Title & ownership
Approvals
| Building plan (Hoskote Planning Authority) | Sanctioned 26 Feb 2026 · No. HPA/CC/600/2025-26/3767 | |
|---|---|---|
| Power NOC | Filed with the registration |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan | Sanctioned 26 Feb 2026 | |
| Escrow bank | AU Small Finance Bank · Sahakar Nagar |
Data room
238 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ar Belle Vie Phase 1 in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Fire NOC | Filed with the registration |
|---|
| Environmental clearance | SEIAA 03 CON 2026 · EC identification no. EC26B3813KA5101189N · issued 20 Mar 2026 | Clear |
|---|
| Airport height NOC | NOC ID BIAL/SOUTH/B/070325/1820067 |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 5 Feb 2029 |
| Land conversion | 14 of 14 parcels converted | |
|---|---|---|
| Sy 134/1, 134/2, 134/3, 134/5, 266/1 | Converted 23 Jun 2025 · DC office Bangalore Rural | |
| Sy 134/4 | Converted 23 Jun 2025 · 25 Acres | |
| Sy 266/3, 266/4, 266/5, 267/2, 267/4 | Converted 20 Jun 2025 · DC office Bangalore Rural | |
| Sy 267/1, 268/1, 269/1 | Converted 24 Jun 2025 · DC office Bangalore Rural | |
| Survey numbers | 134/1 · 134/2 · 134/3 · 134/4 · 134/5 · 266/1 · 266/3 · 266/4 · 266/5 · 267/1 · 267/2 · 267/4 · 268/1 · 269/1 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
4BHK villa · avg 220 m² 92.3%5BHK villa · avg 288 m² 7.2%6BHK villa 0.5%
| Type | Villas | Carpet, as filed (sq ft) |
|---|---|---|
| 4BHK villa | 204 | 4,82,804 |
| 5BHK villa | 16 | 49,525 |
| 6BHK villa | 1 | 11,507 |
| Sold, Q2 2026-27 | 37 / 222 | |
|---|---|---|
| Unsold, Q2 2026-27 | 185 | |
| Months to sell, derived from filed bookings | 20 months |
| Sowparnika Ashiyana Phase II | about 7 km | Locked | |
|---|---|---|---|
| Sowparnika Rhythm of Rain | about 7 km | Locked | |
| Kumari Nautilus | about 7.5 km | Locked | |
| Leafy Delight | about 9.5 km | Locked | |
| Sowparnika Euphoria in the East | about 9.5 km | Locked | |
| Vintage Valley | about 9.5 km | Locked | |
| Sobha Windsor Phase 4 Wing 9, 10 And 11 | about 10 km | Locked | |
| Sobha Windsor Phase 2 Wing 3, 4 And 5 | about 10 km | Locked | |
| Sobha Windsor Phase 3 Wing 6, 7 And 8 | about 10.5 km | Locked | |
| Godrej Parkshire (Hoskote) | about 10.5 km | Locked | |
| Nirmaanika Aria | about 11 km | Locked | |
| Riqueza Siri | about 11.5 km | Locked |
| Ar Belle Vie Phase 1 This project | This project is the point the others are measured from | 5 Feb 2029 | 17% (37 of 222) | Not verified yet |
|---|---|---|---|---|
| Sowparnika Ashiyana Phase II | about 7 km | 31 Dec 2025 | 99% (419 of 422) | Locked |
| Sowparnika Rhythm of Rain | about 7 km | 15 Jan 2032 | 97% (703 of 725) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 10.5 km, SIDDHARTHA LAYOUT KADUGODI |
|---|
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 20% | |
| Indoor Sports facility, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Covered parking per unit | 1.10 (244 covered spaces for 222 units) | |
| Sewage plant | Sewage treatment plant | |
| Power backup | Declared by the promoter |
As the promoter reported itPossession date in the agreement
| Main structure | Not started · planned by 31 Dec 2027 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Jan 2029 | |
| Club house | Not started | |
| Completion | 11% | |
| Completion, accountant | 13.8% of the estimated cost spent |
| Possession, agreement | 5 Feb 2029 | |
|---|---|---|
| Schedule end | 31 Jan 2029 | |
| RERA completion date | 5 Feb 2029 | |
| Work began, as filed | 1 Apr 2026 |
| Building heights, fire NOC | 9.75 m filed, 2 towers |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Flooring | Vitrified tiles | |
|---|---|---|
| Toilet tiles | Vitrified tiles (walls, up to 7ft.) | |
| Power backup | Provided | |
| Sewage plant | Sewage treatment plant |
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
|---|---|---|
| Fire safety | Filed with the registration | |
| Environmental clearance | SEIAA 03 CON 2026 · EC identification no. EC26B3813KA5101189N · issued 20 Mar 2026 | |
| Architect, quarterly | Form 5 · Jul 2026, Oct 2026 (2 filed) | |
| Chartered accountant's certificate, registration | Dated 28 Mar 2026 | |
| Architect's quarterly progress certificate | 11.07% complete per the architect, as of 14 Oct 2026 | |
| Architect's quarterly progress certificate dated | 14 Oct 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹13.00 Cr 7.2%Development · ₹167.00 Cr 92.8%
| Estimated cost, at registration | ₹180.00 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹136.00 Cr | |
| Cost incurred | ₹24.89 Cr (13.8% of the estimate) |
Sold (37) 16.7%Unsold (185) 83.3%
| Sold, Q1 2026-27 | 9 / 222 · 213 available | |
|---|---|---|
| Sold, Q2 2026-27 | 37 / 222 · 185 available | |
| Unsold, Q2 2026-27 | 185 | |
| Sold in Q2 2026-27 | 28 |
| Escrow bank | AU Small Finance Bank · Sahakar Nagar | |
|---|---|---|
| Designated account, collected | ₹5.90 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹5.13 Cr in Q2 2026-27 (87% of that quarter's deposits) | |
| Share of collections deposited in escrow | 70% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Kumari Nautilus |
|---|
| about 7.5 km |
| 12 Jan 2028 |
| 69% (114 of 165) |
| Locked |
| Leafy Delight | about 9.5 km | 31 Mar 2028 | 24% (16 of 67) | Locked |
|---|
| Sowparnika Euphoria in the East | about 9.5 km | 31 May 2031 | 99% (1,086 of 1,102) | Locked |
|---|
| Vintage Valley | about 9.5 km | 31 Jan 2030 | 56% (27 of 48) | Locked |
|---|
| Projects within 4 km, counted | 2 (2 with an approximate location) | |
|---|---|---|
| Villas in them | 451 | |
| Booked | 259 of 451 (57%) | |
| Unsold | 192 | |
| Booked a month, pooled | 4 villas | |
| Months to sell, pooled | 47 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 62 m
Taluk average; not a reading at the site.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 11.5 km, Whitefield | |
| Metro, under construction | about 17.5 km, ISRO |
| Kempegowda Airport | 52.5 | 29.5 |
| MG Road (CBD) | 34 | 28 |
| Manyata Tech Park | 33.5 | 27 |
| ITPL, Whitefield | 16 | 13.5 |
| Ecospace, Bellandur ORR | 26.5 | 20.5 |
| Electronic City Ph 1 | 40.5 | 25.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 1 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |