Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (BBMP) | Sanctioned 19 Jan 2022 · No. MDP 64/2021-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
2 BHK Flats · avg 68 m²
Location & risks
Construction & progress
Developer
Land · ₹15.0 L 1.7%
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 19 Jan 2022 | |
| Escrow bank | Axis Bank · PANATHUR |
Data room
125 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 2 | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 513 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Abhi Star Light in the interactive atlas
Approval or registration
Land use converted
Deputy Commissioner Bengaluru · Survey 133/6
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · ARO · Survey 133/6
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BBMP · plan MDP 64/2021-22
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/190722/005081
K-RERA registration ·
Transfer of the landApproval or registrationThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Page 1
Page 1 of 2 of the encumbrance certificate. Filed with K-RERA: EC till date, 2 pages, English.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 24,696 sq m | |
| Land area filed with K-RERA | 1,531 sq m | |
| Village, hobli and taluk on the KGIS map | Gunjuru, VARTURU1 hobli, BANGALORE-EAST taluk | |
| Mutation entry | None open on 1 of 1 filed surveys |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 133/6 | |
|---|---|---|
| Land extent, Sy 133/6 | 0.18.8 Guntas | |
| Whole survey numbers on the KGIS map | 24,696 sq m (the project holds a share) | |
| Land area of this registration | 1,531 sq m | |
| Khata | A Khatha · ARO · 1 Dec 2020 |
| Survey | Owners as on the RTC, read date / relation / share | Owners on the RTC | RTC extent | Filed extent | Map extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|---|---|
| Sy. No. 133/6 | 1 | 19 guntas | 6 acres 4 guntas | Differs: 5 acres 26 guntas apart | 0 |
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 31 Jan 2022 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 28 Feb 2025 |
| Land conversion | Converted 7 Mar 2020 · Deputy Commissioner Bengaluru | |
|---|---|---|
| Survey numbers | 133/6 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2 BHK Flats | 24 | 733 |
| 3 BHK Flats | 10 | 1,507 |
Map of 6 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: SOBHA Ayana, price locked; Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24, price locked; Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58, price locked; Poetry Of Earth, price locked; SOBHA Neopolis, price locked; Adarsh Parkland, price locked.
| Adarsh Park Heights Phase-2 | about 0.5 km | Locked | |
|---|---|---|---|
| SOBHA Ayana | 480 m | Locked | |
| Sobha Sentosa Phase 1 Wing 7 | about 0.5 km | Locked | |
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 0.5 km | Locked |
| Abhi Star Light This project | This project is the point the others are measured from | 28 Feb 2025 | – | Not verified yet |
|---|---|---|---|---|
| Adarsh Park Heights Phase-2 | about 0.5 km | 31 May 2027 | 95% (471 of 494) | Locked |
| SOBHA Ayana | 480 m | 31 Dec 2031 | 62% (426 of 683) | Locked |
| Sobha Sentosa Phase 1 Wing 7 |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main), at the filed pin | Clear |
|---|---|---|
| Nearest high-tension line | Nearest high-tension line: 66 kV, 250 m from the filed location | Clear |
| Nearest government-flagged flood location | 1.1 km, Balagere | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | 100 m to the south-east, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 390 m to the south, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 20.71 (704 covered spaces for 34 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 24 Jul 2024 |
|---|
| Schedule end | 28 Feb 2025 | |
|---|---|---|
| RERA completion date | 28 Feb 2025 | |
| Work began, as filed | 19 Jan 2022 |
| Wall thickness | External walls: 200 mm; Internal walls: 100 mm & 150 mm | |
|---|---|---|
| Building heights, fire NOC | 11.48 m filed |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | 100% power backup for common areas |
|---|
| Architect's certificate, registration | Dated 19 Mar 2022 · site inspected 10 Mar 2022 | |
|---|---|---|
| Engineer's certificate, registration | Dated 19 Mar 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹8.65 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹8.50 Cr |
Sold (34) 100%
| Flats sold, at completion | 34 | |
|---|---|---|
| Flats unsold, at completion | 0 | |
| Flats in the phase | 34 |
| Escrow bank | Axis Bank · PANATHUR |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 0.5 km | Locked |
|---|
| Sobha Sentosa Phase 4 Wing 1 And 2 | about 0.5 km | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 22 Wing 23 And 24 | 690 m | Locked |
|---|
| Sobha Dream Acres - Tropical Greens Phase 21 Wing 21 And 22 | about 0.5 km | Locked |
|---|
| Sobha Dream Acres - Oasis Phase 27 Wing 55, 56, 57 And 58 | 720 m | Locked |
|---|
| Poetry Of Earth | 1.6 km | Locked |
|---|
| SOBHA Neopolis | 1.6 km | Locked |
|---|
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 1.5 km | Locked |
|---|
| about 0.5 km |
| 30 Jun 2026 |
| 100% (71 of 71) |
| Locked |
| Sobha Sentosa Phase 2 Wing 5 And 6 | about 0.5 km | 31 Dec 2026 | 99% (140 of 142) | Locked |
|---|
| Sobha Sentosa Phase 3 Wing 3 And 4 | about 0.5 km | 30 Jun 2027 | 99% (176 of 178) | Locked |
|---|
| Sobha Sentosa Phase 4 Wing 1 And 2 | about 0.5 km | 31 Dec 2027 | 100% (142 of 142) | Locked |
|---|
| Rent, 4BHK, 3 km | ₹1,20,000 /mo · 5 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹53,000 /mo · 65 listings | |
| Rent, 2BHK, 3 km | ₹40,000 /mo · 145 listings | |
| Rent, 1BHK, 3 km | ₹18,250 /mo · 86 listings | |
| Rent per sq ft, 3 km | ₹35.7 /mo, as listed · 154 listings with a size |
| Projects within 4 km, counted | 85 (36 with an approximate location) | |
|---|---|---|
| Flats in them | 32,026 | |
| Booked | 18,284 of 32,026 (57%) | |
| Unsold | 13,742 | |
| Booked a month, pooled | 501 flats | |
| Months to sell, pooled | 24 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | 2.5 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 100 m to the south-east, secondary drain | |
|---|---|---|
| Ground level | 876 m above sea level, plus or minus 4 m | |
| Metro, operational | 5.1 km, Nallur Halli | |
| Metro, under construction | 3.7 km, Kodibeesanahalli |
| Kempegowda Airport | 43.9 | 44 | 29.9 |
| MG Road (CBD) | 19.1 | 24 | 14.7 |
| Manyata Tech Park | 23.2 | 29 | 17.3 |
| ITPL, Whitefield | 10.6 | 12 | 6.2 |
| Ecospace, Bellandur ORR | 7.9 | 13 | 5.3 |
| Electronic City Ph 1 | 19.9 | 27 | 11.6 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 1.5 km to the north-west, named Bellandur Amani 90MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 400 m to the north-east |