Building plan (BIAPPA)Sanctioned 5 Aug 2021No. BIAAPA/TP/CC/05/2021-22
RERA extensionsApplied for!ReviewReview
Land conversionConverted, 5 of 5 parcelsDates and authorities below
Permits
Validity
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
We haven't verified this for this project yet.
Sign in first, then it is one click.
Not verified yet: Forfeiture, agreement; Forfeiture, allotment letter; Transfer fee; Maintenance included; Agreement and allotment letter; Payment plan; Agreement for sale.
Valuation
What is it worth?
Locked
Recent price, super built-upNot verified yet
Recent price, carpet₹ ••,•••
Phase 1 → Phase 2Not verified yet
Gross yield, per sq ftNot verified yet
This project
Price
Price per sq ft, super built-up
Not verified yet
Location & risks
What is the location like?
Review2 to review
Groundwater, taluk average19.3 m below groundDevanahalli taluk, July 2023
Water supply, as filedOtherDeclared by the promoter
Metro, operationalabout 23.5 kmK.R. Puram
Construction & progress
How is it being built, and when will it be ready?
Review1 to review · 1 clear
Completion95%As of Q2 2026-27, promoter's return
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Clear2 clear
Receivable, sold flats₹80.49 CrAs of Q1 2026-27
Cost left₹7.53 CrAs of Q1 2026-27
Sold949 / 1,001✓ClearClear
Sold in Q2 2026-2711✓ClearClear
Funding
Estimated cost
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan (BIAPPA)
Sanctioned 5 Aug 2021
Escrow bank
ICICI Bank · 33/1, Ulsoor Road, Bangalore
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
229 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Valuation, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Valuation, Title & ownership, Disputes & cases and DocumentsUnlock
DOSL Score
59/100
Red flag
0th percentile in DevanahalliHigher than 0 of 15 scored projects
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
High-tension line, 765, 400 and 220 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
60% Agriculture, 30% Vacant / wasteland, 10% Transport & communication, over the filed survey numbers
!Review
Nearest government-flagged flood location
about 14 km, Shankrappa Layout, MAruthi nagar
Government land in the filed surveys
Sy 41: 52% of the parent survey, 2.2 of 4.25 acres; Sy 43: 31% of the parent survey, 1.26 of 4.05 acres; Sy 75: 4% of the parent survey, 0.2 of 4.77 acres
!Review
Flooding
Site vs nearest drain
Nearest storm drain
None within 3 km
Nearest lake, tank or pond
about 0.5 km, an unnamed water body
Drains and lakes around the filed pin
Amenities
Specification and Form 5
Amenities declared
Electricity · CCTV Surveillance · Indoor Sports facility · Gym · Power Backup · Water and Sanitation
Club House, built
100%
Electricity, built
80%
Swimming Pool, built
100%
Parks, built
40%
Piped Gas, built
45%
Covered parking per unit
0.58 (579 covered spaces for 1,001 units)
Power backup
Declared by the promoter
Around it
Water
Groundwater, Devanahalli taluk average
Not verified yet: Nearest high-tension line, Kitchen handover, Sewage plant, Nearest city water main, Ground level.
As the promoter reported it
Site photos filed with K-RERA, Q2 2026-27
Work left
By component, Q2 2026-27
Quarterly return, Q2 2026-27
Main structure
100% · planned by 6 Mar 2025
Electrical and plumbing finishing
54% · planned by 9 Jul 2026
Club house
100%
Completion
95%
Completion, accountant
97.2% of the estimated cost spent
Dates
Dates
Filed dates
Schedule end
9 Jul 2026
RERA completion date
9 Jul 2026
!Review
Work began, as filed
15 Sep 2021
Specified structure
What the promoter specified · not an inspection
Building heights, fire NOC
filed: Block B (Studio Units) 33.7 m, Block C- Wing 4 34.89 m, Block C- Wing 5 34.89 m, Block C- Wing 6 34.89 m, Block D- Wing 7 34.89 m, Block D- Wing 8 34.89 m, Block D- Wing 9 34.89 m, Block D- Wing 10 34.89 m, Block D- Wing 11 34.89 m
Specification sheet, page 1
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Estimated cost, architect's and engineer's certificates
₹211.42 Cr
Estimated cost, Form 4 Q1 2026-27
₹273.26 Cr
Cost incurred
₹265.73 Cr (97.2% of the Form 4 Q1 2026-27 estimate)
Cost left
₹7.53 Cr
Receivable, sold flats
₹80.49 Cr
Sales
Sold vs unsold, Q2 2026-27
Sold (949) 94.8%Unsold (52) 5.2%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
928 / 1,001 · 73 available
Sold, Q4 2025-26
932 / 1,001 · 69 available
Sold, Q1 2026-27
938 / 1,001 · 63 available
Sold, Q2 2026-27
949 / 1,001 · 52 available
Unsold, Q2 2026-27
52
Sold in Q4 2025-26
4
Sold in Q1 2026-27
6
Sold in Q2 2026-27
11
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
ICICI Bank · 33/1, Ulsoor Road, Bangalore
Designated account, collected
₹22.90 Cr in Q2 2026-27
Designated account, withdrawn
₹16.55 Cr in Q2 2026-27 (72% of that quarter's deposits)
Amount withdrawable, Form 4
₹2,59,59,70,000
Net amount withdrawable, Form 4
₹5,88,83,580
Withdrawn from the escrow account to date
₹2,53,70,86,420
Not verified yet: Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Site photos, Q2 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank
Approximate location: the filed pin, good to the neighbourhood, not the plot
Devanahalli taluk average, July 2023: 19.3 m below ground
What it means
10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2024, 1 of 5 CGWB wells in Devanahalli taluk read in this class
Through the year
January 2024: 6.9 m (5 wells), Pre-monsoon 2024: 7.1 m (5 wells), August 2024: 6.8 m (5 wells), depth below ground of CGWB's monitoring wells in Devanahalli taluk (the median where there are several)
Water supply, as filed
Other
Distances
Within 3 km of the filed pin
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, smaller
Lake or tank
Metro lines (dashed: planned)
Metro station
High-tension line, 765, 400, 220 and 66 kV
Its corridor, to scale
Buried cable
Approximate location: the filed pin, good to the neighbourhood, not the plot