Overview
Aditi Tropica
Overview
Aditi Tropica
Overview
Aditi Tropica
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of 1 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate, 1 page, not in English.
Approvals
| RERA extensions | Granted · Approved 11 Jul 2022 | |
|---|---|---|
| RERA completion date | 31 Dec 2020 |
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Forfeiture, agreement | ₹2,00,000 |
|---|
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹10.00 Cr 46.5%Development · ₹11.50 Cr
Loan & collateral
| Escrow bank | YES BANK · HSR Layout |
|---|
Data room
48 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Adithya Homes GrandCompleted (regulator flag) | ADITHYA HOMES | Plot | ~1,200–1,500 sqft (estimate: filed carpet plus 25%) | Completed |
| Akshaya Temple TreeLapsed · completion date passed | Akshaya Builders Developers Promoters | Apartment | – | Jan 2023 |
| AlayaCompleted (regulator flag) | Essem18 Developers Private Limited | Apartment | 1,762 sqft carpet (as filed) | Completed |
| Alta MonteCompleted (regulator flag) | B S Nesara | Apartment | 1,133 sqft carpet (as filed) | Completed |
| Century MiraiActive · 11% built | Century Real Estate | Apartment | 742–4,111 sqft | Oct 2030 |
| Innovative PalaciaActive · 90% built | SHUBANKARA DEVELOPERS | Apartment | 789–959 sqft carpet (as filed) | Sep 2027 |
| Jeevan PristineCompleted (regulator flag) | M/s. Jeevan Developers | Apartment | – | Completed |
| Jyothi WoodsCompleted · OC 06-09-2022 | Vamsiram Builders | Apartment | – | Completed |
8 of 32 other projects in Marathahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Aditi Tropica is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Land area of this registration | 4,009 sq m |
|---|
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Late-payment interest | 12% p.a. |
|---|
| Adarsh Rosewood | about 2.5 km, to a locality centre | Locked |
|---|
| Satori Residence By Genurise | about 2.5 km, to a locality centre | Locked |
|---|
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 2.5 km, to a locality centre | Locked |
|---|
| Abhee Riviera Royale | about 3 km, to a locality centre | Locked |
|---|
| Assetz Mizumi Reserve Tower A1 A2 A4 | about 3.5 km, to a locality centre | Locked |
|---|
| Aydin Infra Signature 3 | about 3.5 km, to a locality centre | Locked |
|---|
| Haven Phase 2 | about 4 km, to a locality centre | Locked |
|---|
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 4 km, to a locality centre | Locked |
|---|
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 4 km, to a locality centre | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 4 km, to a locality centre | Locked |
|---|
| Mana Jardin Neo | about 4.5 km, to a locality centre | Locked |
|---|
| Adarsh Parkland | about 4.5 km, to a locality centre | Locked |
|---|
| Aditi Tropica This project | This project is the point the others are measured from | 31 Dec 2020 | – | Not verified yet |
|---|---|---|---|---|
| Adarsh Rosewood | about 2.5 km, to a locality centre | 31 Dec 2027 | 20% (24 of 122) | Locked |
| Satori Residence By Genurise | about 2.5 km, to a locality centre | 30 Jun 2030 | 10% (16 of 161) | Locked |
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 2.5 km, to a locality centre | 30 Dec 2030 | 25% (38 of 150) | Locked |
| Abhee Riviera Royale | about 3 km, to a locality centre | 28 Feb 2027 | 59% (57 of 96) | Locked |
| Assetz Mizumi Reserve Tower A1 A2 A4 | about 3.5 km, to a locality centre | 30 Dec 2030 | 69% (302 of 440) | Locked |
| Aydin Infra Signature 3 | about 3.5 km, to a locality centre | 5 Aug 2027 | 50% (6 of 12) | Locked |
| Nearest storm drain | about 0.5 km from the locality centre, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km from the locality centre, Kaikondanahalli Lake |
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Local authority |
| Landfill or waste transfer station | about 2.5 km from the locality centre, named Karnataka Compost Development Centre - KCDC on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 1 km from the locality centre, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km of the locality centre | |
| Crematorium | None within 3 km of the locality centre | |
| Prison | None within 3 km of the locality centre | |
| Electrical substation | about 1 km from the locality centre |
| Schedule end | 28 Dec 2019 | |
|---|---|---|
| RERA completion date | 31 Dec 2020 | Red flag |
| Work began, as filed | 1 Nov 2014 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Architect's certificate, registration | Site inspected 10 Dec 2018 |
|---|
| Estimated cost, at registration | ₹21.50 Cr | |
|---|---|---|
| Estimated cost, architect's certificate | ₹6.53 Cr | |
| Estimated cost, engineer's certificate | ₹18.00 Cr |
| Escrow bank | YES BANK · HSR Layout |
|---|
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed locality; basemap © OpenStreetMap contributors
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed locality; basemap © OpenStreetMap contributors
| Nearest drain | about 0.5 km from the locality centre, primary drain |
|---|