its very unique blend of luxury, comfort, and breathtaking aesthetics villas great to visit location.
Overview
Mitta Orrin
Overview
Mitta Orrin
Overview
Mitta Orrin
Overview
Photo: MITTA ORRINTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Survey | Land converted | Sale deed | Khata | Extent |
|---|---|---|---|---|
| Survey 109 | ||||
| 109/1 | 16 May 2022DC Conversion, Bangalore | 8 Aug 2016 | 16 Jul 2022A Khatha · Local Panchayat(Bidaraguppe Village) | 1,214 sq m |
Approvals
| Building plan (Local Planning Authority) | Sanctioned 15 Jun 2022 · No. STRRPA/TP/DP/02/2022-23 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 15 Jun 2022 | |
| Escrow bank | ICICI Bank · MG Road |
Data room
354 documents filed with K-RERA for this project
₹99 for this report opens Valuation, Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
its very unique blend of luxury, comfort, and breathtaking aesthetics villas great to visit location.
So far we have seen many villa properties but among them, Mitta Orrin was the best project with high quality construction. Sales team were too good and talented by giving genuine results thru their project to the clients, such a beautiful…
This is highly disappointment with the site visit. Sales person sitting there are highly unprofessional with the way they are interacting with the client. It is total waste of time. Mr. Kunal Sinai kunkolienkar who was the primary contact…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Locked |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | 1 | – | Review |
| Loan & collateral | – | – | – | – |
Part of the full report. Unlock all 4 sections
| “the Sanctuary”Completed (regulator flag) | Classic Ventures LLP | Plot | – | Completed |
| 42 Queens SquareCompleted (regulator flag) | GRS INFRA | Plot | – | Completed |
| 77 EastLapsed · completion date passed | MODERN SPAACES | Apartment | – | Jan 2023 |
| 77 East Phase 2 By Modern Spaaces VenturesLapsed · completion date passed | MODERN SPAACES | Apartment | 1,010 sqft carpet (as filed) | Dec 2022 |
| 302 WestCompleted · OC 30-08-2023 | MODERN SPAACES VENTURES | Apartment | 735–1,398 sqft carpet (as filed) | Completed |
| 312 WestLapsed · completion date passed | MODERN SPAACES CONSTRUCTIONS | Apartment | 604 sqft carpet (as filed) | Apr 2022 |
| Aban DazzleRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Rowhouse | 2,040 sqft carpet (as filed) | Dec 2028 |
| Abhee Kings CourtCompleted · OC 26-05-2026 | ABHEE VENTURES PVT LTD | Apartment | 836–1,124 sqft carpet (as filed) | Completed |
8 of 191 other projects in Sarjapur, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Mitta Orrin in the interactive atlas
| 16 May 2022DC Conversion |
| 10 Sep 2004 |
| 16 Jul 2022A Khatha · Local Panchayat(Bidaraguppe Village) |
| 1,619 sq m |
| 109/2B | 19 May 2022DC Conversion, Bangalore | 28 Feb 2022in favour of M/S. Mitta Builders | 16 Jul 2022A Khatha · Local Panchayat(Bidaraguppe Village) | 1,214 sq m |
|---|
| 109/4 | 16 May 2022DC Conversion | 10 Sep 2004 | 16 Jul 2022A Khatha · Local Panchayat(Bidaraguppe Village) | 3,440 sq m |
|---|
| Survey 110 | ||||
|---|---|---|---|---|
| 110/1, 110/2, 110/3 | 12 May 2022DC Conversion | 19 Mar 2021in favour of M/S. Mitta Builders | 16 Jul 2022A Khatha · Local Panchayat(Bidaraguppe Village) | 1,214 sq m + 354.1 (unit to confirm) + 809.36 (unit to confirm) |
| 110/4, 110/5, 110/6, 110/7 | 12 May 2022DC Conversion | 27 May 2010 | 16 Jul 2022A Khatha · Local Panchayat(Bidaraguppe Village) | 202.34 (unit to confirm) + 151.76 (unit to confirm) + 404.68 (unit to confirm) + 404.68 (unit to confirm) |
| Survey 119 | ||||
|---|---|---|---|---|
| 119/1 | 25 May 2022DC Conversion | 4 Mar 2022 | 16 Jul 2022A Khatha · Local Panchayat(Bidaraguppe Village) | 2,023 sq m |
| 119/2 | 19 May 2022DC Conversion | 10 Jun 2022in favour of M/S. Mitta Builders | 16 Jul 2022A Khatha · Local Panchayat(Bidaraguppe Village) | 2,023 sq m |
| 119/3, 119/4 | 19 May 2022DC Conversion | 25 Jan 2022in favour of M/S. Mitta Builders | 16 Jul 2022A Khatha · Local Panchayat(Bidaraguppe Village) | 607.02 (unit to confirm) + 505.85 (unit to confirm) |
| 119/5, 119/6 | 12 May 2022DC Conversion | 6 Sep 2016 | 16 Jul 2022A Khatha · Local Panchayat(Bidaraguppe Village) | 505.85 (unit to confirm) + 505.85 (unit to confirm) |
| 119/7 | 12 May 2022DC Conversion | 6 Sep 2022 | 16 Jul 2022A Khatha · Local Panchayat(Bidaraguppe Village) | 505.85 (unit to confirm) |
| 123/1 | 12 May 2022DC Conversion | 19 Mar 2021in favour of M/S. Mitta Builders | 16 Jul 2022A Khatha · Local Panchayat(Bidaraguppe Village) | 1,113 sq m |
|---|
K-RERA filing, land schedule
Deeds read, and the whole project
Transfer of the land
Title deed executed
Consideration ₹30,000
Title deed filed with K-RERA, pp. 1, 5 · See it in Documents
Transfer of the land
Title deed registered
No. ANK-1-03781-2016-17 · Book 1 · executed 17 Aug 2016
Title deed filed with K-RERA, pp. 1, 8 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹1.10 Cr · Sy 123/1, Bidaraguppe village, Attibele hobli, Anekal taluk · 0-11 Guntas; Sy 110/1, Bidaraguppe village, Attibele hobli, Anekal taluk; and 2 more items
Title deed filed with K-RERA, pp. 1, 5, 12, 13 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹1.10 Cr · Sy 123/1, Bidaraguppe village, Attibele hobli, Anekal taluk · 0-11 Guntas; Sy 110/1, Bidaraguppe village, Attibele hobli, Anekal taluk; and 2 more items
Title deed filed with K-RERA, pp. 1, 5, 12, 13 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹1.10 Cr · Sy 123/1, Bidaraguppe village, Attibele hobli, Anekal taluk · 0-11 Guntas; Sy 110/1, Bidaraguppe village, Attibele hobli, Anekal taluk; and 2 more items
Title deed filed with K-RERA, pp. 1, 5, 12, 13 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹1.10 Cr · Sy 123/1, Bidaraguppe village, Attibele hobli, Anekal taluk · 0-11 Guntas; Sy 110/1, Bidaraguppe village, Attibele hobli, Anekal taluk; and 2 more items
Title deed filed with K-RERA, pp. 1, 5, 12, 13 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹1.10 Cr · Sy 123/1, Bidaraguppe village, Attibele hobli, Anekal taluk · 0-11 Guntas; Sy 110/1, Bidaraguppe village, Attibele hobli, Anekal taluk; and 2 more items
Title deed filed with K-RERA, pp. 1, 5, 12, 13 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹1.10 Cr · Sy 123/1, Bidaraguppe village, Attibele hobli, Anekal taluk · 0-11 Guntas; Sy 110/1, Bidaraguppe village, Attibele hobli, Anekal taluk; and 2 more items
Title deed filed with K-RERA, pp. 1, 5, 12, 13 · See it in Documents
Transfer of the land
Title deed executed
Sy 109/2B, Attibele hobli, Anekal taluk · 12 Guntas
Title deed filed with K-RERA, pp. 1, 10 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹24.5 L · Sy 119/3; 119/4; 119, Bidaraguppe village, Attibele hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 5, 11 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹24.5 L · Sy 119/3; 119/4; 119, Bidaraguppe village, Attibele hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 5, 11 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹24.5 L · Sy 119/3; 119/4; 119, Bidaraguppe village, Attibele hobli, Anekal taluk
Title deed filed with K-RERA, pp. 1, 5, 11 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹26.7 L · Sy 109/2B, Bidaraguppe village, Attibele hobli, Anekal taluk · 0-12 Guntas
Title deed filed with K-RERA, pp. 1, 7, 12 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹26.7 L · Sy 109/2B, Bidaraguppe village, Attibele hobli, Anekal taluk · 0-12 Guntas
Title deed filed with K-RERA, pp. 1, 7, 12 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹49.5 L
Title deed filed with K-RERA, pp. 1, 8 · See it in Documents
Transfer of the land
Title deed executed
Consideration ₹49.5 L
Title deed filed with K-RERA, pp. 1, 8 · See it in Documents
Approval or registration
Building plan sanctioned
Local Planning Authority · plan STRRPA/TP/DP/02/2022-23
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/161122/005456
K-RERA registration ·
Approval or registrationTransfer of the land
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared | |
|---|---|---|
| Mortgage on the project land | None declared |
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 109/1, 109/2A, 109/2B, 109/4, 110/1, 110/2 and 13 more | |
|---|---|---|
| Land area of this registration | 17,875 sq m | |
| Khata | A Khatha · Local Panchayat(Bidaraguppe Village) · 16 Jul 2022 | |
| Sale deed | Dated 10 Sep 2004, 27 May 2010, 8 Aug 2016 and 7 more | |
| Sale deed in favour of | M/S. Mitta Builders |
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2027 |
| Land conversion | 19 of 19 parcels converted | |
|---|---|---|
| Sy 109/1 | Converted 16 May 2022 · DC Conversion, Bangalore | |
| Sy 109/2A, 109/4 | Converted 16 May 2022 · DC Conversion | |
| Sy 109/2B | Converted 19 May 2022 · DC Conversion, Bangalore | |
| Sy 110/1, 110/2, 110/3, 110/4, 110/5… | Converted 12 May 2022 · DC Conversion | |
| Sy 119/1 | Converted 25 May 2022 · DC Conversion | |
| Sy 119/2, 119/3, 119/4 | Converted 19 May 2022 · DC Conversion | |
| Survey numbers | 109/1 · 109/2A · 109/2B · 109/4 · 110/1 · 110/2 · 110/3 · 110/4 · 110/5 · 110/6 · 110/7 · 119/1 · 119/2 · 119/3 · 119/4 · 119/5 · 119/6 · 119/7 · 123/1 |
₹99 for this report opens Valuation, Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Valuation, Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 14.5 km, Gunjur |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup | |
|---|---|---|
| Club House, built | 40% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 55% | |
| Parks, built | 0% | |
| Covered parking per unit | 2.10 (166 covered spaces for 79 units) | |
| Power backup | Declared by the promoter |
As the promoter reported itPossession date in the agreement
| Main structure | 91% · planned by 31 Dec 2024 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 May 2027 | |
| Club house | 40% | |
| Completion | 80% | |
| Completion, accountant | 80% of the estimated cost spent |
| Possession, agreement | 31 Dec 2027 | |
|---|---|---|
| Schedule end | 31 Dec 2027 | |
| RERA completion date | 31 Dec 2027 | |
| Completion date, agreement | 31 Dec 2027 | |
| Work began, as filed | 1 Jan 2023 |
| Building heights, fire NOC | 11.4 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 16 Aug 2022 · site inspected 11 Aug 2022 | |
| Chartered accountant's certificate, registration | Dated 13 Sep 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹6.73 Cr 11.1%Development · ₹53.85 Cr 88.9%
| Estimated cost, at registration | ₹60.58 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹45.00 Cr | |
| Cost incurred | ₹48.44 Cr (80% of the estimate) |
Sold (36) 45.6%Unsold (43) 54.4%
| Sold, Q3 2025-26 | 24 / 79 · 55 available | |
|---|---|---|
| Sold, Q4 2025-26 | 29 / 79 · 50 available | |
| Sold, Q1 2026-27 | 35 / 79 · 44 available | |
| Sold, Q2 2026-27 | 36 / 79 · 43 available | |
| Unsold, Q2 2026-27 | 43 | |
| Sold in Q4 2025-26 | 5 | |
| Sold in Q1 2026-27 | 6 | |
| Sold in Q2 2026-27 | 1 |
| Escrow bank | ICICI Bank · MG Road | |
|---|---|---|
| Designated account, collected | ₹5.93 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹5.93 Cr in Q2 2026-27 (100% of that quarter's deposits) | |
| Net amount withdrawable, Form 4 | ₹14,85,54,383 | |
| Withdrawn from the escrow account to date | ₹33,58,76,970 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 28.7 m
Taluk average; not a reading at the site.
| Groundwater | Anekal taluk average, July 2023: 21.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 2 CGWB wells in Anekal taluk read in this class | |
| Through the year | January 2025: 0.5 m (2 wells), Pre-monsoon 2025: 0.6 m (2 wells), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Anekal taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 11 km, Bommasandra | |
| Metro, under construction | about 18 km, Kadubeesanahalli |
| Kempegowda Airport | 61.5 | 45 |
| MG Road (CBD) | 34 | 28 |
| Manyata Tech Park | 44.5 | 32.5 |
| ITPL, Whitefield | 28 | 21.5 |
| Ecospace, Bellandur ORR | 32 | 18 |
| Electronic City Ph 1 | 16 | 12.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 2 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |