---|---|
| Government land in the filed surveys | Not found |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 2.26 (86 covered spaces for 38 units) | |
| Power backup | Not declared |
| Schedule end | 31 Dec 2028 | |
|---|---|---|
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 1 Jun 2023 |
| Building heights, fire NOC | 9.45 m filed, 2 towers |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Not provided |
|---|
| Architect's certificate, registration | Dated 24 May 2023 · site inspected 22 May 2023 | |
|---|---|---|
| Engineer's certificate, registration | Dated 22 May 2023 | |
| Chartered accountant's certificate, registration | Dated 3 Jun 2023 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹19.12 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹17.50 Cr |
| Escrow bank | BANK OF INDIA · HSR layout |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Coevolve Florenza |
|---|
| about 2.5 km |
| 31 Dec 2027 |
| 48% (149 of 309) |
| Locked |
| Suyug's Saffron | about 2.5 km | 31 Dec 2028 | 8% (9 of 110) | Locked |
|---|
| Leafy Avenue | about 3 km | 31 Dec 2028 | 11% (8 of 71) | Locked |
|---|
| Engrace Vista | about 3 km | 30 Dec 2028 | 46% (181 of 392) | Locked |
|---|
| Projects within 4 km, counted | 73 (73 with an approximate location) | |
|---|---|---|
| Houses in them | 23,302 | |
| Booked | 11,666 of 23,302 (50%) | |
| Unsold | 11,636 | |
| Booked a month, pooled | 379 houses | |
| Months to sell, pooled | 26 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Local authority (Yamare Village Panchayat) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 11.5 km, Huskur Road | |
| Metro, under construction | about 11 km, Kodibeesanahalli |
| Kempegowda Airport | 51.5 | 36 |
| MG Road (CBD) | 28.5 | 21.5 |
| Manyata Tech Park | 32.5 | 24.5 |
| ITPL, Whitefield | 18 | 12 |
| Ecospace, Bellandur ORR | 17 | 11.5 |
| Electronic City Ph 1 | 18.5 | 11.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |