Photo: MANU MSTitle & ownership
Approvals
| Building plan (BIAPPA) | Sanctioned 15 May 2026 · No. BIAPPA/TP/CC/210/2025-26/26-27 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BIAPPA) | Sanctioned 15 May 2026 | |
| Escrow bank | STATE BANK OF INDIA · Banaswadi |
Data room
103 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 2 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | 1 | Clear |
| Loan & collateral | – | – | – | – |
| 2 Oakland EstatesFiled as completed · no completion certificate on record | DEAMANTE PROPERTIES | Plot | ~1,500 sqft (estimate: filed carpet plus 25%) | Aug 2022 |
| AamayaActive · 7% built | SRK INFRA PROJECTS PRIVATE LIMITED | Plot | ~7,780–16,060 sqft (estimate: filed carpet plus 25%) | Jan 2029 |
| Abhi HomesExtended to 30-12-2026 | ABHI DEVELOPERS | Apartment | – | Dec 2026 |
| Adarsh Savana Phase 1Lapsed · completion date passed | SHRESHTA INFRA PROJECTS PRIVATE LIMITED | Plot | – | Oct 2023 |
| Adarsh Savana Phase 2Registered · no quarterly update yet | ALEKHYA PROPERTY DEVELOPMENTS PVT LTD. | Plot | ~1,200–3,190 sqft (estimate: filed carpet plus 25%) | Jun 2029 |
| Aditya Palm GroveApplied for completion 05/12/2019 | SRI ADITYA HOMES PRIVATE LIMITED | Plot | – | Dec 2019 |
| Aero ExoticLapsed · completion date passed | LOTUS ENCLAVE | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2023 |
| Aeropolis, A Project Of Sattva GroupLapsed · completion date passed | TRINAYANI REALTOR PRIVATE LIMITED | Apartment | 280–635 sqft carpet (as filed) | Jul 2026 |
8 of 293 other projects in Devanahalli, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Aarohana Adira in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| KSFES/NOC/226/2024 · issued 31 Jul 2024 | Clear |
| Environmental clearance | SEIAA 110 CON 2024 · EC identification no. EC24C3801KA5782177N · issued 21 Nov 2024 | Clear |
|---|
| Airport height NOC | Filed with the registration |
|---|
| Pollution board (CFE) | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2030 |
| Land conversion | Converted 23 Mar 1991 · DC Office, Bangalore Rural | |
|---|---|---|
| Survey numbers | 27(p) |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
3BHK · avg 99 m² 77.9%2BHK · avg 72 m² 15.7%4BHK · avg 162 m² 6.4%
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 22 | 776 |
| 3BHK | 109 | 1,066 |
| 4BHK | 9 | 1,745 |
| Sold, Q2 2026-27 | 18 / 140 | |
|---|---|---|
| Unsold, Q2 2026-27 | 122 | |
| Months to sell, derived from filed bookings | 20 months |
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 2.5 km | Locked | |
|---|---|---|---|
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 2.5 km | Locked | |
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 2.5 km | Locked | |
| Aeropolis, A Project Of Sattva Group | about 4 km | Locked | |
| Sattva Vasanta Cove | about 5.5 km | Locked | |
| Sattva Vasanta Skye | about 5.5 km | Locked | |
| Varnam Phase 1c | about 6 km | Locked | |
| Birla Trimaya Phase-3 | about 6 km | Locked | |
| Birla Trimaya | about 6.5 km | Locked | |
| Birla Trimaya Phase-2 | about 6.5 km | Locked | |
| Godrej MSR City | about 6.5 km | Locked | |
| Barca II At Godrej Msr City | about 6.5 km | Locked |
| Aarohana Adira This project | This project is the point the others are measured from | 31 Dec 2030 | 13% (18 of 140) | Not verified yet |
|---|---|---|---|---|
| Sobha Oakshire Phase 1 Wing 1,2,7 And 8 | about 2.5 km | 31 Dec 2026 | 100% (30 of 30) | Locked |
| Sobha Oakshire Phase 2 Wing 3,4,9 And 10 | about 2.5 km | 30 Jun 2027 | 100% (30 of 30) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 18 km, Shankrappa Layout, MAruthi nagar |
|---|
| Nearest storm drain | about 1 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
| Amenities declared | Electricity · CCTV Surveillance · Community Hall · Indoor Sports facility · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Community Hall, built | 0% | |
| Parks, built | 0% | |
| Water and Sanitation, built | 0% | |
| Covered parking per unit | 1.20 (168 covered spaces for 140 units) | |
| Power backup | Declared by the promoter |
As the promoter reported itPossession date in the agreement
| Main structure | Not started · planned by 31 Aug 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 31 Aug 2030 | |
| Completion | 5% | |
| Completion, accountant | 24.2% of the estimated cost spent |
| Possession, agreement | 31 Dec 2030 | |
|---|---|---|
| Schedule end | 20 Dec 2030 | |
| RERA completion date | 31 Dec 2030 | |
| Work began, as filed | 1 Jun 2026 |
| Building heights, fire NOC | 44.95 m filed, 2 towers |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 15 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Jul 2026, Oct 2026 (2 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/226/2024 · issued 31 Jul 2024 | |
| Environmental clearance | SEIAA 110 CON 2024 · EC identification no. EC24C3801KA5782177N · issued 21 Nov 2024 | |
| Architect, quarterly | Form 5 · Jul 2026, Oct 2026 (2 filed) | |
| Architect's certificate, registration | Site inspected 28 Feb 2026 | |
| Engineer's certificate, registration | Dated 6 Jun 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹29.13 Cr 20.4%Development · ₹113.34 Cr 79.6%
| Estimated cost, at registration | ₹142.46 Cr | |
|---|---|---|
| Cost incurred | ₹34.49 Cr (24.2% of the estimate) |
Sold (18) 12.9%Unsold (122) 87.1%
| Sold, Q1 2026-27 | 0 / 140 · 140 available | |
|---|---|---|
| Sold, Q2 2026-27 | 18 / 140 · 122 available | |
| Unsold, Q2 2026-27 | 122 | |
| Sold in Q2 2026-27 | 18 | |
| Flats booked, Form 4 Q2 2026-27 | 18 |
| Escrow bank | STATE BANK OF INDIA · Banaswadi | |
|---|---|---|
| Designated account, collected | ₹2.26 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹1.30 Cr in Q2 2026-27 (58% of that quarter's deposits) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Sobha Oakshire Phase 3 Wing 5,6,11 And 12 | about 2.5 km | 31 Dec 2027 | 100% (20 of 20) | Locked |
|---|
| Aeropolis, A Project Of Sattva Group | about 4 km | 9 Jul 2026 | 95% (949 of 1,001) | Locked |
|---|
| Sattva Vasanta Cove | about 5.5 km | 27 Dec 2030 | 14% (28 of 200) | Locked |
|---|
| Sattva Vasanta Skye | about 5.5 km | 6 May 2031 | 28% (301 of 1,077) | Locked |
|---|
| Projects within 4 km, counted | 16 (16 with an approximate location) | |
|---|---|---|
| Flats in them | 3,846 | |
| Booked | 2,539 of 3,846 (66%) | |
| Unsold | 1,307 | |
| Booked a month, pooled | 46 flats | |
| Months to sell, pooled | 24 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Devanahalli taluk average, July 2023: 19.3 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class | |
| Through the year | January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several) | |
| Water supply, as filed | Borewell, Local authority (Anneshwara Grama Panchayath) |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 1 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 26.5 km, K.R. Puram | |
| Metro, under construction | about 4.5 km, Airport City |
| Kempegowda Airport | 9 | 4.5 |
| MG Road (CBD) | 34.5 | 31 |
| Manyata Tech Park | 29.5 | 23 |
| ITPL, Whitefield | 42 | 28.5 |
| Ecospace, Bellandur ORR | 52.5 | 35 |
| Electronic City Ph 1 | 54 | 44.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | about 1 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |