Overview
Bhoomika Sunrise
Overview
Bhoomika Sunrise
Overview
Bhoomika Sunrise
Overview
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Side | Schedule in the EC | KGIS neighbours |
|---|---|---|
| North | EC schedule not read yet | tank |
| East | EC schedule not read yet | Survey 1 (J.I.Kembatthahalli); settlement |
| South | EC schedule not read yet | Survey 63 (J.I.Kembatthahalli); road |
| West | EC schedule not read yet | Survey 65 (J.I.Kembatthahalli) |
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| Pollution board (CFE) | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion |
|---|
Developer
Land · ₹1.01 Cr 7.1%Development · ₹13.18 Cr
Loan & collateral
| Escrow bank | HDFC · J P NAGAR 5th PHASE |
|---|
Data room
80 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | 1 | Clear |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Aishwarayam TranquilLapsed · completion date passed | MS AISHWARYAM CONCEPT HOMES | Apartment | 807 sqft carpet (as filed) | Mar 2023 |
| Akruthi Spring WoodsLapsed · completion date passed | DAI DORON INDIA PROPERTIES PVT. LTD. | Plot | – | Apr 2019 |
| Akshaya MeadowsLapsed · completion date passed | M/s Akshaya Meadows | Plot | ~1,080–1,800 sqft (estimate: filed carpet plus 25%) | Apr 2026 |
| AmaryllisLapsed · completion date passed | RAKI DEVELOPERS LLP | Apartment | 780–1,047 sqft carpet (as filed) | Jul 2026 |
| Ambiant - Maangalya AshirvadActive · 22% built | AMBIANT HOUSING & CONSTRUCTION PVT LTD. | Apartment | 896–1,171 sqft carpet (as filed) | Apr 2028 |
| Aqua VistaLapsed · completion date passed | POPPY REALTORS PRIVATE LIMITED | Apartment | 323–5,371 sqft carpet (as filed) | Dec 2024 |
| Arna MeadowsLapsed · completion date passed | ARNASHELTERS | Apartment | 1,584 sqft carpet (as filed) | Dec 2018 |
| Artha Satori Platinum | Artha Group | Villa | 4,780 sqft | – |
8 of 208 other projects in Bannerghatta Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Bhoomika Sunrise in the interactive atlas
Page 1
Page 1 of 12 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 12 pages.
| Filed survey numbers matched to the KGIS map | 1 of 1 | |
|---|---|---|
| Matched plots on the KGIS map | 16,519 sq m | |
| Land area filed with K-RERA | 2,733 sq m | |
| Filed area as a share of the KGIS plots' area | 17% | |
| Village, hobli and taluk on the KGIS map | J.I.Kembatthahalli, Uttarahalli-1 hobli, Bangalore-South taluk |
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
| Area on the KGIS map | 16,519 sq m, 1 of 1 filed survey numbers | |
|---|---|---|
| Land area of this registration | 2,733 sq m |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 10 Jun 2022 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Map of 3 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Sattva Forest Ridge, price locked; Lodha Azur, price locked; Azur Tower D, price locked.
| Platinum Landmark | about 0.5 km | Locked | |
|---|---|---|---|
| Aqua Vista | about 2 km | Locked | |
| Sattva Forest Ridge | 2.1 km | Locked | |
| Iris Courtyard | about 2.5 km | Locked |
| Bhoomika Sunrise This project | This project is the point the others are measured from | 10 Jun 2022 | – | Not verified yet |
|---|---|---|---|---|
| Platinum Landmark | about 0.5 km | 30 Dec 2027 | 17% (18 of 103) | Locked |
| Aqua Vista | about 2 km | 31 Dec 2024 | 96% (173 of 181) | Locked |
| Sattva Forest Ridge | 2.1 km | 31 Dec 2029 |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest government-flagged flood location | 1.7 km, BDA LAYOUT |
| Nearest storm drain | 70 m to the north, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | 80 m to the north-east, an unnamed tank |
| Schedule end | 31 Mar 2021 | |
|---|---|---|
| RERA completion date | 10 Jun 2022 | |
| Work began, as filed | 12 Jun 2020 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹14.19 Cr |
|---|
Sold (62) 96.9%Unsold (2) 3.1%
| Flats sold, at completion | 62 | |
|---|---|---|
| Flats unsold, at completion | 2 | |
| Flats in the phase | 64 |
| Escrow bank | HDFC · J P NAGAR 5th PHASE |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Lodha Azur | 3.7 km | Locked |
|---|
| Mahindra Eden Phase-2 | about 4 km | Locked |
|---|
| Srivara Vasudha | about 4 km | Locked |
|---|
| Azur Tower D | 3.9 km | Locked |
|---|
| Jhanavi Trishul Alaska | 5.0 km | Locked |
|---|
| Azur Phase 2 | about 5.5 km | Locked |
|---|
| Pacific Legacy | 6.0 km | Locked |
|---|
| Garden Square | 6.1 km | Locked |
|---|
| 75% (304 of 407) |
| Locked |
| Iris Courtyard | about 2.5 km | 30 Jun 2026 | 30% (12 of 40) | Locked |
|---|
| Lodha Azur | 3.7 km | 30 Oct 2029 | 97% (236 of 244) | Locked |
|---|
| Mahindra Eden Phase-2 | about 4 km | 30 Jul 2027 | 100% (250 of 250) | Locked |
|---|
| Rent, 3BHK, 3 km | ₹45,000 /mo · 26 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹28,000 /mo · 41 listings | |
| Rent, 1BHK, 3 km | ₹11,500 /mo · 8 listings | |
| Rent per sq ft, 3 km | ₹27.5 /mo, as listed · 39 listings with a size |
| Projects within 4 km, counted | 42 (24 with an approximate location) | |
|---|---|---|
| Flats in them | 10,955 | |
| Booked | 7,366 of 10,955 (67%) | |
| Unsold | 3,589 | |
| Booked a month, pooled | 223 flats | |
| Months to sell, pooled | 16 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 270 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 70 m to the north, secondary drain | |
|---|---|---|
| Ground level | 934 m above sea level, plus or minus 4 m | |
| Metro, operational | 3.8 km, Konankunte Cross | |
| Metro, under construction | 2.5 km, Kalena Agrahara |
| Kempegowda Airport | 50.4 | 53 | 40.5 |
| MG Road (CBD) | 17.3 | 20 | 13.5 |
| Manyata Tech Park | 25.8 | 31 | 21.5 |
| ITPL, Whitefield | 31.5 | 37 | 22.5 |
| Ecospace, Bellandur ORR | 19.0 | 24 | 13.6 |
| Electronic City Ph 1 | 15.7 | 16 | 11.1 |
| Landfill or waste transfer station | 1.1 km to the south-east | |
|---|---|---|
| Sewage treatment plant | 2.6 km to the north-east | |
| Quarry | 680 m to the south-west, named Anjanapura Quarries on OpenStreetMap | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 2.1 km to the north-west, named Khodays Glass Factory Substation on OpenStreetMap |