Overview
Blue Meadows
Overview
Blue Meadows
Overview
Blue Meadows
Overview
Photo: karthik reddyTitle & ownership
Approvals
| Fire department | Filed with the registration | |
|---|---|---|
| Pollution board (CFE) | Filed with the registration | |
| Water supply NOC | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion |
|---|
Developer
| Estimated cost, at registration | ₹13.82 Cr |
|---|
Loan & collateral
| Escrow bank | ANDHRA BANK · Medahalli |
|---|
Data room
60 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Blue Meadows in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 30 Sep 2021 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Garuda Grand | about 2 km | Locked |
|---|
| Godrej Splendour Phase II | about 2 km | Locked |
|---|
| Assetz Bloom & Dell - Phase 2 | about 2 km | Locked |
|---|
| Godrej Splendour | about 2 km | Locked |
|---|
| 2g Tula | about 2 km | Locked |
|---|
| Assetz Sun & Sanctum - Phase 2 | about 2.5 km | Locked |
|---|
| Nirmaanika Aria | about 3.5 km | Locked |
|---|
| Vaswani Starlight | about 4 km | Locked |
|---|
| Sattva Songbird | about 4.5 km | Locked |
|---|
| Axis Ekatva | about 4.5 km | Locked |
|---|
| Godrej Woodscapes | about 4.5 km | Locked |
|---|
| Coevolve Misty Shores | about 4.5 km | Locked |
|---|
| Blue Meadows This project | This project is the point the others are measured from | 30 Sep 2021 | – | Not verified yet |
|---|---|---|---|---|
| Garuda Grand | about 2 km | 31 Mar 2028 | 41% (56 of 136) | Locked |
| Godrej Splendour Phase II | about 2 km | 14 Jan 2028 | 88% (782 of 891) | Locked |
| Assetz Bloom & Dell - Phase 2 | about 2 km | 31 Oct 2027 | 100% (238 of 238) | Locked |
| Godrej Splendour | about 2 km | 20 Mar 2027 | 98% (1,135 of 1,161) | Locked |
| 2g Tula | about 2 km | 27 Dec 2027 | 68% (173 of 256) | Locked |
| Assetz Sun & Sanctum - Phase 2 | about 2.5 km | 31 Jul 2026 | 100% (70 of 70) | Locked |
| Projects within 4 km, counted | 61 (61 with an approximate location) | |
|---|---|---|
| Flats in them | 21,877 | |
| Booked | 13,364 of 21,877 (61%) | |
| Unsold | 8,513 | |
| Booked a month, pooled | 103 flats | |
| Months to sell, pooled | 74 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 1 km, TRIVENI NAGAR NEAR KR PURAM |
|---|
| Nearest storm drain | about 0.5 km, secondary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Yellamallappa Lake |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Self development |
| Schedule end | 30 Nov 2020 | |
|---|---|---|
| RERA completion date | 30 Sep 2021 | |
| Work began, as filed | 22 Feb 2019 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Sold (26) 61.9%Unsold (16) 38.1%
| Flats sold, at completion | 26 | |
|---|---|---|
| Flats unsold, at completion | 16 | |
| Flats in the phase | 42 |
| Escrow bank | ANDHRA BANK · Medahalli |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, secondary drain | |
|---|---|---|
| Metro, operational | about 3.5 km, Pattandur Agrahara | |
| Metro, under construction | about 5 km, Saraswathi Nagar |
| Kempegowda Airport | 32 | 20.5 |
| MG Road (CBD) | 17.5 | 14.5 |
| Manyata Tech Park | 17 | 12 |
| ITPL, Whitefield | 8.5 | 3.5 |
| Ecospace, Bellandur ORR | 14.5 | 11.5 |
| Electronic City Ph 1 | 32.5 | 20.5 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | about 1 km, named Yelemallappa Chetti 15MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | about 2 km to the south, named Hoody Traction on OpenStreetMap |