Overview
Barca II At Godrej Msr City
Overview
Barca II At Godrej Msr City
Overview
Barca II At Godrej Msr City
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | Godrej Properties Limited · ₹271.20 Cr disbursed | |
|---|---|---|
| Records searched to | 20 Jun 2025 | |
| Building plan (BIAPPA) | Sanctioned 27 Jun 2025 | |
| Escrow bank | Axis Bank · M. G. Road Branch |
Data room
120 documents filed with K-RERA for this project
₹99 for this report opens Valuation, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Locked |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 2 | Clear |
| Loan & collateral | – | – | – | – |
Part of the full report. Unlock all 3 sections
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| AamayaActive · 7% built | SRK INFRA PROJECTS PRIVATE LIMITED | Plot | ~7,780–16,060 sqft (estimate: filed carpet plus 25%) | Jan 2029 |
| Aarohana AdiraActive · 5% built | AAROHANA PROJECTS | Apartment | 776–1,745 sqft carpet (as filed) | Dec 2030 |
| Abhi HomesExtended to 30-12-2026 | ABHI DEVELOPERS | Apartment | – | Dec 2026 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Adarsh Savana Phase 2Registered · no quarterly update yet | ALEKHYA PROPERTY DEVELOPMENTS PVT LTD. | Plot | ~1,200–3,190 sqft (estimate: filed carpet plus 25%) | Jun 2029 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
8 of 293 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Barca II At Godrej Msr City in the interactive atlas
Approval or registration
Land use converted
DC Office, Bangalore Rural · Survey 37/29
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bangalore Rural · Survey 37/24, 37/30
K-RERA filing, land schedule
Approval or registration
Land use converted
DC Office, Bangalore Rural · Survey 37/24, 37/30
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of M S Ramaiah Ventures LLP · Survey 37/24, 37/30, 37/29
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of M S Ramaiah Ventures LLP · Survey 37/24, 37/30, 37/29
K-RERA filing, land schedule
Transfer of the land
Sale deed
in favour of M S Ramaiah Ventures LLP · Survey 37/24, 37/30, 37/29
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Anneshwara Grama Panchayath · Survey 37/24, 37/30, 37/29
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Anneshwara Grama Panchayath · Survey 37/24, 37/30, 37/29
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Anneshwara Grama Panchayath · Survey 37/24, 37/30, 37/29
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
BIAPPA · plan BIAAPA/TP/CC/42/2025-26
K-RERA filing, approvals
Approval or registration
RERA registration
PRM/KA/RERA/1250/303/PR/300625/007887
K-RERA registration
Approval or registrationTransfer of the landTitle checkThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 20 Jun 2025 |
|---|
| Developer's project loan | Godrej Properties Limited · ₹271.20 Cr disbursed |
|---|
Page 1
Page 1 of 2 of the survey sketch. Filed with K-RERA: Ramaiah ADLR Sketch, 2 pages.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Survey numbers | 37/24, 37/30, 37/29 | |
|---|---|---|
| Land extent, Sy 37/24 | 10 Acres | |
| Land extent, Sy 37/30 | 13 Acre | |
| Land extent, Sy 37/29 | 9 Acre 37 Guntas | |
| Land area of this registration | 34,326 sq m | |
| Khata | E Khatha · Anneshwara Grama Panchayath · 24 Mar 2025 | |
| Sale deed | Dated 1 Mar 2024 | |
| Sale deed in favour of | M S Ramaiah Ventures LLP | |
| Title deed | Sy 37, Kasaba hobli, Devanahalli taluk; Sy 37/17, Akkalenahalli - Mallenahalli village, Kasaba hobli, Devanahalli taluk · 08 Guntas; and 7 more items | |
| Title deed | Sy 37, Kasaba hobli, Devanahalli taluk; Sy 37/17, Akkalenahalli - Mallenahalli village, Kasaba hobli, Devanahalli taluk · 08 Guntas; and 7 more items | |
| Title deed | Sy 37, Kasaba hobli, Devanahalli taluk; Sy 37/17, Akkalenahalli - Mallenahalli village, Kasaba hobli, Devanahalli taluk · 08 Guntas; and 7 more items |
Valid as of this reportValidity ended
| Building plan (BIAPPA) | Sanctioned 27 Jun 2025 · No. BIAAPA/TP/CC/42/2025-26 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | KSFES/NOC/422/2024 · issued 21 Jan 2025 | Clear |
| Environmental clearance | SEIAA 74 CON 2024 · EC identification no. EC24B3813KA5675507N · issued 14 Feb 2025 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-347139 · issued 21 Jan 2025 · valid until 26 Aug 2034 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2030 |
| Land conversion | 3 of 3 parcels converted | |
|---|---|---|
| Sy 37/24, 37/30 | Converted 19 Jul 2004 · DC Office, Bangalore Rural | |
| Sy 37/29 | Converted 17 May 2004 · DC Office, Bangalore Rural | |
| Survey numbers | 37/24 · 37/30 · 37/29 |
₹99 for this report opens Valuation, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Valuation, Disputes & cases and Documents for this project, yours to read for good.
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 11.5 km, Shankrappa Layout, MAruthi nagar |
|---|
| Nearest storm drain | about 2 km to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Gym · Power Backup · Water and Sanitation · Childern play Area & Senior Citizen Zone · Sane Volley Ball · Community Park · Sand Pit · Lap Pool · Plaza with Seating area · Cycle track · Plaza · Mini Golf | |
|---|---|---|
| Club House, built | 0% | |
| Electricity, built | 0% | |
| Outdoor Sports facility, built | 0% | |
| Swimming Pool, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Lawn Area with Seating, built | 0% | |
| Gaudi Leisure, Jacuzzi and Kids Pool, built | 0% | |
| Outdoor Screen Provisions and Amphitheatre, built | 0% | |
| Palm Court, built | 0% | |
| Wall Climbing and Kids Play Area, built | 0% | |
As the promoter reported it
| Main structure | 3% · planned by 11 Feb 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 28 Sep 2030 | |
| Club house | Not started | |
| Completion | 16% | |
| Completion, accountant | 15.1% of the estimated cost spent |
| Schedule end | 31 Dec 2030 | |
|---|---|---|
| RERA completion date | 31 Dec 2030 | |
| Work began, as filed | 1 Jan 2026 |
| Building heights, fire NOC | 52.2 m filed, 8 towers |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided |
|---|
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/422/2024 · issued 21 Jan 2025 | |
| Environmental clearance | SEIAA 74 CON 2024 · EC identification no. EC24B3813KA5675507N · issued 14 Feb 2025 | |
| Architect, quarterly | Form 5 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | |
| Architect's certificate, registration | Dated 25 Jun 2025 · site inspected 25 Jun 2025 | |
| Engineer's certificate, registration | Dated 25 Jun 2025 | |
| Architect's quarterly progress certificate | 15.92% complete per the architect, as of 5 Oct 2026 | |
| Architect's quarterly progress certificate dated | 5 Oct 2026 | |
| Architect's site inspection for the quarterly progress certificate | 5 Oct 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹61.14 Cr 8.7%Development · ₹641.93 Cr 91.3%
| Estimated cost, at registration | ₹703.07 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹528.00 Cr | |
| Estimated cost, Form 4 Q2 2026-27 | ₹685.85 Cr | |
| Cost incurred | ₹103.85 Cr (15.1% of the Form 4 Q2 2026-27 estimate) |
Sold (593) 98.5%Unsold (9) 1.5%
| Sold, Q3 2025-26 | 583 / 602 · 19 available | |
|---|---|---|
| Sold, Q4 2025-26 | 593 / 602 · 9 available | |
| Sold, Q1 2026-27 | 592 / 602 · 10 available | |
| Sold, Q2 2026-27 | 593 / 602 · 9 available | |
| Unsold, Q2 2026-27 | 9 | |
| Sold in Q4 2025-26 | 10 | |
| Sold in Q1 2026-27 | 1 booking cancelled or corrected (593 → 592 sold) | |
| Sold in Q2 2026-27 | 1 |
| Escrow bank | Axis Bank · M. G. Road Branch | |
|---|---|---|
| Designated account, collected | ₹16.00 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹62.66 Cr in Q2 2026-27 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Sculpture seating area, built |
|---|
| 0% |
| Jogging Track, built | 0% |
|---|
| Net Cricket, built | 0% |
|---|
| Tennis Court, built | 0% |
|---|
| Covered parking per unit | 1.16 (698 covered spaces for 602 units) |
|---|
| Power backup | Declared by the promoter |
|---|
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class | |
| Through the year | January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several) | |
| Water supply, as filed | Local authority (Anneshwara Grama Panchayath) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 2 km to the south, tertiary drain | |
|---|---|---|
| Metro, operational | about 21.5 km, K.R. Puram | |
| Metro, under construction | about 1.5 km, Doddajala |
| Kempegowda Airport | 8.5 | 5.5 |
| MG Road (CBD) | 29 | 25 |
| Manyata Tech Park | 24 | 17 |
| ITPL, Whitefield | 38 | 24.5 |
| Ecospace, Bellandur ORR | 45.5 | 30 |
| Electronic City Ph 1 | 49 | 39.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 2 km to the north-west, named Sadahalli Quarry on OpenStreetMap | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 1.5 km |