Overview
Ataraxis
Overview
Ataraxis
Overview
Ataraxis
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (BDA) | Sanctioned 23 Apr 2024 · No. BDA/TPM/PRL-18/2023-24 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
| Estimated cost, at registration | ₹32.30 Cr | |
|---|---|---|
| Estimated cost, engineer's and chartered accountant's certificates | ₹32.30 Cr, same as the filing |
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 9 Apr 2026 | |
| Building plan (BDA) | Sanctioned 23 Apr 2024 | |
| Escrow bank | Industrial Development Bank of India · Banashakri |
Data room
114 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | 1 | – | Review |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1410 The ResidencesCompleted (regulator flag) | Hitin Property Developments | Apartment | 1,550 sqft carpet (as filed) | Completed |
| A.N. ComfortsCompleted · OC 30-12-2019 | D. Anand Naidu | Apartment | – | Completed |
| Aarohana AlterraActive · 2% built | AAROHANA PROJECTS | Apartment | 1,133–1,936 sqft carpet (as filed) | Aug 2033 |
| AayodhyaLapsed · completion date passed | UTOCORP | Apartment | 285 sqft carpet (as filed) | Jun 2024 |
| AiekyaCompleted · OC 18-08-2025 | Avaneesh Ventures | Apartment | 1,129 sqft carpet (as filed) | Completed |
| Aikyam Emerald GroveCompleted (regulator flag) | AIKYAM VENTURES | Plot | – | Completed |
| Amberstone ElanzaActive · 63% built | SRIVARI VENTURES | Apartment | 804–1,161 sqft carpet (as filed) | Dec 2028 |
| Amberstone IlluminaActive · 54% built | SRIVARI DWELLINGS | Apartment | 793–1,071 sqft carpet (as filed) | Dec 2028 |
8 of 170 other projects in Kanakapura Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Ataraxis in the interactive atlas
Transfer of the land
Sale deed
Survey 13/1, 13/2
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 13/1, 13/2
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · TAHSILDHAR · Survey 13/1
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · TAHSILDHAR · Survey 13/2
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bangalore Urban · Survey 13/1, 13/2
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Bangalore Urban · Survey 13/1, 13/2
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BDA · plan BDA/TPM/PRL-18/2023-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/121124/007225
K-RERA registration ·
Transfer of the landApproval or registrationTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 9 Apr 2026 |
|---|
| Developer's project loan | None declared |
|---|
| Filed survey numbers matched to the KGIS map | 2 of 2 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 17,686 sq m | |
| Extent the filed land schedule names for these survey numbers | 18,717 sq m | |
| Plot area against the filed extent | 0.94 times | |
| Village, hobli and taluk on the KGIS map | K.G.Vajarahalli, UTTARAHALLI -2 hobli, BANGALORE-SOUTH taluk |
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 14 Nov 2026. The drawn plot is a whole survey number, not the project's own share of it; it shows where the land is, not the site.
| Survey numbers | 13/1, 13/2 | |
|---|---|---|
| Land extent, Sy 13/1 | 02 ACRE 05 GUNTAS | |
| Land extent, Sy 13/2 | 2 Acre 20 Guntas | |
| Whole survey numbers on the KGIS map | 17,686 sq m (the project holds a share) | |
| Khata | A Khatha · TAHSILDHAR · 11 Jun 2023; A Khatha · TAHSILDHAR · 12 Jun 2023 | |
| Sale deed | Dated 1 Jan 2022 |
| Filed with the registration |
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| KSPCB | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 1 Jan 2026 |
| Land conversion | Converted 21 Jul 2023 · DC Bangalore Urban | |
|---|---|---|
| Survey numbers | 13/1 · 13/2 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 34 (34 with an approximate location) | |
|---|---|---|
| Plots in them | 6,943 | |
| Booked | 4,072 of 6,943 (59%) | |
| Unsold | 2,871 | |
| Booked a month, pooled | 134 plots | |
| Months to sell, pooled | 21 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | 73% Residential (main), 13% Parks & open space, 13% Valley / drain buffer, over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 1 km, Raghuvanahalli | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | about 0.5 km, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed tank |
| Possession, agreement | 31 Dec 2027 | |
|---|---|---|
| RERA completion date | 1 Jan 2026 | Review |
| Work began, as filed | 23 Apr 2024 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Engineer's certificate, registration | Dated 29 Aug 2024 |
|---|
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Escrow bank | Industrial Development Bank of India · Banashakri |
|---|
| Other phases under this promoter name | 263 | |
|---|---|---|
| With a filed extension or completion | 120 (86 completed, 34 extended) | |
| Average schedule slip | 10 months |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Borewell |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, primary drain | |
|---|---|---|
| Metro, operational | about 0.5 km, Vajarahalli | |
| Metro, under construction | about 5 km, Kalena Agrahara |
| Kempegowda Airport | 49 | 40 |
| MG Road (CBD) | 16 | 12.5 |
| Manyata Tech Park | 24.5 | 20.5 |
| ITPL, Whitefield | 33 | 24 |
| Ecospace, Bellandur ORR | 21 | 15 |
| Electronic City Ph 1 | 23 | 14.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 2.5 km to the south-east, named Anjanapura Quarries on OpenStreetMap | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km |