Do not buy the property if you get it for a lower price also. The title is not verified properly and has many disputes. The developers Manoj and Vikas are the number one frauds. Do not trust them.
Overview
Aban Desire
Overview
Aban Desire
Overview
Aban Desire
Overview
Title & ownership
Approvals
| Building plan (BMRDA) | Sanctioned 14 Mar 2013 · No. APA/LAO/113/2012-13 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹5.00 Cr 13%Development · ₹33.38 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BMRDA) | Sanctioned 14 Mar 2013 | |
| Escrow bank | BANK OF INDIA · Bangalore Branch |
Data room
98 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Do not buy the property if you get it for a lower price also. The title is not verified properly and has many disputes. The developers Manoj and Vikas are the number one frauds. Do not trust them.
Same not paying emi I heard from loan recovery they are not paying emi of 15 people all are facing same issue
Very third class , not paid emi not received call after sales ,
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| 10x ELapsed · completion date passed | MAZ RD Builders and Developers Private Limited | Apartment | 478 sqft carpet (as filed) | Dec 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Adarsh ParadiseActive · 93% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
| Adithya RicaCompleted · OC 28-12-2023 | ADITHYA CONSTRUCTIONS | Apartment | 769 sqft carpet (as filed) | Completed |
8 of 328 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aban Desire in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2028 |
| Land conversion | Converted 11 May 2011 · DC Bengaluru | |
|---|---|---|
| Survey numbers | 216 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 100 | 801 |
| 3BHK | 24 | 925 |
| 4BHK | 16 | 1,054 |
| Mitta Orrin | about 3.5 km | Locked | |
|---|---|---|---|
| Suyug's Saffron | about 3.5 km | Locked | |
| Sowparnika Olivia Nest | about 4 km | Locked | |
| Engrace Vista | about 4 km | Locked | |
| Engrace 4 | about 4.5 km | Locked | |
| Engrace 3 | about 4.5 km | Locked | |
| Mahidhara Harmony | about 4.5 km | Locked | |
| Bilva Phase-II By Bhavisha Homes | about 5 km | Locked | |
| Acorn Hive | about 5.5 km | Locked | |
| Sobha Manhattan Towers-Town Park Phase 1 W 4 & 5 | about 5.5 km | Locked | |
| Sobha Manhattan Towers-Town Park Phase 2 W 1 & 2 | about 5.5 km | Locked | |
| Vistar White Pearl | about 5.5 km | Locked |
| Aban Desire This project | This project is the point the others are measured from | 31 Dec 2028 | – | Not verified yet |
|---|---|---|---|---|
| Mitta Orrin | about 3.5 km | 31 Dec 2027 | 46% (36 of 79) | Locked |
| Suyug's Saffron | about 3.5 km | 31 Dec 2028 | 8% (9 of 110) | Locked |
| Sowparnika Olivia Nest | about 4 km | 30 Sep 2027 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 11.5 km, Gunjur |
|---|
| Nearest storm drain | about 2 km to the west, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · Power Backup | |
|---|---|---|
| Covered parking per unit | 0.92 (129 covered spaces for 140 units) | |
| Power backup | Declared by the promoter |
| Possession, agreement | 31 Dec 2027 | |
|---|---|---|
| Schedule end | 31 Dec 2027 | |
| RERA completion date | 31 Dec 2028 | |
| Work began, as filed | 1 Jul 2022 |
| Building heights, fire NOC | 14.95 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 50 sq m |
|---|
| Architect's certificate, registration | Dated 2 Jun 2022 · site inspected 1 Jun 2022 | |
|---|---|---|
| Engineer's certificate, registration | Dated 2 Jun 2022 |
| Estimated cost, at registration | ₹38.38 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹33.38 Cr |
| Escrow bank | BANK OF INDIA · Bangalore Branch |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 100% (211 of 211) |
| Locked |
| Engrace Vista | about 4 km | 30 Dec 2028 | 46% (181 of 392) | Locked |
|---|
| Engrace 4 | about 4.5 km | 31 Dec 2026 | 100% (145 of 145) | Locked |
|---|
| Engrace 3 | about 4.5 km | 1 Jun 2026 | 100% (76 of 76) | Locked |
|---|
| Projects within 4 km, counted | 24 (24 with an approximate location) | |
|---|---|---|
| Flats in them | 5,075 | |
| Booked | 2,150 of 5,075 (42%) | |
| Unsold | 2,925 | |
| Booked a month, pooled | 86 flats | |
| Months to sell, pooled | 33 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Local authority (Handenahalli Grama Panchayat Office) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 2 km to the west, tertiary drain | |
|---|---|---|
| Metro, operational | about 9.5 km, Bommasandra | |
| Metro, under construction | about 15 km, Kadubeesanahalli |
| Kempegowda Airport | 57 | 42 |
| MG Road (CBD) | 34 | 25 |
| Manyata Tech Park | 38 | 29.5 |
| ITPL, Whitefield | 23.5 | 18 |
| Ecospace, Bellandur ORR | 21 | 15 |
| Electronic City Ph 1 | 21.5 | 11 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2.5 km to the south-west | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2.5 km to the east |