Building plan (BIAPPA)Sanctioned 16 Feb 2023No. LP# BIAPPA/TP/CC/226/2022-23/2658
RERA extensionsNone on the filingFiling read 3 Nov 2026
Land conversionConverted 17 Oct 2012Deputy Commissioner, Bangalore Rural District
Permits
Validity
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
Locked
Forfeiture, agreement•• %
Forfeiture, allotment letterNot verified yet
Transfer feeNot verified yet
Maintenance includedNot verified yet
Cancellation
Forfeiture
Not verified yet
Agreement and allotment letter
Valuation
What is it worth?
Locked
Recent price, super built-upNot verified yet
Recent price, carpet₹ ••,•••
Phase 1 → Phase 2Not verified yet
Gross yield, per sq ftNot verified yet
This project
Price
Price per sq ft, super built-up
Not verified yet
Location & risks
What is the location like?
Review1 to review
Groundwater, taluk average19.3 m below groundDevanahalli taluk, July 2023
Water supply, as filedLocal authority (Kannamangala Grama panchayat)Declared by the promoter
Metro, operationalabout 26 kmK.R. Puram
Construction & progress
How is it being built, and when will it be ready?
Clear1 clear
Completion91%As of Q2 2026-27, promoter's return
Possession, agreement30 Jun 2027Agreement for sale, p. 9
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Clear2 clear
Cost left₹34.67 CrAs of Q2 2026-27
Sold30 / 30✓ClearClear
Sold in Q2 2026-270✓ClearClear
Funding
Estimated cost
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan (BIAPPA)
Sanctioned 16 Feb 2023
Escrow bank
Axis Bank · M G Road
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
180 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Valuation, Contract & costs, Title & ownership, Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
Survey plots, KGIS cadastral
Road, stream, tank or settlement (not a plot)
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765 and 400 kV
Its corridor, to scale
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Structure; Structural safety certificate; Internal roads; Completion, accountant; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per house; Sewage plant; Design consultants (Form 6); Fire safety.
Land · ₹35.17 Cr 27.3%Development · ₹93.46 Cr 72.7%
Form 4
Estimated cost, at registration
₹128.63 Cr
Estimated cost, engineer's certificate
₹93.46 Cr
Cost left
₹34.67 Cr
Sales
Sold vs unsold, Q2 2026-27
Sold (30) 100%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
30 / 30 · 0 available
Sold, Q4 2025-26
30 / 30 · 0 available
Sold, Q1 2026-27
30 / 30 · 0 available
Sold, Q2 2026-27
30 / 30 · 0 available
Unsold, Q2 2026-27
0
Sold in Q4 2025-26
0
Sold in Q1 2026-27
0
Sold in Q2 2026-27
0
4 BHK, sold
30 / 30
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
Axis Bank · M G Road
Designated account, collected
₹7.79 Cr in Q2 2026-27
Designated account, withdrawn
₹17.57 Cr in Q2 2026-27
Escrow account, Q2 2026-27
₹17.57 Cr withdrawn
Track record
Average schedule slip
DOSL builder track
K-RERA registrations under this promoter
118
Marked completed
61
Past promised date, not completed
7
Revoked or withdrawn
7
Other phases under this promoter name
114
With a filed extension or completion
65 (58 completed, 7 extended)
Average schedule slip
12 months
Not verified yet: Receivable, sold houses; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Devanahalli taluk average, July 2023: 19.3 m below ground
What it means
10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class
Through the year
January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several)
Water supply, as filed
Local authority (Kannamangala Grama panchayat)
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
High-tension line, 765, 400 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot