JCB is repairing the road in front of Aditya Rika Apartment.
Overview
Adithya Rica
Overview
Adithya Rica
Overview
Adithya Rica
Overview
Photo: Durgaprasadreddy ChagantiTitle & ownership
Approvals
| Building plan (BBMP) | Sanctioned 18 Aug 2021 · No. BBMP/Ad.Com/MDP/0012/21-22 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Apartments · avg 71 m² 100%
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 18 Aug 2021 | |
| Escrow bank | STATE BANK OF INDIA · SME BRANCH MAHADEVAPURA |
Data room
116 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
JCB is repairing the road in front of Aditya Rika Apartment.
I'm not sure if the contact numbers provided on the website are accurate. The person who answered the call seemed unaware of even the basic details about the apartment and disconnected the call without providing any proper information. This…
It's looks like 5 aditya apt near by.. So it's tell the story
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| 10x ELapsed · completion date passed | MAZ RD Builders and Developers Private Limited | Apartment | 478 sqft carpet (as filed) | Dec 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
| Adarsh ParadiseActive · 93% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
8 of 328 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
All 345 projects in Old Madras Road → · Adithya Constructions's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Adithya Rica in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | consent order W-340389 · issued 4 Nov 2023 |
|---|
| Water and sewerage NOC (BWSSB) | issued 29 Jan 2021 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2025 |
| Land conversion | Converted 23 Feb 2011 · BDA | |
|---|---|---|
| Survey numbers | SY. NO 65/2 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| Apartments | 116 | 768 |
| Inspira Infinity | about 2 km | Locked | |
|---|---|---|---|
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 2.5 km | Locked | |
| Reflections 66 | about 2.5 km | Locked | |
| Jeevan's Allure | about 2.5 km | Locked | |
| Poetry Of Earth | about 2.5 km | Locked | |
| Assetz 66 & Shibui | about 2.5 km | Locked | |
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | about 2.5 km | Locked | |
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | about 2.5 km | Locked | |
| Axis Ekatva | about 3.5 km | Locked | |
| Coevolve Misty Shores | about 3.5 km | Locked | |
| Adarsh Park Heights Phase-2 | about 3.5 km | Locked | |
| Vaswani Starlight | about 4 km | Locked |
| Adithya Rica This project | This project is the point the others are measured from | 31 Dec 2025 | – | Not verified yet |
|---|---|---|---|---|
| Inspira Infinity | about 2 km | 31 Jan 2029 | 95% (100 of 105) | Locked |
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 2.5 km | 30 Sep 2027 | 100% (192 of 192) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | 61% Residential (main), 39% Agriculture, over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 1.5 km, Varthur Columbia Asia hospital | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity | |
|---|---|---|
| Covered parking per unit | 1.00 (116 covered spaces for 116 units) | |
| Power backup | Not declared |
| Completion | Completed, occupancy certificate 28 Dec 2023 |
|---|
| Schedule end | 31 Jul 2024 | |
|---|---|---|
| RERA completion date | 31 Dec 2025 | |
| Work began, as filed | 2 Oct 2021 |
| Wall thickness | External walls: 6" | |
|---|---|---|
| Building heights, fire NOC | 15 m filed, 2 towers |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows | |
|---|---|---|
| Wiring | Copper wiring | |
| Power backup | Not provided |
| Fire safety | Filed with the registration | |
|---|---|---|
| Architect's certificate, registration | Dated 7 Dec 2021 · site inspected 2 Dec 2021 | |
| Chartered accountant's certificate, registration | Dated 18 May 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹46.81 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹39.87 Cr | |
| Estimated cost, chartered accountant's certificate | ₹46.81 Cr, same as the filing |
Sold (116) 100%
| Flats sold, at completion | 116 | |
|---|---|---|
| Flats unsold, at completion | 0 | |
| Flats in the phase | 116 |
| Escrow bank | STATE BANK OF INDIA · SME BRANCH MAHADEVAPURA | |
|---|---|---|
| Share of collections the promoter declared for escrow | 70% |
| K-RERA registrations under this promoter | 6 | |
|---|---|---|
| Marked completed | 4 | |
| Past promised date, not completed | 1 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Reflections 66 |
|---|
| about 2.5 km |
| 31 Dec 2030 |
| 15% (10 of 66) |
| Locked |
| Jeevan's Allure | about 2.5 km | 31 Jul 2027 | 32% (49 of 152) | Locked |
|---|
| Poetry Of Earth | about 2.5 km | 31 Dec 2028 | 25% (77 of 312) | Locked |
|---|
| Assetz 66 & Shibui | about 2.5 km | 30 Jun 2028 | 75% (77 of 102) | Locked |
|---|
| Projects within 4 km, counted | 72 (72 with an approximate location) | |
|---|---|---|
| Flats in them | 21,274 | |
| Booked | 13,075 of 21,274 (61%) | |
| Unsold | 8,199 | |
| Booked a month, pooled | 320 flats | |
| Months to sell, pooled | 22 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, secondary drain | |
|---|---|---|
| Metro, operational | about 4 km, Kadugodi | |
| Metro, under construction | about 6 km, Marathahalli |
| Kempegowda Airport | 41.5 | 28 |
| MG Road (CBD) | 20.5 | 17.5 |
| Manyata Tech Park | 24.5 | 18 |
| ITPL, Whitefield | 8.5 | 4.5 |
| Ecospace, Bellandur ORR | 13 | 9 |
| Electronic City Ph 1 | 23.5 | 15.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1 km |