Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Birla Trimaya Phase-2 in the interactive atlas
•• ••• ••••
Title
Title report
•• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries
Schedule in the EC vs KGIS neighbours
Not verified yet
Encumbrance certificate, Form 15
Not verified yet
Survey sketch
Survey sketch filed with K-RERA
Not verified yet
Sketch, sanction and mutation vs KGIS map
Not verified yet
Land record
Survey plots · KGIS cadastral
Filing vs KGIS map
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey
Not verified yet
Ownership
Share of sales revenue
Not verified yet
Joint development agreement
Not verified yet
Unlock this full report
₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
Approval letters
Building plan (BIAPPA)
Sanctioned 14 Aug 2024
Power NOC
Filed with the registration
Fire NOC
KSFES/NOC/158/2023 · issued 2 Jun 2023
✓Clear
Environmental clearance
SEIAA 145 CON 2022 · EC identification no. EC23B039KA188881 · issued 11 May 2023
✓Clear
Airport height NOC (1 of 8)
NOC ID BIAL/SOUTH/B/081222/689080 · issued 30 Aug 2022 · valid until 29 Aug 2030
✓Clear
Airport height NOC (2 of 8)
NOC ID BIAL/SOUTH/B/090122/695732 · issued 10 Oct 2022 · valid until 9 Oct 2030
Airport height NOC (3 of 8)
NOC ID BIAL/SOUTH/B/081222/689077
Airport height NOC (4 of 8)
NOC ID BIAL/SOUTH/B/081222/689079
Airport height NOC (5 of 8)
NOC ID BIAL/SOUTH/B/081222/689082
Airport height NOC (6 of 8)
NOC ID BIAL/SOUTH/B/081222/689084
Airport height NOC (7 of 8)
NOC ID BIAL/SOUTH/B/081222/689086
Airport height NOC (8 of 8)
issued 10 Oct 2022 · valid until 9 Oct 2030
✓Clear
Pollution board (CFE)
consent order CTE-336346 · issued 21 Feb 2023 · valid until 20 Feb 2028
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Not verified yet: Possession, agreement; Structure; Structural safety certificate; Internal roads; Club house; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Design consultants (Form 6).
Land · ₹43.11 Cr 8%Development · ₹494.82 Cr 92%
Cost left vs buyer dues
Form 4
Estimated cost, at registration
₹537.93 Cr
Estimated cost, architect's and engineer's certificates
₹299.21 Cr
Cost incurred
₹179.18 Cr (33.3% of the estimate)
Cost left
₹358.74 Cr
Receivable, sold flats
₹351.31 Cr
Sales
Sold vs unsold, Q2 2026-27
Sold (470) 99.4%Unsold (3) 0.6%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
468 / 473 · 5 available
Sold, Q4 2025-26
470 / 473 · 3 available
Sold, Q1 2026-27
470 / 473 · 3 available
Sold, Q2 2026-27
470 / 473 · 3 available
Unsold, Q2 2026-27
3
Sold in Q4 2025-26
2
Sold in Q1 2026-27
0
Sold in Q2 2026-27
0
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
ICICI Bank · RD RICHMOND
Designated account, collected
₹30.24 Cr in Q2 2026-27
Designated account, withdrawn
₹11.14 Cr in Q2 2026-27 (37% of that quarter's deposits)
Not verified yet: Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Building plan; Unregistered agreements, over 10% paid; Sale deed in favour of.
0
60
80
100
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Storm drain, smaller
Approximate location: the filed pin, good to the neighbourhood, not the plot
Devanahalli taluk average, July 2023: 19.3 m below ground
What it means
10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class
Through the year
January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several)
Water supply, as filed
Local authority (ANNESHWARA GRAMA PANCHAYATH)
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot