Overview
Aurora
Overview
Aurora
Overview
Aurora
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approval or registration
Land use converted
Approvals
| Building plan (BBMP) | Sanctioned 3 Oct 2024 · No. Project No. PRJ/14464/23-24 and LP No.BBMP/Addl.Dir/JDNORTH/0120/23-24 | |
|---|---|---|
| Power NOC |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 7 Nov 2024 | |
| Building plan (BBMP) | Sanctioned 3 Oct 2024 | |
| Escrow bank | INDUSIND BANK · MG Road |
Data room
165 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| 4square Park SierraActive · 29% built | 4SQUARE ESTATES | Apartment | 1,083 sqft carpet (as filed) | Dec 2029 |
| Adithya TranquilLapsed · completion date passed | ADITHYA DEVELOPERS | Apartment | – | Jan 2023 |
| Aditi North StarActive · 0% built | ADI DEVELOPERS | Apartment | – | Dec 2030 |
| Aditrri LotusExtended to 20-12-2026 | ADITRRI BUILDERS AND DEVELOPERS | Apartment | 839 sqft carpet (as filed) | Dec 2026 |
| Affinity GardeniaActive · 95% built | AFFINITY PROPERTIES LLP | Apartment | 682–853 sqft carpet (as filed) | Dec 2026 |
| After the RainCompleted · OC 30-04-2022 | Total Environment | Villa | 3,184–5,182 sqft | Completed |
| After the Rain - Phase II ACompleted · OC 10-01-2024 | Total Environment Building Systems Private Limited | Mixed development | 290–2,669 sqft carpet (as filed) | Completed |
| After the Rain Phase IIIActive · 3% built | TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD | Apartment | 2,643–6,964 sqft carpet (as filed) | Apr 2032 |
8 of 135 other projects in Yelahanka, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aurora in the interactive atlas
Deputy commissioner, Bangalore district · Survey 34/1
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 34/1, 407
K-RERA filing, land schedule
Transfer of the land
Sale deed
Survey 34/1, 407
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP, Bangalore · Survey 407
K-RERA filing, land schedule
Approval or registration
Khata issued
A Khatha · BBMP · Survey 34/1
K-RERA filing, land schedule
Transfer of the land
Title deed executed
Consideration ₹26.25 Cr · Sy 34/1, Atturu village, Yelahanka hobli, Bangalore North taluk
Title deed filed with K-RERA, pp. 2, 16, 25 · See it in Documents
Approval or registration
Building plan sanctioned
BBMP · plan Project No. PRJ/14464/23-24 and LP No.BBMP/Addl.Dir/JDNORTH/0120/23-24
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1251/309/PR/141124/007229
K-RERA registration ·
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 7 Nov 2024 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of 4 of the encumbrance certificate. Filed with K-RERA: 6 EC 2004 TO 2023 For amalgamated property, 4 pages, English.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 34/1, 424/2483/410/D4-386 SFS 407 | |
|---|---|---|
| Land extent, Sy 34/1 | 1 Acre, 2 Gunta | |
| Land extent, Sy 424/2483/410/D4-386 SFS 407 | 199.5 (unit to confirm) | |
| Land area of this registration | 4,438 sq m | |
| Khata | A Khatha · BBMP · 31 Oct 2011; A Khatha · BBMP, Bangalore · 25 Jun 2011 | |
| Sale deed | Dated 23 Mar 2011 | |
| Title deed | Consideration ₹3.00 Cr |
| Fire NOC | KSFES/NOC/023/2024 · issued 30 Apr 2024 · building height 65.1 m | Clear |
|---|
| SEIAA | Filed with the registration |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water and sewerage NOC (BWSSB) | issued 19 Apr 2024 |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2027 |
| Land conversion | 1 of 2 parcels converted | |
|---|---|---|
| Sy 34/1 | Converted 13 Oct 2008 · Deputy commissioner, Bangalore district | |
| Sy 424/2483/410/D4-386 SFS 407 | Declared not converted | |
| Survey numbers | 34/1 · 424/2483/410/D4-386 SFS 407 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
TYPE 5 3BHK - 3T - TYPE 1 with 2 balconies ·… 16.7%TYPE 6 3BHK - 3T - TYPE 2 with 2 balconies ·… 16.7%TYPE 7 3BHK - 3T - TYPE 3 with 2 balconies ·… 16.7%TYPE 1 3BHK - 3T - TYPE 1 with 2 balconies &… 8.3%6 other types 41.7%
| TYPE 1 3BHK - 3T - TYPE 1 with 2 balconies & 1 private terrace | 6 | 1,163 |
| TYPE 2 3BHK - 3T - TYPE 2 with 2 balconies & 1 private terrace | 6 | 1,206 |
| TYPE 3 3BHK - 3T - TYPE 3 with 2 balconies & 1 private terrace | 6 | 1,216 |
| TYPE 4A 3BHK - 3T + PREMIUM with 2 balconies & 2 private terrace | 3 | 1,345 |
| TYPE 4B 3BHK - 3T + PREMIUM with 2 balconies & 2 private terrace | 3 | 1,345 |
| TYPE 5 3BHK - 3T - TYPE 1 with 2 balconies | 12 | 1,152 |
| TYPE 6 3BHK - 3T - TYPE 2 with 2 balconies | 12 | 1,206 |
| TYPE 7 3BHK - 3T - TYPE 3 with 2 balconies | 12 | 1,216 |
| TYPE 8A 3BHK - 3T + PREMIUM with 2 balconies & 1 private terrace | 6 | 1,335 |
| TYPE 8B 3BHK - 3T + PREMIUM with 2 balconies & 1 private terrace | 6 | 1,335 |
| Sold, Q1 2026-27 | 49 / 72 | |
|---|---|---|
| Unsold, Q1 2026-27 | 23 | |
| Months to sell, derived from filed bookings | 9 months |
| Century Kindle Phase 1 | about 1 km | Locked | |
|---|---|---|---|
| Shriram Solitaire | about 1.5 km | Locked | |
| Rubby Castle 1 | about 3 km | Locked | |
| Legacy Salvador | about 3.5 km | Locked | |
| 4square Park Sierra | about 3.5 km | Locked | |
| Sri Rama Enclave | about 4 km | Locked | |
| Godrej Aveline | about 4.5 km | Locked | |
| Assetz Soho & Sky | about 5 km | Locked | |
| Cumins Sanctum | about 5.5 km | Locked | |
| Tnm Lakeview | about 6 km | Locked | |
| Assetz Soho & Sky Phase 1b | about 6 km | Locked | |
| Assetz Miru & Miyo | about 6 km | Locked |
| Aurora This project | This project is the point the others are measured from | 31 Dec 2027 | 68% (49 of 72) | Not verified yet |
|---|---|---|---|---|
| Century Kindle Phase 1 | about 1 km | 14 Mar 2031 | 73% (336 of 458) | Locked |
| Shriram Solitaire | about 1.5 km | 15 May 2026 | 100% (269 of 269) | Locked |
| Rubby Castle 1 |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, Attur, Near Dairy Circle |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed pond |
| Amenities declared | Electricity · CCTV Surveillance · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Gym, built | 0% | |
| Water and Sanitation, built | 0% | |
| Covered parking per unit | 1.25 (90 covered spaces for 72 units) | |
| Power backup | Declared by the promoter |
As the promoter reported it
| Main structure | Not started · planned by 30 Jun 2026 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 28 Sep 2026 | |
| Club house | Not started | |
| Completion | 18% |
| Schedule end | 27 Nov 2026 | |
|---|---|---|
| RERA completion date | 31 Dec 2027 | |
| Work began, as filed | 1 Nov 2024 |
| Building heights, fire NOC | 65.1 m on the fire NOC · 65.7 m filed |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 121.8 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026 (3 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/023/2024 · issued 30 Apr 2024 · building height 65.1 m | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026 (3 filed) | |
| Architect's certificate, registration | Dated 8 Oct 2024 | |
| Engineer's certificate, registration | Dated 8 Oct 2024 | |
| Chartered accountant's certificate, registration | Dated 5 Oct 2024 | |
| Architect's quarterly progress certificate dated | 8 Apr 2026 | |
| Architect's site inspection for the quarterly progress certificate | 1 Apr 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹27.98 Cr 27.5%Development · ₹73.94 Cr 72.5%
| Estimated cost, at registration | ₹101.93 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹101.93 Cr, same as the filing |
Sold (49) 68.1%Unsold (23) 31.9%
| Sold, Q3 2025-26 | 34 / 72 · 38 available | |
|---|---|---|
| Sold, Q4 2025-26 | 38 / 72 · 34 available | |
| Sold, Q1 2026-27 | 49 / 72 · 23 available | |
| Unsold, Q1 2026-27 | 23 | |
| Sold in Q4 2025-26 | 4 | |
| Sold in Q1 2026-27 | 11 | |
| 3 BHK, sold | 49 / 72 |
| Escrow bank | INDUSIND BANK · MG Road | |
|---|---|---|
| Designated account, collected | ₹2.03 Cr in Q1 2026-27 | |
| Designated account, withdrawn | ₹2.19 Cr in Q1 2026-27 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| about 3 km |
| 30 Apr 2029 |
| 25% (8 of 32) |
| Locked |
| Legacy Salvador | about 3.5 km | 31 Dec 2026 | 71% (119 of 167) | Locked |
|---|
| 4square Park Sierra | about 3.5 km | 31 Dec 2029 | 8% (14 of 170) | Locked |
|---|
| Sri Rama Enclave | about 4 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
|---|
| Projects within 4 km, counted | 35 (35 with an approximate location) | |
|---|---|---|
| Flats in them | 7,191 | |
| Booked | 3,946 of 7,191 (55%) | |
| Unsold | 3,245 | |
| Booked a month, pooled | 126 flats | |
| Months to sell, pooled | 26 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Water supply, as filed | Borewell, BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 8.5 km, Peenya | |
| Metro, under construction | about 3.5 km, Yelahanka |
| Kempegowda Airport | 24 | 18.5 |
| MG Road (CBD) | 20.5 | 14.5 |
| Manyata Tech Park | 13 | 8.5 |
| ITPL, Whitefield | 30 | 22.5 |
| Ecospace, Bellandur ORR | 36 | 23 |
| Electronic City Ph 1 | 40 | 31.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Yelahanka Waste Water Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 0.5 km, named Yelahanka on OpenStreetMap |