Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of 3 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate, 3 pages, not in English.
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Escrow bank | ICICI Bank · Nandidurga Main Road |
|---|
Data room
61 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| HM Gladiolus | HM Group | Apartment | 2,630–2,840 sqft | – |
| King's AcropolisActive · 30% built | KING'S DEVELOPERS & INFRASTRUCTURE | Apartment | 1,010–4,300 sqft carpet (as filed) | Jun 2028 |
| Nitesh Logos | Nitesh Estates | Apartment | 4,290–6,700 sqft | – |
| Sobha Diamond | Sobha Ltd | Apartment | 2,000–3,000 sqft | – |
| Tirumala Kare GruhamLapsed · completion date passed | Kare Constructions | Apartment | – | Jun 2018 |
All 5 other projects in Ulsoor, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Bluevalley Zen is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Land area of this registration | 910 sq m |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 10 May 2019 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Ranka Iris | about 2.5 km, to a locality centre | Locked |
|---|
| Century Regalia (Project 2) | about 4 km, to a locality centre | Locked |
|---|
| Vista Svara | about 4 km, to a locality centre | Locked |
|---|
| Magnolia Delight | about 5 km, to a locality centre | Locked |
|---|
| Aydin Infra Signature 3 | about 6 km, to a locality centre | Locked |
|---|
| Renaissance Srichakra | about 6.5 km, to a locality centre | Locked |
|---|
| Legacy Saviero | about 7 km, to a locality centre | Locked |
|---|
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 7 km, to a locality centre | Locked |
|---|
| Vista Padmalaya | about 7 km, to a locality centre | Locked |
|---|
| Lodha Mirabelle | about 8 km, to a locality centre | Locked |
|---|
| Mirabelle Phase 2 | about 8 km, to a locality centre | Locked |
|---|
| Vkk Grand | about 8 km, to a locality centre | Locked |
|---|
| Bluevalley Zen This project | This project is the point the others are measured from | 10 May 2019 | – | Not verified yet |
|---|---|---|---|---|
| Ranka Iris | about 2.5 km, to a locality centre | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Century Regalia (Project 2) | about 4 km, to a locality centre | 28 Feb 2030 | 63% (80 of 128) | Locked |
| Vista Svara | about 4 km, to a locality centre | 30 Oct 2026 | 50% (16 of 32) | Locked |
| Magnolia Delight | about 5 km, to a locality centre | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Aydin Infra Signature 3 | about 6 km, to a locality centre | 5 Aug 2027 | 50% (6 of 12) | Locked |
| Renaissance Srichakra | about 6.5 km, to a locality centre | 11 Aug 2027 | 63% (5 of 8) | Locked |
| Nearest storm drain | about 0.5 km from the locality centre, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | The locality centre is inside the mapped outline of Ulsoor Lake |
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Self development |
| Landfill or waste transfer station | about 2 km from the locality centre | |
|---|---|---|
| Sewage treatment plant | about 1 km from the locality centre, named Halasuru 2MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km of the locality centre | |
| Crematorium | about 2 km from the locality centre, named Kalpalli Cemetery Crematorium on OpenStreetMap | |
| Prison | None within 3 km of the locality centre | |
| Electrical substation | about 1 km from the locality centre, named B Station on OpenStreetMap |
| Schedule end | 30 May 2020 | |
|---|---|---|
| RERA completion date | 10 May 2019 | Red flag |
| Work began, as filed | 11 May 2017 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Escrow bank | ICICI Bank · Nandidurga Main Road |
|---|
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed locality; basemap © OpenStreetMap contributors
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed locality; basemap © OpenStreetMap contributors
| Nearest drain | about 0.5 km from the locality centre, primary drain |
|---|