Overview
Aishwarya Green Homes
Overview
Aishwarya Green Homes
Overview
Aishwarya Green Homes
Overview
Photo: Manoj 5 ElementsTitle & ownership
Approvals
| Building plan (BBMP) | Sanctioned 25 Jul 2024 · No. BBMP/Ad.com/BMH/0462/24-25 | |
|---|---|---|
| Fire department | Filed with the registration | |
| SEIAA |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 98 m² 85.7%2BHK 14.3%
Location & risks
Construction & progress
Developer
Land · ₹6.16 Cr 28.3%Development · ₹15.64 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 25 Jul 2024 | |
| Escrow bank | Karnataka Bank Ltd. · Minerva Circle |
Data room
117 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Beryl Tranquil TerracesActive · 44% built | Beryl Properties Private Limited | Apartment | 1,099 sqft carpet (as filed) | Dec 2027 |
| DS Max Sista GrandActive · 62% built | DS-Max Properties | Apartment | 800–1,632 sqft | Dec 2027 |
| Neeladri Kota HillsCompleted · OC 10-12-2018 | Neeladri Properties | Apartment | – | Completed |
| Prestige Lake RidgeCompleted · OC 05-10-2020 | Prestige Group | Apartment | 600–1,750 sqft | Completed |
| Rainbow Misty GreensCompleted (regulator flag) | MR Infraa | Plot | – | Completed |
| Rainbow UnoActive · 15% built | M/S. RAINVAS INFRAA | Apartment | 1,384–1,612 sqft carpet (as filed) | Jun 2031 |
| Srivari GraciousCompleted · OC 14-11-2022 | Srivari Properties | Apartment | 850–1,100 sqft carpet (as filed) | Completed |
| Vanshika SwevenLapsed · completion date passed | VANSHIKA CORPORATION | Apartment | 1,003 sqft carpet (as filed) | Sep 2022 |
8 of 10 other projects in Subramanyapura, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aishwarya Green Homes in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Sep 2026 |
| Land conversion | Declared not converted | |
|---|---|---|
| Survey numbers | 370/351/1/351/1 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 2BHK | 4 | 4,144 |
| 3BHK | 24 | 25,327 |
| Garden Square | about 2.5 km | Locked | |
|---|---|---|---|
| Samaya Sunshine | about 3 km | Locked | |
| Srivara Vasudha | about 3 km | Locked | |
| Jhanavi Trishul Alaska | about 3.5 km | Locked | |
| Mahindra Eden Phase-2 | about 3.5 km | Locked | |
| Sobha Royal Crest | about 3.5 km | Locked | |
| Song Of Wind | about 3.5 km | Locked | |
| Sumadhura Pramoda | about 4.5 km | Locked | |
| Sattva Forest Ridge | about 5 km | Locked | |
| Adarsh Premia | about 5.5 km | Locked | |
| Good Earth Ochre | about 6 km | Locked | |
| Platinum Landmark | about 6.5 km | Locked |
| Aishwarya Green Homes This project | This project is the point the others are measured from | 30 Sep 2026 | – | Not verified yet |
|---|---|---|---|---|
| Garden Square | about 2.5 km | 30 Jun 2026 | 84% (193 of 230) | Locked |
| Samaya Sunshine | about 3 km | 31 Dec 2026 | 33% (8 of 24) | Locked |
| Srivara Vasudha | about 3 km | 30 Nov 2026 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1.5 km, BEML Layout in RR Nagar |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 1 km, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup | |
|---|---|---|
| Covered parking per unit | 1.11 (31 covered spaces for 28 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 2 Sep 2025 |
|---|
| Possession, agreement | 30 Sep 2026 | |
|---|---|---|
| Schedule end | 30 Sep 2026 | |
| RERA completion date | 30 Sep 2026 | |
| Work began, as filed | 1 Aug 2024 |
| Building heights, fire NOC | 11.48 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 10 sq m |
|---|
| Architect's certificate, registration | Site inspected 27 Aug 2024 | |
|---|---|---|
| Chartered accountant's certificate, registration | Dated 16 Aug 2024 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹21.79 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹15.64 Cr |
| Escrow bank | Karnataka Bank Ltd. · Minerva Circle |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 100% (95 of 95) |
| Locked |
| Jhanavi Trishul Alaska | about 3.5 km | 30 Sep 2028 | 32% (47 of 148) | Locked |
|---|
| Mahindra Eden Phase-2 | about 3.5 km | 30 Jul 2027 | 100% (250 of 250) | Locked |
|---|
| Sobha Royal Crest | about 3.5 km | 31 Dec 2028 | 100% (329 of 329) | Locked |
|---|
| Projects within 4 km, counted | 30 (30 with an approximate location) | |
|---|---|---|
| Flats in them | 5,347 | |
| Booked | 3,953 of 5,347 (74%) | |
| Unsold | 1,394 | |
| Booked a month, pooled | 83 flats | |
| Months to sell, pooled | 17 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 3 km, Talaghattapura | |
| Metro, under construction | about 8 km, Kalena Agrahara |
| Kempegowda Airport | 51 | 39.5 |
| MG Road (CBD) | 18 | 12.5 |
| Manyata Tech Park | 26.5 | 20 |
| ITPL, Whitefield | 35 | 25.5 |
| Ecospace, Bellandur ORR | 23 | 17.5 |
| Electronic City Ph 1 | 26 | 18 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 3 km to the north-east | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km |