Overview
Bhavya Lake Vista
Overview
Bhavya Lake Vista
Overview
Bhavya Lake Vista
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of 1 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate, 1 page.
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) |
Disputes & cases
Contract & costs
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Late-payment interest | SBI MCLR + 2% (Karnataka RERA Rules, r.16) | |
|---|---|---|
| Interest the builder pays on late possession | SBI MCLR + 2% (Karnataka RERA Rules, r.16) |
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion |
|---|
Developer
Land · ₹13.73 Cr 33.1%Development · ₹27.75 Cr
Loan & collateral
| Escrow bank | STATE BANK OF INDIA · BANASWADI |
|---|
Data room
101 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| "new Dawn"Lapsed · completion date passed | M/s.Bricks & Milestones | Apartment | 1,932 sqft carpet (as filed) | Apr 2023 |
| 36 Park AvenueCompleted (regulator flag) | R K Developers | Plot | ~800–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase IIICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 36 Park Avenue Phase-IICompleted (regulator flag) | R K DEVELOPERS | Plot | ~1,200–2,000 sqft (estimate: filed carpet plus 25%) | Completed |
| 42 Mark ThreeCompleted · OC 19-02-2024 | LIVING STRUCTURES | Apartment | 2,041 sqft carpet (as filed) | Completed |
| 42 MarquisCompleted (regulator flag) | LIVING STRUCTURES | Plot | – | Completed |
| 63 Degree East - Tower ACompleted · OC 03-06-2025 | APG Intelli Homes Private Limited | Apartment | 918 sqft carpet (as filed) | Completed |
| 63 Degree East - Tower BLapsed · completion date passed | APG Intelli Homes Private Limited | Apartment | 833 sqft carpet (as filed) | Jun 2023 |
8 of 513 other projects in Sarjapur Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Bhavya Lake Vista in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 7,165 sq m | |
|---|---|---|
| Title deed | Sy 74/4A; 74/4, Kasavanahalli village | |
| Title deed | Sy 74/4A; 74/4, Kasavanahalli village, Varthur hobli |
| Filed with the registration |
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | Granted · Approved 17 Oct 2023 | |
|---|---|---|
| RERA completion date | 31 Dec 2024 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Map of 7 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Satori Residence By Genurise, price locked; Adarsh Rosewood, price locked; Assetz Mizumi Reserve Tower A1 A2 A4, price locked; Sobha Royal Pavilion Phase 8 - Wing 15, price locked; Sobha Royal Pavilion Phase 6 - Wing 10 And 11, price locked; Sobha Royal Pavilion Phase 7 - Wing 12, 13 And 14, price locked; Mana Jardin Neo, price locked.
| Bhavya Lake Vista This project | This project is the point the others are measured from | 31 Dec 2024 | – | Not verified yet |
|---|---|---|---|---|
| Satori Residence By Genurise | 2.2 km | 30 Jun 2030 | 10% (16 of 161) | Locked |
| Adarsh Rosewood | 2.2 km | 31 Dec 2027 | 20% (24 of 122) | Locked |
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 3 km | 30 Dec 2030 | 25% (38 of 150) | Locked |
| Abhee Riviera Royale | about 3.5 km | 28 Feb 2027 | 59% (57 of 96) | Locked |
| Assetz Mizumi Reserve Tower A1 A2 A4 | 3.3 km | 30 Dec 2030 | 69% (302 of 440) | Locked |
| Haven Phase 2 | about 3.5 km | 30 Jun 2030 | 11% (16 of 148) | Locked |
| Rent, 4BHK, 3 km | ₹96,000 /mo · 23 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹70,000 /mo · 321 listings | |
| Rent, 2BHK, 3 km | ₹42,000 /mo · 369 listings | |
| Rent, 1BHK, 3 km | ₹21,500 /mo · 161 listings | |
| Rent per sq ft, 3 km | ₹39.1 /mo, as listed · 403 listings with a size |
| Projects within 4 km, counted | 67 (26 with an approximate location) | |
|---|---|---|
| Flats in them | 14,632 | |
| Booked | 8,771 of 14,632 (60%) | |
| Unsold | 5,861 | |
| Booked a month, pooled | 164 flats | |
| Months to sell, pooled | 33 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Industrial (hi-tech), at the filed pin | |
|---|---|---|
| Nearest government-flagged flood location | 1.7 km, Bellandur |
| Nearest storm drain | 10 m, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 120 m to the north-west, Kaikondanahalli Lake |
| Schedule end | 30 Dec 2023 | |
|---|---|---|
| RERA completion date | 31 Dec 2024 | |
| Work began, as filed | 11 Feb 2020 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Estimated cost, at registration | ₹41.49 Cr |
|---|
Sold (124) 100%
| Flats sold, at completion | 124 | |
|---|---|---|
| Flats unsold, at completion | 0 | |
| Flats in the phase | 124 |
| Escrow bank | STATE BANK OF INDIA · BANASWADI | |
|---|---|---|
| Share of collections the promoter declared for escrow | 70% |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development | |
| Nearest city water main | 300 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 10 m, tertiary drain | |
|---|---|---|
| Ground level | 881 m above sea level, plus or minus 4 m | |
| Metro, operational | 4.6 km, Kudlu Gate | |
| Metro, under construction | 1.6 km, Ibbalur |
| Kempegowda Airport | 46.0 | 52 | 32.1 |
| MG Road (CBD) | 13.7 | 20 | 10.7 |
| Manyata Tech Park | 22.3 | 30 | 16.0 |
| ITPL, Whitefield | 18.0 | 23 | 10.6 |
| Ecospace, Bellandur ORR | 5.5 | 10 | 1.6 |
| Electronic City Ph 1 | 11.7 | 14 | 8.1 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 850 m to the north-east, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.4 km to the south-west |