Not verified yet: Recent price, super built-up; Gross yield; East Bengaluru, past year; Price paid per sq ft, super built-up.
65/1A1, 65/1B
Project Both surveys together
2008
2 Apr 2008 Project Transfer of the land
Title deed executed
Consideration ₹98.9 L · Sy 65/1A, Chikkanayakanahalli village, Varthur hobli
Title deed filed with K-RERA, pp. 1, 7, 13 · See it in Documents
15 Oct 2008 Survey 65 Covers 65/1B only
Approval or registration
Land use converted
Special/Deputy Commissioner · Survey 65/1B
K-RERA filing, land schedule
2011
8 Apr 2011 Survey 65 Covers 65/1A1 only
Approval or registration
Land use converted
Special/Deputy Commissioner · Survey 65/1A1
K-RERA filing, land schedule
12 Aug 2011 Survey 65 Covers 65/1A1 only
Transfer of the land
Title deed executed
No. VRT-1-04428-2011-12 · Book 1 · Consideration ₹1.08 Cr · Sy 65/1A1; 65/1A, Chikkanayakanahalli village, Varthur hobli
Title deed filed with K-RERA, pp. 1, 6, 13, 45 · See it in Documents
12 Aug 2011 Survey 65 Covers 65/1A1 only
Transfer of the land
Sale deed
in favour of M/s. Orchids Apartments Private Limited · Survey 65/1A1
K-RERA filing, land schedule
14 Sep 2011 Survey 65 Covers 65/1B only
Transfer of the land
Title deed registered
No. VRT-1-05147-2011-12 · Book 1 · executed 14 Sep 2011 · Consideration ₹82.1 L · Sy 65/B
Title deed filed with K-RERA, pp. 1, 6, 7, 15 · See it in Documents
14 Sep 2011 Survey 65 Covers 65/1B only
Transfer of the land
Sale deed
in favour of M/s. Orchids Apartments Private Limited · Survey 65/1B
K-RERA filing, land schedule
2013 22 Feb 2013 Survey 64 Approval or registration
Land use converted
Special/Deputy Commissioner · Survey 64/4, 64/5
K-RERA filing, land schedule
28 Mar 2013 Survey 64 Transfer of the land
Title deed registered
No. INR-1-07475-2012-13 · Book 1 · Consideration ₹1.90 Cr · Sy 64/5; 64/2, Chikkanayakanahalli village, Varthur hobli; Sy 64/4; 64/2, Chikkanayakanahalli village, Varthur hobli
Title deed filed with K-RERA, pp. 6, 11, 21 · See it in Documents
28 Mar 2013 Survey 64 Transfer of the land
Sale deed
in favour of M/s. Orchids Apartments Private Limited · Survey 64/4, 64/5
K-RERA filing, land schedule
2019 8 Jan 2019 Survey 64 Approval or registration
Khata issued
E Khatha · Halanayakanahalli, Village Panchayath Of · Survey 64/4, 65/1A1, 65/1B, 64/5
K-RERA filing, land schedule
8 Jan 2019 Survey 65 Approval or registration
Khata issued
E Khatha · Halanayakanahalli, Village Panchayath Of · Survey 64/4, 65/1A1, 65/1B, 64/5
K-RERA filing, land schedule
2021
30 Sep 2021 Project Approval or registration
Building plan sanctioned
BDA · plan BDA/NM/A.S/A.A-1/T.S-4/E-14/21-22
K-RERA filing, approvals
2022
13 May 2022 Project Title check
Records searched up to this date
Encumbrance certificate, p. 10 · See it in Documents
11 Oct 2022 Project Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/111022/005309
K-RERA registration · Open on the regulator's site
Transfer of the land Approval or registration Title check The parcels join the project
Read from the original document Described in the filing or another document; the original is not read here
Boundaries Schedule in the EC vs KGIS neighbours The matched land is part of a survey number. KGIS holds only the whole number, so its neighbours are not this land's.
Survey sketch Survey sketch filed with K-RERA No survey sketch is listed on this phase's K-RERA filing
Sketch, sanction and mutation vs KGIS map Land record The RTC of each filed survey Not verified yet: Title opinion; Charges on the land; Landowner share of sales; Court-case search; High Court order; Encumbrance certificate, Form 15; Sketch dimensions; Sanctioned plan area; Share of sales revenue; Joint development agreement.
2025 Airport height validity ended 22 Aug 2026 Airport height: validity ended 22 Aug 2026 As of 18 Nov 2026 2019 2021 2023 2025 2027 Airport height validity ended 22 Aug 2026 Airport height: validity ended 22 Aug 2026 As of 18 Nov 2026
2019 2021 2023 2025 2027 Airport height validity ended 22 Aug 2026 Airport height: validity ended 22 Aug 2026 As of 18 Nov 2026
2019 2021 2023 2025 2027 Airport height validity ended 22 Aug 2026 Airport height: validity ended 22 Aug 2026 As of 18 Nov 2026
Valid as of this report Validity ended
RERA Registration certificates Registration certificate PRM/KA/RERA/1251/446/PR/111022/005309
•••••
Unlock this full report ₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what Adarsh Tropica (Phase-1)'s developer filed before you say yes.
× Adarsh Tropica (Phase-1)
ORCHIDS APARTMENTS PVT LTD · Choodasandra/Hosa Road, off Sarjapur Road
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
•• %
Payments Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report ₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what Adarsh Tropica (Phase-1)'s developer filed before you say yes.
× Adarsh Tropica (Phase-1)
ORCHIDS APARTMENTS PVT LTD · Choodasandra/Hosa Road, off Sarjapur Road
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
The area Comparable projects Nearest 12 with filed prices Nearest projects This project vs the nearest with filed prices Rent & yield Median rent, 3 km 1BHK · 66 listings 1BHK: median ₹20,500 /mo over 66 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹20,500 /mo 2BHK · 186 listings 2BHK: median ₹39,500 /mo over 186 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹39,500 /mo 3BHK · 105 listings 3BHK: median ₹60,000 /mo over 105 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹60,000 /mo 4BHK · 9 listings 4BHK: median ₹96,000 /mo over 9 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹96,000 /mo
1BHK · 66 listings 1BHK: median ₹20,500 /mo over 66 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹20,500 /mo 2BHK · 186 listings
Unsold stock nearby Months to sell unsold stock Within 4 km, pooled 9,321 unsold flats ÷ 277 booked a month across 75 projects 34 months Adarsh Tropica (Phase-2) Adarsh Tropica (Phase-2), about 0.5 km: 254 unsold ÷ 229 booked in 9 months 10 months Msr Passion Square Msr Passion Square, about 0.5 km: 107 unsold ÷ 11 booked in 9 months 88 months Mana Cresta Mana Cresta, 520 m: 77 unsold ÷ 19 booked in 9 months 37 months Haven Phase 2 Haven Phase 2, about 0.5 km: 132 unsold ÷ 10 booked in 6 months 79 months Assetz Beyond Ordinary Assetz Beyond Ordinary, 630 m: 162 unsold ÷ 42 booked in 9 months 35 months Synergy
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; East Bengaluru, past year; Bengaluru, past year; East Bengaluru since 2022; This project vs East Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Bengaluru median yield.
Around it Water Groundwater, Bengaluru East taluk average 0 m 10 m 20 m 30 m 40+ m 10 to 20 20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground 0 m 10 m 20 m 30 m 40+ m 5 to 10 10 to 20
Not verified yet: Nearest high-tension line, Kitchen handover, Sewage plant.
50% 100% Q3 2025-26: 97% 97% Q3 2025-26 Q4 2025-26: 97% 97% Q4 2025-26 Q1 2026-27: 98% 98% Q1 2026-27 Q2 2026-27: 98% 98% Q2 2026-27 0% 50% 100% Q3 2025-26: 97% 97% Q3 2025-26 Q4 2025-26: 97% 97% Q4 2025-26 Q1 2026-27: 98% 98% Q1 2026-27 Q2 2026-27: 98% 98% Q2 2026-27 0% 50% 100% Q3 2025-26: 97% 97% Q3 2025-26 Q4 2025-26: 97% 97% Q4 2025-26 Q1 2026-27: 98% 98% Q1 2026-27 Q2 2026-27: 98% 98% Q2 2026-27 0% 50% 100% Q3 2025-26: 97% 97% Q3 2025-26 Q4 2025-26: 97% 97% Q4 2025-26 Q1 2026-27: 98% 98% Q1 2026-27 Q2 2026-27: 98% 98% Q2 2026-27 As the promoter reported it
Work left By component, Q2 2026-27 Block 1 Block 1: 93% 93% Block 2 Block 2: 93% 93% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Upto Plinth Level Upto Plinth Level: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 100% 100% Basic work of Water supply, Sanitary and Electrification Basic work of Water supply, Sanitary and Electrification: 90% 90% Railing and Grill fixing Railing and Grill fixing: 95% 95% Electrification, Water supply and Sanitary Finishing Electrification, Water supply and Sanitary Finishing: 80% 80% Fire prevention and fire fighting fitting and fixture with network Fire prevention and fire fighting fitting and fixture with network: 75% 75% Club House Club House: 30% 30% Gym Gym: 10% 10% Water Supply, external Water Supply, external: 70% 70% Sewage and Drainage System Sewage and Drainage System: 70% 70% Solid waste management and disposal Solid waste management and disposal: 60% 60% Storm water drains Storm water drains: 70% 70% Fire protection and fire safety requirements, external Fire protection and fire safety requirements, external: 50% 50% Parks & Tree planting Parks & Tree planting: 30% 30% Water Supply, internal Water Supply, internal: 70% 70% Water conservation/rain water harvesting/recharg e of ground water Water conservation/rain water harvesting/recharge of ground water: 60% 60% Staircases Staircases: 80% 80% Corridor/Lobbies Corridor/Lobbies: 80% 80% Electricity Not started Indoor Sports facility Not started Power Backup Not started Water and Sanitation Not started Elevation work Not started Emergency Evacuation services Not started Fire protection and fire safety requirements, internal Not started Common entrance and exit for the building/common portico/foyer/vera ndah Not started Open parking areas Not started Terrace Not started
Block 1 Block 1: 93% 93% Block 2 Block 2: 93% 93% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Upto Plinth Level Upto Plinth Level: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 100% 100% Basic work of Water supply,
Block 1 Block 1: 93% 93% Block 2 Block 2: 93% 93% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Upto Plinth Level Upto Plinth Level: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 100% 100% Basic work of Water supply,
Block 1 Block 1: 93% 93% Block 2 Block 2: 93% 93% Earth work and other leveling preparation work Earth work and other leveling preparation work: 100% 100% Upto Plinth Level Upto Plinth Level: 100% 100% Retaining wall (All types) Retaining wall (All types): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 100% 100% Basic work of Water supply,
Quarterly return, Q2 2026-27 Dates Dates 2023 2025 2027 Work began 1 Oct 2022 As of 18 Nov 2026 RERA deadline 30 Apr 2027 Builder's schedule ends 30 Apr 2027 Work began: 1 Oct 2022 As of 18 Nov 2026 RERA deadline: 30 Apr 2027 Builder's schedule ends: 30 Apr 2027
2023 2024 2025 2026 2027 Work began 1 Oct 2022 As of 18 Nov 2026 RERA deadline 30 Apr 2027 Builder's schedule ends 30 Apr 2027 Work began: 1 Oct 2022 As of 18 Nov 2026 RERA deadline: 30 Apr 2027 Builder's schedule ends: 30 Apr 2027
2023 2024 2025 2026 2027 Work began 1 Oct 2022 As of 18 Nov 2026 RERA deadline 30 Apr 2027 Builder's schedule ends 30 Apr 2027 Work began: 1 Oct 2022 As of 18 Nov 2026 RERA deadline: 30 Apr 2027 Builder's schedule ends: 30 Apr 2027
2023 2024 2025 2026 2027 Work began 1 Oct 2022 As of 18 Nov 2026 RERA deadline 30 Apr 2027 Builder's schedule ends 30 Apr 2027 Work began: 1 Oct 2022 As of 18 Nov 2026 RERA deadline: 30 Apr 2027 Builder's schedule ends: 30 Apr 2027
Specified structure What the promoter specified · not an inspection Specified finishes Specification sheet · brands "or equivalent" Certificates Engineer, architect and fire certificates Not verified yet: Possession, agreement; Structure; Structural safety certificate; Internal roads; Completion, accountant; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Design consultants (Form 6).
Development · ₹107.56 Cr: 80.1% ₹135 Cr estimated cost Land · ₹26.76 Cr 19.9% Development · ₹107.56 Cr 80.1%
Sales Sold vs unsold, Q2 2026-27 Sold (307): 99.4% Unsold (2): 0.6% 99% 309 flats Sold (307) 99.4% Unsold (2) 0.6%
Sold per quarter Q4 2025-26 0 flats Q1 2026-27 0 flats Q2 2026-27 0 flats
Q4 2025-26 0 flats Q1 2026-27 0 flats Q2 2026-27 0 flats
Q4 2025-26 0 flats Q1 2026-27 0 flats Q2 2026-27 0 flats
Q4 2025-26 0 flats Q1 2026-27 0 flats Q2 2026-27 0 flats
Compliance Escrow, Q2 2026-27 Paid in Paid into the designated account in Q2 2026-27 ₹132.16 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹105.24 Cr
Paid in Paid into the designated account in Q2 2026-27 ₹132.16 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹105.24 Cr
Paid in Paid into the designated account in Q2 2026-27 ₹132.16 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹105.24 Cr
Paid in Paid into the designated account in Q2 2026-27 ₹132.16 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹105.24 Cr
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Stage Progress as reported, by quarter Q3 2025-26 Q3 2025-26: 97% built, as the promoter reported it 97% Q4 2025-26 Q4 2025-26: 97% built, as the promoter reported it 97% Q1 2026-27 Q1 2026-27: 98% built, as the promoter reported it 98% Q2 2026-27 Q2 2026-27: 98% built, as the promoter reported it 98%
Q3 2025-26 Q3 2025-26: 97% built, as the promoter reported it 97% Q4 2025-26 Q4 2025-26: 97% built, as the promoter reported it 97% Q1 2026-27 Q1 2026-27: 98% built, as the promoter reported it 98% Q2 2026-27 Q2 2026-27: 98% built, as the promoter reported it 98%
Q3 2025-26 Q3 2025-26: 97% built, as the promoter reported it 97% Q4 2025-26 Q4 2025-26: 97% built, as the promoter reported it 97% Q1 2026-27 Q1 2026-27: 98% built, as the promoter reported it 98% Q2 2026-27 Q2 2026-27: 98% built, as the promoter reported it 98%
Q3 2025-26 Q3 2025-26: 97% built, as the promoter reported it 97% Q4 2025-26 Q4 2025-26: 97% built, as the promoter reported it 97% Q1 2026-27 Q1 2026-27: 98% built, as the promoter reported it 98% Q2 2026-27 Q2 2026-27: 98% built, as the promoter reported it 98%
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Unregistered agreements, over 10% paid; Sale deed in favour of.
Singasandra Country club road Hosur road near Royal Enfield show room Doddakannelli HSR sector 2 Garden layout HSR 3rd sector lead off drains NGV to HSR Layout SUBASH NAGARA GARVE BHAVI PALYA PARAPPAN AGRAHARA G K LAYOUT KUDLU VILLAGE B.T.R GARDEN LAYOUT MUNIREDDY LAYOUT NEAR MANGAMMNAPALYA 1 km 3 km 2 km Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Storm drain, primary Storm drain, smaller Lake or tank Metro lines (dashed: planned) Metro station High-tension line, 765, 400, 220 and 66 kV Its corridor, to scale Buried cable Government-flagged flood location The site38 63 57 37 62 67 56 64 61 58 55 62 6 63 66 64/4, 64/5 65/1B 200 m
Assetz Ren & Rei: the price is part of that project's own report Adarsh Rosewood: the price is part of that project's own report Assetz Mizumi Reserve Tower A1 A2 A4: the price is part of that project's own report 2BHK: median ₹39,500 /mo over 186 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹39,500 /mo 3BHK · 105 listings 3BHK: median ₹60,000 /mo over 105 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹60,000 /mo 4BHK · 9 listings 4BHK: median ₹96,000 /mo over 9 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹96,000 /mo 1BHK · 66 listings 1BHK: median ₹20,500 /mo over 66 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹20,500 /mo 2BHK · 186 listings 2BHK: median ₹39,500 /mo over 186 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹39,500 /mo 3BHK · 105 listings 3BHK: median ₹60,000 /mo over 105 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹60,000 /mo 4BHK · 9 listings 4BHK: median ₹96,000 /mo over 9 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹96,000 /mo
1BHK · 66 listings 1BHK: median ₹20,500 /mo over 66 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹20,500 /mo 2BHK · 186 listings 2BHK: median ₹39,500 /mo over 186 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹39,500 /mo 3BHK · 105 listings 3BHK: median ₹60,000 /mo over 105 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹60,000 /mo 4BHK · 9 listings 4BHK: median ₹96,000 /mo over 9 listings. Rental listings within 3 km, seen 3 Apr 2026 to 2 Oct 2026: asking rents of whole flats, medians by bedroom count ₹96,000 /mo
Synergy, about 0.5 km: 95 unsold ÷ 20 booked in 9 months 43 months Within 4 km, pooled 9,321 unsold flats ÷ 277 booked a month across 75 projects 34 months Adarsh Tropica (Phase-2) Adarsh Tropica (Phase-2), about 0.5 km: 254 unsold ÷ 229 booked in 9 months 10 months Msr Passion Square Msr Passion Square, about 0.5 km: 107 unsold ÷ 11 booked in 9 months 88 months Mana Cresta Mana Cresta, 520 m: 77 unsold ÷ 19 booked in 9 months 37 months Haven Phase 2 Haven Phase 2, about 0.5 km: 132 unsold ÷ 10 booked in 6 months 79 months Assetz Beyond Ordinary Assetz Beyond Ordinary, 630 m: 162 unsold ÷ 42 booked in 9 months 35 months Synergy Synergy, about 0.5 km: 95 unsold ÷ 20 booked in 9 months 43 months
Within 4 km, pooled 9,321 unsold flats ÷ 277 booked a month across 75 projects 34 months Adarsh Tropica (Phase-2) Adarsh Tropica (Phase-2), about 0.5 km: 254 unsold ÷ 229 booked in 9 months 10 months Msr Passion Square Msr Passion Square, about 0.5 km: 107 unsold ÷ 11 booked in 9 months 88 months Mana Cresta Mana Cresta, 520 m: 77 unsold ÷ 19 booked in 9 months 37 months Haven Phase 2 Haven Phase 2, about 0.5 km: 132 unsold ÷ 10 booked in 6 months 79 months Assetz Beyond Ordinary Assetz Beyond Ordinary, 630 m: 162 unsold ÷ 42 booked in 9 months 35 months Synergy Synergy, about 0.5 km: 95 unsold ÷ 20 booked in 9 months 43 months
Within 4 km, pooled 9,321 unsold flats ÷ 277 booked a month across 75 projects 34 months Adarsh Tropica (Phase-2) Adarsh Tropica (Phase-2), about 0.5 km: 254 unsold ÷ 229 booked in 9 months 10 months Msr Passion Square Msr Passion Square, about 0.5 km: 107 unsold ÷ 11 booked in 9 months 88 months Mana Cresta Mana Cresta, 520 m: 77 unsold ÷ 19 booked in 9 months 37 months Haven Phase 2 Haven Phase 2, about 0.5 km: 132 unsold ÷ 10 booked in 6 months 79 months Assetz Beyond Ordinary Assetz Beyond Ordinary, 630 m: 162 unsold ÷ 42 booked in 9 months 35 months Synergy Synergy, about 0.5 km: 95 unsold ÷ 20 booked in 9 months 43 months
Doddakannelli 500 m Basemap: Esri, OpenStreetMap contributors
Map of storm drains, lakes and government-flagged flood locations within about 950 m of the site.
Lake or tank Storm drain, primary Government-flagged flood location The site20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground 0 m 10 m 20 m 30 m 40+ m 2 to 5 5 to 10 10 to 20 20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground 0 m 10 m 20 m 30 m 40+ m 2 to 5 5 to 10 10 to 20 20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
Connectivity Road distance from the site Kempegowda Airport Kempegowda Airport: 52.1 km by road 52.1 km MG Road (CBD) MG Road (CBD): 17.5 km by road 17.5 km Manyata Tech Park Manyata Tech Park: 25.0 km by road 25.0 km ITPL, Whitefield ITPL, Whitefield: 18.8 km by road 18.8 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 7.8 km by road 7.8 km Electronic City Ph 1 Electronic City Ph 1: 11.6 km by road 11.6 km
Kempegowda Airport Kempegowda Airport: 52.1 km by road 52.1 km MG Road (CBD) MG Road (CBD): 17.5 km by road 17.5 km Manyata Tech Park Manyata Tech Park: 25.0 km by road 25.0 km ITPL, Whitefield ITPL, Whitefield: 18.8 km by road 18.8 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 7.8 km by road 7.8 km Electronic City Ph 1 Electronic City Ph 1: 11.6 km by road 11.6 km
Kempegowda Airport Kempegowda Airport: 52.1 km by road 52.1 km MG Road (CBD) MG Road (CBD): 17.5 km by road 17.5 km Manyata Tech Park Manyata Tech Park: 25.0 km by road 25.0 km ITPL, Whitefield ITPL, Whitefield: 18.8 km by road 18.8 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 7.8 km by road 7.8 km Electronic City Ph 1 Electronic City Ph 1: 11.6 km by road 11.6 km
Kempegowda Airport Kempegowda Airport: 52.1 km by road 52.1 km MG Road (CBD) MG Road (CBD): 17.5 km by road 17.5 km Manyata Tech Park Manyata Tech Park: 25.0 km by road 25.0 km ITPL, Whitefield ITPL, Whitefield: 18.8 km by road 18.8 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: 7.8 km by road 7.8 km Electronic City Ph 1 Electronic City Ph 1: 11.6 km by road 11.6 km
Six city anchors · OSRM, no traffic Nuisances Distance from the site Landfill or waste station Landfill or waste station: 1.6 km 1.6 km Electrical substation Electrical substation: 2.4 km 2.4 km Sewage treatment plant Sewage treatment plant: 2.5 km 2.5 km Prison Prison: 2.6 km, Bangalore Central Jail 2.6 km
Landfill or waste station Landfill or waste station: 1.6 km 1.6 km Electrical substation Electrical substation: 2.4 km 2.4 km Sewage treatment plant Sewage treatment plant: 2.5 km 2.5 km Prison Prison: 2.6 km, Bangalore Central Jail 2.6 km
Landfill or waste station Landfill or waste station: 1.6 km 1.6 km Electrical substation Electrical substation: 2.4 km 2.4 km Sewage treatment plant Sewage treatment plant: 2.5 km 2.5 km Prison Prison: 2.6 km, Bangalore Central Jail 2.6 km
Landfill or waste station Landfill or waste station: 1.6 km 1.6 km Electrical substation Electrical substation: 2.4 km 2.4 km Sewage treatment plant Sewage treatment plant: 2.5 km 2.5 km Prison Prison: 2.6 km, Bangalore Central Jail 2.6 km
Sanitary and Electrification Basic work of Water supply, Sanitary and Electrification: 90% 90% Railing and Grill fixing Railing and Grill fixing: 95% 95% Electrification, Water supply and Sanitary Finishing Electrification, Water supply and Sanitary Finishing: 80% 80% Fire prevention and fire fighting fitting and fixture with network Fire prevention and fire fighting fitting and fixture with network: 75% 75% Club House Club House: 30% 30% Gym Gym: 10% 10% Water Supply, external Water Supply, external: 70% 70% Sewage and Drainage System Sewage and Drainage System: 70% 70% Solid waste management and disposal Solid waste management and disposal: 60% 60% Storm water drains Storm water drains: 70% 70% Fire protection and fire safety requirements, external Fire protection and fire safety requirements, external: 50% 50% Parks & Tree planting Parks & Tree planting: 30% 30% Water Supply, internal Water Supply, internal: 70% 70% Water conservation/rain water harvesting/recharge of ground water Water conservation/rain water harvesting/recharge of ground water: 60% 60% Staircases Staircases: 80% 80% Corridor/Lobbies Corridor/Lobbies: 80% 80% Electricity Not started Indoor Sports facility Not started Power Backup Not started Water and Sanitation Not started Elevation work Not started Emergency Evacuation services Not started Fire protection and fire safety requirements, internal Not started Common entrance and exit for the building/common portico/foyer/verandah Not started Open parking areas Not started Terrace Not started Sanitary and Electrification Basic work of Water supply, Sanitary and Electrification: 90% 90% Railing and Grill fixing Railing and Grill fixing: 95% 95% Electrification, Water supply and Sanitary Finishing Electrification, Water supply and Sanitary Finishing: 80% 80% Fire prevention and fire fighting fitting and fixture with network Fire prevention and fire fighting fitting and fixture with network: 75% 75% Club House Club House: 30% 30% Gym Gym: 10% 10% Water Supply, external Water Supply, external: 70% 70% Sewage and Drainage System Sewage and Drainage System: 70% 70% Solid waste management and disposal Solid waste management and disposal: 60% 60% Storm water drains Storm water drains: 70% 70% Fire protection and fire safety requirements, external Fire protection and fire safety requirements, external: 50% 50% Parks & Tree planting Parks & Tree planting: 30% 30% Water Supply, internal Water Supply, internal: 70% 70% Water conservation/rain water harvesting/recharge of ground water Water conservation/rain water harvesting/recharge of ground water: 60% 60% Staircases Staircases: 80% 80% Corridor/Lobbies Corridor/Lobbies: 80% 80% Electricity Not started Indoor Sports facility Not started Power Backup Not started Water and Sanitation Not started Elevation work Not started Emergency Evacuation services Not started Fire protection and fire safety requirements, internal Not started Common entrance and exit for the building/common portico/foyer/verandah Not started Open parking areas Not started Terrace Not started Sanitary and Electrification Basic work of Water supply, Sanitary and Electrification: 90% 90% Railing and Grill fixing Railing and Grill fixing: 95% 95% Electrification, Water supply and Sanitary Finishing Electrification, Water supply and Sanitary Finishing: 80% 80% Fire prevention and fire fighting fitting and fixture with network Fire prevention and fire fighting fitting and fixture with network: 75% 75% Club House Club House: 30% 30% Gym Gym: 10% 10% Water Supply, external Water Supply, external: 70% 70% Sewage and Drainage System Sewage and Drainage System: 70% 70% Solid waste management and disposal Solid waste management and disposal: 60% 60% Storm water drains Storm water drains: 70% 70% Fire protection and fire safety requirements, external Fire protection and fire safety requirements, external: 50% 50% Parks & Tree planting Parks & Tree planting: 30% 30% Water Supply, internal Water Supply, internal: 70% 70% Water conservation/rain water harvesting/recharge of ground water Water conservation/rain water harvesting/recharge of ground water: 60% 60% Staircases Staircases: 80% 80% Corridor/Lobbies Corridor/Lobbies: 80% 80% Electricity Not started Indoor Sports facility Not started Power Backup Not started Water and Sanitation Not started Elevation work Not started Emergency Evacuation services Not started Fire protection and fire safety requirements, internal Not started Common entrance and exit for the building/common portico/foyer/verandah Not started Open parking areas Not started Terrace Not started Singasandra Country club road Hosur road near Royal Enfield show room Doddakannelli HSR sector 2 Garden layout HSR 3rd sector lead off drains NGV to HSR Layout SUBASH NAGARA GARVE BHAVI PALYA PARAPPAN AGRAHARA G K LAYOUT KUDLU VILLAGE B.T.R GARDEN LAYOUT MUNIREDDY LAYOUT NEAR MANGAMMNAPALYA 1 km 3 km 2 km