Overview
Tirumala Kare Gruham
Overview
Tirumala Kare Gruham
Overview
Tirumala Kare Gruham
Overview
Photo: Rajkumar GuptaTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Page 1
Page 1 of 1 of the encumbrance certificate. Filed with K-RERA: Latest Encumbrance Certificate, 1 page.
Approvals
| Power NOC | Filed with the registration | |
|---|---|---|
| Fire department | Filed with the registration | |
| SEIAA | Filed with the registration | |
| AAI | Filed with the registration | |
| KSPCB |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Escrow bank | Karur Vysya Bank Ltd. · Rajajinagar |
|---|
Data room
67 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | 1 | – | – | Red flag |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| Bluevalley ZenLapsed · completion date passed | M/S.BLUE VALLEY URBAN INFRATECH PRIVATE LIMITED, | Apartment | – | May 2019 |
| HM Gladiolus | HM Group | Apartment | 2,630–2,840 sqft | – |
| King's AcropolisActive · 30% built | KING'S DEVELOPERS & INFRASTRUCTURE | Apartment | 1,010–4,300 sqft carpet (as filed) | Jun 2028 |
| Nitesh Logos | Nitesh Estates | Apartment | 4,290–6,700 sqft | – |
| Sobha Diamond | Sobha Ltd | Apartment | 2,000–3,000 sqft | – |
All 5 other projects in Ulsoor, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Tirumala Kare Gruham is not plotted on the interactive atlas: its filing gives no coordinate precise enough to place a single building, only the surrounding locality.
Survey plots around the locality centre named in the filing, on satellite imagery. The outlines are the land of each survey number, not buildings. The filing names only the locality, so the marker is the locality centre, not the site. The survey plots around it are shown for orientation only; this project's survey numbers are not matched to them yet.
| Land area of this registration | 521 sq m |
|---|
| Filed with the registration |
| RERA extensions | Rejected · Applied 30 Dec 2019 | |
|---|---|---|
| RERA completion date | 30 Jun 2018 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Ranka Iris | about 2.5 km, to a locality centre | Locked |
|---|
| Century Regalia (Project 2) | about 4 km, to a locality centre | Locked |
|---|
| Vista Svara | about 4 km, to a locality centre | Locked |
|---|
| Magnolia Delight | about 5 km, to a locality centre | Locked |
|---|
| Aydin Infra Signature 3 | about 6 km, to a locality centre | Locked |
|---|
| Renaissance Srichakra | about 6.5 km, to a locality centre | Locked |
|---|
| Legacy Saviero | about 7 km, to a locality centre | Locked |
|---|
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 7 km, to a locality centre | Locked |
|---|
| Vista Padmalaya | about 7 km, to a locality centre | Locked |
|---|
| Lodha Mirabelle | about 8 km, to a locality centre | Locked |
|---|
| Mirabelle Phase 2 | about 8 km, to a locality centre | Locked |
|---|
| Vkk Grand | about 8 km, to a locality centre | Locked |
|---|
| Tirumala Kare Gruham This project | This project is the point the others are measured from | 30 Jun 2018 | – | Not verified yet |
|---|---|---|---|---|
| Ranka Iris | about 2.5 km, to a locality centre | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Century Regalia (Project 2) | about 4 km, to a locality centre | 28 Feb 2030 | 63% (80 of 128) | Locked |
| Vista Svara | about 4 km, to a locality centre | 30 Oct 2026 | 50% (16 of 32) | Locked |
| Magnolia Delight | about 5 km, to a locality centre | 31 Mar 2028 | 21% (10 of 48) | Locked |
| Aydin Infra Signature 3 | about 6 km, to a locality centre | 5 Aug 2027 | 50% (6 of 12) | Locked |
| Renaissance Srichakra | about 6.5 km, to a locality centre | 11 Aug 2027 | 63% (5 of 8) | Locked |
| Nearest storm drain | about 0.5 km from the locality centre, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | The locality centre is inside the mapped outline of Ulsoor Lake |
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Local authority |
| Landfill or waste transfer station | about 2 km from the locality centre | |
|---|---|---|
| Sewage treatment plant | about 1 km from the locality centre, named Halasuru 2MLD Sewage Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km of the locality centre | |
| Crematorium | about 2 km from the locality centre, named Kalpalli Cemetery Crematorium on OpenStreetMap | |
| Prison | None within 3 km of the locality centre | |
| Electrical substation | about 1 km from the locality centre, named B Station on OpenStreetMap |
| RERA completion date | 30 Jun 2018 | Red flag |
|---|---|---|
| Work began, as filed | 9 Mar 2016 |
| Structure | RCC framed structure |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | Wooden windows | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles | Anti-skid tiles (floor) | |
| Wiring | Concealed copper wiring |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Escrow bank | Karur Vysya Bank Ltd. · Rajajinagar |
|---|
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed locality; basemap © OpenStreetMap contributors
Map centred on the locality the filing names, approximate: locality level. The filing names only the locality. The marker is its centre and the ring is 5 km; it does not mark the site.
Centre of the filed locality; basemap © OpenStreetMap contributors
| Nearest drain | about 0.5 km from the locality centre, primary drain |
|---|