Photo: Bharath SNTitle & ownership
Approvals
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Land · ₹9.00 Cr 50%Development · ₹9.00 Cr
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 13 Sep 2017 | |
| Escrow bank | Axis Bank · Akshya nagar |
Data room
115 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 1 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 1 | Clear |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1lakh Multistorey Bengaluru Housing PillahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation LImited | Apartment | 324 sqft carpet (as filed) | Mar 2024 |
| 8 Siddeshwar, String EstatesCompleted (regulator flag) | Vinod ML Kumar | Apartment | – | Completed |
| AgastyaLapsed · completion date passed | ISHTIKA HOMES PRIVATE LIMITED | Apartment | – | Sep 2022 |
| Akkshara CountyApplied for completion 24/06/2022 | G KRISHNA KUMAR | Plot | – | Jul 2021 |
| Alur Phase 2Lapsed · completion date passed | Bangalore Development Authority | Apartment | 1,781 sqft carpet (as filed) | Mar 2018 |
| Apollo AddressActive · 0% built | Indus Valley Properties Private Limited | Plot | ~1,040–2,100 sqft (estimate: filed carpet plus 25%) | Jul 2030 |
| Arine Golden BellsLapsed · completion date passed | M/s.Arine Structures | Mixed development | – | Apr 2022 |
| Artemis Address (In Association With Mythreyi)Applied for completion 31/12/2025 | INDIABUILD REAL ESTATES PVT LTD | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2025 |
8 of 77 other projects in Tumkur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Bee Home Aries in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BBMP) | Sanctioned 13 Sep 2017 · No. AD.COM/DSH/0101/17-18 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order AW-126721 · issued 12 Mar 2024 · valid until 31 Dec 2031 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2024 |
| Land conversion | Converted 19 Jul 2014 · DC Office, Bangalore | |
|---|---|---|
| Survey numbers | 15/5 · 15/4 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
2BHK · avg 61 m² 54.5%1BHK 40.9%3BHK 4.5%
| Type | Flats | Carpet, as filed (sq ft) |
|---|---|---|
| 1BHK | 18 | 8,460 |
| 2BHK | 24 | 15,651 |
| 3BHK | 2 | 2,002 |
Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Vruksha Greens, price locked.
| Vruksha Greens | 900 m | Locked | |
|---|---|---|---|
| Royal Enclave | about 4.5 km | Locked | |
| Rubby Castle 1 | about 5 km | Locked | |
| Sri Rama Enclave | about 7 km | Locked |
| Bee Home Aries This project | This project is the point the others are measured from | 31 Dec 2024 | – | Not verified yet |
|---|---|---|---|---|
| Vruksha Greens | 900 m | 30 Jun 2027 | 30% (24 of 80) | Locked |
| Royal Enclave | about 4.5 km | 31 Mar 2027 | 73% (44 of 60) | Locked |
| Rubby Castle 1 | about 5 km | 30 Apr 2029 | 25% (8 of 32) |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest government-flagged flood location | 150 m, BAGALKUNTE( L NARSIMHAYA LAYOUT) |
| Nearest storm drain | 180 m to the north, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 160 m to the south-west, an unnamed pond |
| Amenities declared | Electricity · Community Hall · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 0.98 (43 covered spaces for 44 units) | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 31 Dec 2024 |
|---|
| Schedule end | 6 Oct 2023 | |
|---|---|---|
| RERA completion date | 31 Dec 2024 | |
| Work began, as filed | 1 Aug 2017 |
| Structure | RCC framed structure | |
|---|---|---|
| Wall thickness | External walls: 6"; Internal walls: 4" | |
| Building heights, fire NOC | 14.95 m filed |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Toilet tiles | Anti-skid ceramic tiles (floor) | |
|---|---|---|
| Wiring | Concealed copper wiring | |
| Power backup | Power backup for lifts |
| Fire safety | None filed | |
|---|---|---|
| Environmental clearance | None filed | |
| Architect's certificate, registration | Dated 8 Feb 2022 · site inspected 6 Feb 2022 | |
| Engineer's certificate, registration | Dated 7 Feb 2022 | |
| Chartered accountant's certificate, registration | Dated 30 Apr 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹18.00 Cr |
|---|
Sold (20) 45.5%Unsold (24) 54.5%
| Flats sold, at completion | 20 | |
|---|---|---|
| Flats unsold, at completion | 24 | |
| Flats in the phase | 44 |
| Escrow bank | Axis Bank · Akshya nagar | |
|---|---|---|
| Share of collections the promoter declared for escrow | 70% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Shriram Solitaire | about 7 km | Locked |
|---|
| Century Kindle Phase 1 | 8.3 km | Locked |
|---|
| Renaissance Srichakra | about 9 km | Locked |
|---|
| Vista Padmalaya | about 9.5 km | Locked |
|---|
| Birla Tisya | 9.7 km | Locked |
|---|
| Assetz Soho & Sky | 10.5 km | Locked |
|---|
| 4square Park Sierra | 11.2 km | Locked |
|---|
| Cumins Sanctum | about 11.5 km | Locked |
|---|
| Locked |
| Sri Rama Enclave | about 7 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
|---|
| Shriram Solitaire | about 7 km | 15 May 2026 | 100% (269 of 269) | Locked |
|---|
| Century Kindle Phase 1 | 8.3 km | 14 Mar 2031 | 73% (336 of 458) | Locked |
|---|
| Rent, 2BHK, 3 km | ₹16,350 /mo · 10 listings | |
|---|---|---|
| Rent, 1BHK, 3 km | ₹7,500 /mo · 7 listings | |
| Rent per sq ft, 3 km | ₹16.8 /mo, as listed · 10 listings with a size |
| Projects within 4 km, counted | 6 (2 with an approximate location) | |
|---|---|---|
| Flats in them | 1,952 | |
| Booked | 1,544 of 1,952 (79%) | |
| Unsold | 408 | |
| Booked a month, pooled | 38 flats | |
| Months to sell, pooled | 11 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Borewell, BWSSB | |
| Nearest city water main | 170 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 180 m to the north, tertiary drain | |
|---|---|---|
| Ground level | 899 m above sea level, plus or minus 4 m | |
| Metro, operational | 2.0 km, Nagasandra | |
| Metro, under construction | 9.7 km, Jakkur Cross |
| Kempegowda Airport | 35.3 | 39 | 26.5 |
| MG Road (CBD) | 18.3 | 22 | 14.5 |
| Manyata Tech Park | 15.9 | 20 | 12.8 |
| ITPL, Whitefield | 32.8 | 40 | 26.7 |
| Ecospace, Bellandur ORR | 31.9 | 40 | 24.6 |
| Electronic City Ph 1 | 50.5 | 39 | 31.4 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 2.2 km to the north-east, named Chikkabanavara 5MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 450 m to the south-east, named MEI Layout on OpenStreetMap |