Overview
Abhee Kings Court
Overview
Abhee Kings Court
Overview
Abhee Kings Court
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Land use converted
DEPUTY COMMISSIONER · Survey 109/1
K-RERA filing, land schedule
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BMRDA) | Sanctioned 20 Dec 2022 | |
| Escrow bank | STATE BANK OF INDIA · SECTOR 6, 14TH CROSS, HSR LAYOUT |
Data room
142 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| “the Sanctuary”Completed (regulator flag) | Classic Ventures LLP | Plot | – | Completed |
| 42 Queens SquareCompleted (regulator flag) | GRS INFRA | Plot | – | Completed |
| 77 EastLapsed · completion date passed | MODERN SPAACES | Apartment | – | Jan 2023 |
| 77 East Phase 2 By Modern Spaaces VenturesLapsed · completion date passed | MODERN SPAACES | Apartment | 1,010 sqft carpet (as filed) | Dec 2022 |
| 302 WestCompleted · OC 30-08-2023 | MODERN SPAACES VENTURES | Apartment | 735–1,398 sqft carpet (as filed) | Completed |
| 312 WestLapsed · completion date passed | MODERN SPAACES CONSTRUCTIONS | Apartment | 604 sqft carpet (as filed) | Apr 2022 |
| Aban DazzleRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Rowhouse | 2,040 sqft carpet (as filed) | Dec 2028 |
| Abhee TranquilaActive · 85% built | Abhee Ventures | Plot | 1,200–1,500 sqft | Dec 2026 |
8 of 191 other projects in Sarjapur, A to Z. Status is taken from each project's own filing.
All 194 projects in Sarjapur → · Abhee Ventures's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Abhee Kings Court in the interactive atlas
Approval or registration
Khata issued
A Khatha · GRAMA PANCHAYATH · Survey 109/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BMRDA · plan APA/CC/307/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/308/PR/020323/005763
K-RERA registration ·
Approval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Title opinion | Positive title opinion given |
|---|
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 109/1 | |
|---|---|---|
| Land extent, Sy 109/1 | 2A 1 G | |
| Land area of this registration | 7,385 sq m | |
| Khata | A Khatha · GRAMA PANCHAYATH · 12 Sep 2022 |
Valid as of this reportValidity ended
| Building plan (BMRDA) | Sanctioned 20 Dec 2022 · No. APA/CC/307/2022-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | KSFES/NOC/343/2022 · issued 3 Dec 2022 · building height 29.99 m (BLOCK A), 27.6 m (BLOCK B) | Clear |
| SEIAA | Filed with the registration | |
| Airport height NOC | valid until 30 Nov 2030 | Clear |
| Pollution board (CFE) | consent order CTE-333654 · issued 1 Oct 2022 · valid until 30 Sep 2027 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Jun 2026 |
| Land conversion | Converted 7 Apr 2022 · DEPUTY COMMISSIONER | |
|---|---|---|
| Survey numbers | 109/1 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Block a - 3BHK · avg 104 m² 31%Block b - 2.5BHK flats · avg 91 m² 20.7%Block b - 3BHK flats · avg 104 m² 20.7%Block b - 2BHK flats · avg 78 m² 13.8%2 other types 13.8%
| Block a - 2BHK flats | 7 | 5,856 |
| Block a - 2.5BHK | 9 | 8,891 |
| Block a - 3BHK | 36 | 40,451 |
| Block b - 2BHK flats | 16 | 13,380 |
| Block b - 2.5BHK flats | 24 | 23,605 |
| Block b - 3BHK flats | 24 | 26,964 |
| Sold, Q1 2026-27 | 76 / 116 | |
|---|---|---|
| Unsold, Q1 2026-27 | 40 |
| Bilva Phase-II By Bhavisha Homes | about 1.5 km | Locked | |
|---|---|---|---|
| Nambiar District 25 Phase 2 | about 1.5 km | Locked | |
| Coevolve Florenza | about 2.5 km | Locked | |
| Engrace 3 | about 3 km | Locked | |
| Engrace Vista | about 3 km | Locked | |
| Engrace 4 | about 3 km | Locked | |
| Suyug's Saffron | about 3 km | Locked | |
| Leafy Avenue | about 3.5 km | Locked | |
| Vasudharini Nest | about 4 km | Locked | |
| Jeevan's Allure | about 4.5 km | Locked | |
| Sowparnika Olivia Nest | about 5 km | Locked | |
| Royal Nest | about 5 km | Locked |
| Abhee Kings Court This project | This project is the point the others are measured from | 30 Jun 2026 | 66% (76 of 116) | Not verified yet |
|---|---|---|---|---|
| Bilva Phase-II By Bhavisha Homes | about 1.5 km | 30 Apr 2027 | 39% (89 of 226) | Locked |
| Nambiar District 25 Phase 2 | about 1.5 km | 31 Aug 2030 | 86% (705 of 816) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 5 km, Gunjur |
|---|
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 100% | |
| Community Hall, built | 100% | |
| Gym, built | 100% | |
| Water and Sanitation, built | 100% | |
| Covered parking per unit | 1.10 (128 covered spaces for 116 units) | |
| Power backup | Declared by the promoter |
As the promoter reported itPossession date in the agreement
| Main structure | 100% · planned by 15 Jun 2024 | |
|---|---|---|
| Electrical and plumbing finishing | 100% · planned by 1 Mar 2026 | |
| Completion | 100% |
| Possession, agreement | 30 Jun 2026 | |
|---|---|---|
| Schedule end | 30 May 2026 | |
| RERA completion date | 30 Jun 2026 | |
| Work began, as filed | 2 Jan 2023 |
| Building heights, fire NOC | 29.99 m (BLOCK A), 27.6 m (BLOCK B) on the fire NOC · filed: BLOCK A 29.99 m, BLOCK B 27 m |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 19985.71 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026 (3 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/343/2022 · issued 3 Dec 2022 · building height 29.99 m (BLOCK A), 27.6 m (BLOCK B) | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026 (3 filed) | |
| Architect's certificate, registration | Dated 11 Jan 2023 · site inspected 5 Jan 2023 | |
| Chartered accountant's certificate, registration | Dated 16 Jan 2023 | |
| Chartered accountant, Form 4 | Dated 10 Jul 2026 | |
| Architect's quarterly progress certificate dated | 11 Jul 2026 | |
| Architect's site inspection for the quarterly progress certificate | 11 Jul 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹2.54 Cr 4.6%Development · ₹52.65 Cr 95.4%
| Estimated cost, at registration | ₹55.19 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹52.65 Cr | |
| Estimated cost, chartered accountant's certificate | ₹55.19 Cr, same as the filing |
Sold (76) 65.5%Unsold (40) 34.5%
| Sold, Q3 2025-26 | 76 / 116 · 40 available | |
|---|---|---|
| Sold, Q4 2025-26 | 76 / 116 · 40 available | |
| Sold, Q1 2026-27 | 76 / 116 · 40 available | |
| Unsold, Q1 2026-27 | 40 | |
| Sold in Q4 2025-26 | 0 | |
| Sold in Q1 2026-27 | 0 | |
| Flats booked, Form 4 Q1 2026-27 | 76 |
| Escrow bank | STATE BANK OF INDIA · SECTOR 6, 14TH CROSS, HSR LAYOUT | |
|---|---|---|
| Designated account, collected | ₹35.1 L in Q1 2026-27 | |
| Designated account, withdrawn | ₹0 in Q1 2026-27 (0% of that quarter's deposits) | |
| Amount withdrawable, Form 4 | ₹55,10,26,762 | |
| Net amount withdrawable, Form 4 | ₹9,18,13,132 | |
| Escrow account, Q1 2026-27 | Opened at ₹8.4 L | |
| Escrow account, Q4 2025-26 | ₹49.0 L withdrawn | |
| Escrow account to date, Q3 2025-26 | ₹51.28 Cr deposited from sales, ₹37.50 Cr withdrawn, ₹13.23 Cr other withdrawals | |
| Withdrawn from the escrow account to date | ₹46,00,41,412 | |
| Share of collections deposited in escrow | 100% |
| K-RERA registrations under this promoter | 12 | |
|---|---|---|
| Marked completed | 7 | |
| Past promised date, not completed | 2 | |
| Other phases under this promoter name | 7 | |
| With a filed extension or completion | 3 (3 completed, 0 extended) | |
| Average schedule slip | 1 month |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Coevolve Florenza | about 2.5 km | 31 Dec 2027 | 48% (149 of 309) | Locked |
|---|
| Engrace 3 | about 3 km | 1 Jun 2026 | 100% (76 of 76) | Locked |
|---|
| Engrace Vista | about 3 km | 30 Dec 2028 | 46% (181 of 392) | Locked |
|---|
| Engrace 4 | about 3 km | 31 Dec 2026 | 100% (145 of 145) | Locked |
|---|
| Projects within 4 km, counted | 67 (67 with an approximate location) | |
|---|---|---|
| Flats in them | 23,314 | |
| Booked | 12,583 of 23,314 (54%) | |
| Unsold | 10,731 | |
| Booked a month, pooled | 331 flats | |
| Months to sell, pooled | 27 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 11 km, Nallur Halli | |
| Metro, under construction | about 10 km, Kodibeesanahalli |
| Kempegowda Airport | 50 | 35 |
| MG Road (CBD) | 27 | 20.5 |
| Manyata Tech Park | 31 | 23.5 |
| ITPL, Whitefield | 17 | 11.5 |
| Ecospace, Bellandur ORR | 16 | 10.5 |
| Electronic City Ph 1 | 17 | 11 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |