Good location. Ground floor is open for amenities. But their clubhouse showing on Civic Amenities area
Overview
Arvind Sylva
Overview
Arvind Sylva
Overview
Arvind Sylva
Overview
Photo: supriya pandaGood location. Ground floor is open for amenities. But their clubhouse showing on Civic Amenities area
Arvind is a highly untrustworthy and fake builder. Their sales executive Shashank Bangera took our EOI Amount in July. When we backed out as per agreement and written legal terks, they were liable to return the amount taken within 14 days…
Project is good. Location is good, but also bad. Main gate of apartment is always blocked/choked due to Kodathi light traffic jam right now Imagine traffic & pollution levels, when 1. Some part of existing road(road which cannot be widened)…
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | 1 | Clear |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | – | |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Land use converted
Approvals
| Building plan (BDA) | Sanctioned 20 Jun 2026 · No. BDA/NAMA/ASA/AA-5/TASA-4/PO/14/2026-27 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | Filed with the registration | |
Disputes & cases
Builder: Arvind Smarthomes Private Limited
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| Search pending. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | Against | What it's about | Status |
|---|---|---|---|---|---|---|---|
| None found. | |||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
| Filed on | Case no. | Filed at | Location | Filed by | What it's about | Status |
|---|---|---|---|---|---|---|
| None found. | ||||||
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹129.95 Cr 26%Development · ₹370.03 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BDA) | Sanctioned 20 Jun 2026 | |
| Escrow bank | HDFC · Bengaluru |
Data room
Source: K-RERA project page and the documents filed there, as read by us. 26 documents filed with K-RERA, identity papers and photographs, are left out of this list.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Review |
| Construction & progress | – | – | 1 | Clear |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 513 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Arvind Sylva in the interactive atlas
DC Bengaluru · Survey 42/2
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Consideration ₹60.00 Cr
Title deed filed with K-RERA, pp. 1, 11 · See it in Documents
Approval or registration
Land use converted
DC Bengaluru · Survey 42/3
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Arvind Smarthomes Pvt Ltd · Survey 42/2, 42/3
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of Arvind Smarthomes Pvt Ltd · Survey 42/2, 42/3
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/NAMA/ASA/AA-5/TASA-4/PO/14/2026-27
K-RERA filing, approvals
Approval or registration
Khata issued
E Khatha · Survey 42/2, 42/3
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Survey 42/2, 42/3
K-RERA filing, land schedule
Approval or registration
RERA registration
PRM/KA/RERA/1251/446/PR/090726/008800
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of the survey sketch. Filed with K-RERA: ADLR Sketch Sy No - 42 Mullur.
| Filed survey numbers matched to the KGIS map | 2 of 2 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 24,396 sq m | |
| Extent the filed land schedule names for these survey numbers | 19,021 sq m | |
| Plot area against the filed extent | 1.28 times | |
| Land area filed with K-RERA | 19,020 sq m | |
| Village, hobli and taluk on the KGIS map | Mulluru, VARTURU2 hobli, BANGALORE-EAST taluk | |
| Mutation entry | None open on 2 of 2 filed surveys |
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 42/2 (Old Sy No 42), 42/3 | |
|---|---|---|
| Land extent, Sy 42/2 (Old Sy No 42) | 2 Acres | |
| Land extent, Sy 42/3 | 2A 28G | |
| Whole survey numbers on the KGIS map | 24,396 sq m (the project holds a share) | |
| Land area of this registration | 19,020 sq m | |
| Khata | E Khatha · 2 Jul 2026 | |
| Sale deed | Dated 5 Feb 2026 | |
| Sale deed in favour of | Arvind Smarthomes Pvt Ltd |
| Survey | Owners on the RTC | RTC extent | Filed extent | Extents agree? | Land category | Pending mutations |
|---|---|---|---|---|---|---|
| Sy. No. 42/2 | Not read yet | 0 | ||||
| Sy. No. 42/3 | Not read yet | 0 |
| Environmental clearance |
|---|
| Filed with the registration |
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Aug 2031 |
| Land conversion | 2 of 2 parcels converted | |
|---|---|---|
| Sy 42/2 (Old Sy No 42) | Converted 22 Feb 2010 · DC Bengaluru | |
| Sy 42/3 | Converted 2 Jan 2026 · DC Bengaluru | |
| Survey numbers | 42/2 (Old Sy No 42) · 42/3 |
3 BHK Premium · avg 101 m² 36.4%3 BHK Classic · avg 93 m² 27.3%3 BHK Premium+ · avg 101 m² 18.2%4 BHK Luxe · avg 129 m² 18.2%
| 3 BHK Classic | 102 | 1,004 |
| 3 BHK Premium | 136 | 1,083 |
| 3 BHK Premium+ | 68 | 1,083 |
| 4 BHK Luxe | 68 | 1,384 |
| Sold, Q2 2026-27 | 182 / 374 | |
|---|---|---|
| Unsold, Q2 2026-27 | 192 |
| Orion Heights | about 0.5 km | Locked | |
|---|---|---|---|
| Mana Jardin Neo | about 1 km | Locked | |
| Sobha Royal Pavilion Phase 8 - Wing 15 | about 1.5 km | Locked | |
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 1.5 km | Locked | |
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 1.5 km | Locked | |
| 63 Degree East - Tower E | about 2 km | Locked | |
| Satori Residence By Genurise | about 2.5 km | Locked | |
| Birla Evara | about 2.5 km | Locked | |
| Adarsh Rosewood | about 3 km | Locked | |
| Haven Phase 2 | about 3.5 km | Locked | |
| SOBHA Neopolis Phase 2 - W 12 & 13 | about 3.5 km | Locked | |
| SOBHA Neopolis Phase 5 - W 5, 6 & 7 | about 3.5 km | Locked |
| Arvind Sylva This project | This project is the point the others are measured from | 31 Aug 2031 | 49% (182 of 374) | Not verified yet |
|---|---|---|---|---|
| Orion Heights | about 0.5 km | 31 Dec 2025 | 65% (106 of 163) | Locked |
| Mana Jardin Neo | about 1 km | 30 Dec 2032 | 27% (22 of 82) | Locked |
| Sobha Royal Pavilion Phase 8 - Wing 15 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | 58% Agriculture, 42% Commercial (business), over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 2.5 km, Doddakannelli | |
| Government land in the filed surveys | Sy 42: 24% of the parent survey, 1.46 of 6.03 acres | Review |
| Nearest storm drain | about 1 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Amenities declared | Electricity · CCTV Surveillance · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Covered parking per unit | 1.10 (413 covered spaces for 374 units) | |
| Power backup | Declared by the promoter |
| Main structure | Not started · planned by 30 Sep 2029 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Mar 2031 | |
| Completion | 0% |
| Schedule end | 31 Aug 2031 | |
|---|---|---|
| RERA completion date | 31 Aug 2031 | |
| Work began, as filed | 1 Sep 2026 |
| Building heights, fire NOC | 59.95 m filed, 4 towers |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 120 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Oct 2026 | Clear |
|---|---|---|
| Fire safety | Filed with the registration | |
| Environmental clearance | Filed with the registration | |
| Architect, quarterly | Form 5 · Oct 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹499.98 Cr | |
|---|---|---|
| Cost left | ₹351.56 Cr |
Sold (182) 48.7%Unsold (192) 51.3%
| Sold, Q2 2026-27 | 182 / 374 · 192 available | |
|---|---|---|
| Unsold, Q2 2026-27 | 192 |
| Escrow bank | HDFC · Bengaluru | |
|---|---|---|
| Designated account, collected | ₹32.01 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹0 in Q2 2026-27 (0% of that quarter's deposits) |
| about 1.5 km |
| 30 Jun 2026 |
| 100% (113 of 113) |
| Locked |
| Sobha Royal Pavilion Phase 6 - Wing 10 And 11 | about 1.5 km | 30 Jun 2026 | 100% (151 of 151) | Locked |
|---|
| Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14 | about 1.5 km | 30 Jun 2026 | 100% (227 of 227) | Locked |
|---|
| 63 Degree East - Tower E | about 2 km | 31 Dec 2026 | 100% (399 of 399) | Locked |
|---|
| Projects within 4 km, counted | 99 (99 with an approximate location) | |
|---|---|---|
| Flats in them | 37,966 | |
| Booked | 20,906 of 37,966 (55%) | |
| Unsold | 17,060 | |
| Booked a month, pooled | 578 flats | |
| Months to sell, pooled | 28 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Borewell, Local authority (Kodathi Grama. Panchayath) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1 km, secondary drain | |
|---|---|---|
| Metro, operational | about 7.5 km, Electronic City | |
| Metro, under construction | about 5 km, Kadubeesanahalli |
| Kempegowda Airport | 47 | 33.5 |
| MG Road (CBD) | 18 | 15.5 |
| Manyata Tech Park | 25.5 | 19.5 |
| ITPL, Whitefield | 14 | 10 |
| Ecospace, Bellandur ORR | 8 | 5 |
| Electronic City Ph 1 | 12.5 | 8 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km |