Title & ownership
Approvals
| Building plan (BBMP) | Sanctioned 5 Oct 2021 · No. BBMP/Addl.Dir/JDSOUTH/0004/21-22 |
|---|
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
3BHK · avg 119 m² 71.9%2BHK · avg 98 m² 28.1%
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BBMP) | Sanctioned 5 Oct 2021 | |
| Escrow bank | Karnataka Bank Ltd. · BTM LAYOUT |
Data room
124 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Survey plots around an approximate filed pin, with its uncertainty ring, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around an approximate filed pin. The dashed ring is 1 km: nine in ten approximate pins checked against surveyed land sat within it, so the site is most likely somewhere inside it, not at its centre. This project's survey numbers are not matched to the plots yet, so none is marked as its land.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| “smilee Celestial”Lapsed · completion date passed | Blue Valley Properties Pvt Ltd | Plot | – | Aug 2019 |
| 1 Lakhmulti Storey Housing DoddanagamangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 1 Lakhmulti Storey Housing GoolimangalaLapsed · completion date passed | Rajiv Gandhi Housing Corporation Pvt Ltd | Apartment | 323–484 sqft carpet (as filed) | Mar 2024 |
| A B AnanthaActive · 84% built | Amaravathi Builders | Apartment | 753–972 sqft carpet (as filed) | Jan 2027 |
| Abhee NandikaCompleted · OC 22-04-2022 | ABHEE DEVELOPERS | Apartment | 786 sqft carpet (as filed) | Completed |
| Abhee Prakruthi Villa PlotsCompleted (regulator flag) | M/s.Abhee Developers | Plot | – | Completed |
| Abhee PrideCompleted · OC 18-04-2026 | ABHEE VENTURES PRIVATE LIMITED | Apartment | 688–842 sqft carpet (as filed) | Completed |
| Abhee Serenity SpringsActive · 35% built | Abhee Ventures | Apartment | 1,000–1,575 sqft | Jun 2030 |
8 of 270 other projects in Electronic City, A to Z. Status is taken from each project's own filing.
All 279 projects in Electronic City → · Axis Concept Construction PVT LTD's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Bochs Akshaya in the interactive atlas
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Power NOC | Filed with the registration |
|---|
| Fire department | Filed with the registration |
|---|
| SEIAA | Filed with the registration |
|---|
| AAI | Filed with the registration |
|---|
| Pollution board (CFE) | consent order W-124670 · issued 8 Sep 2023 |
|---|
| Water and sewerage NOC (BWSSB) | issued 18 Feb 2022 |
|---|
| RERA extensions | Granted · Approved 2 Feb 2024 | |
|---|---|---|
| RERA completion date | 22 Nov 2024 |
| Land conversion | Converted 7 Feb 1998 · Deputy Commisioner, Bangalore District, Bangalore | |
|---|---|---|
| Survey numbers | 24 |
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
| Type | Flats | Carpet per flat, average (sq ft) |
|---|---|---|
| 2BHK | 18 | 1,058 |
| 3BHK | 46 | 1,278 |
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 1 km | Locked | |
|---|---|---|---|
| Mahindra NewHaven | about 1 km | Locked | |
| Dhiraan Lotus | about 1 km | Locked | |
| Mahindra Zen | about 1 km | Locked | |
| Assetz Canvas & Cove 2.0 - Block A | about 1 km | Locked | |
| K&T's Sai Sannidhi | about 1 km | Locked | |
| Azur Phase 2 | about 2 km | Locked | |
| Abhee Riviera Royale | about 2 km | Locked | |
| Assetz Mizumi Reserve Tower A1 A2 A4 | about 2.5 km | Locked | |
| Azur Tower D | about 3.5 km | Locked | |
| Lodha Azur | about 4 km | Locked | |
| Pacific Legacy | about 4 km | Locked |
| Bochs Akshaya This project | This project is the point the others are measured from | 22 Nov 2024 | – | Not verified yet |
|---|---|---|---|---|
| Assetz Canvas & Cove - Phase 1 Wing A & B | about 1 km | 30 Apr 2027 | 100% (272 of 273) | Locked |
| Mahindra NewHaven | about 1 km | 28 Dec 2029 | 89% (106 of 119) | Locked |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest government-flagged flood location | about 0.5 km, Singasandra Country club road |
|---|
| Nearest storm drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, Singasandrakodagi Lake |
| Amenities declared | Electricity · Indoor Sports facility · Gym · Power Backup · Water and Sanitation | |
|---|---|---|
| Covered parking per unit | 1.11 (71 covered spaces for 64 units) | |
| Sewage plant | Sewage treatment plant | |
| Power backup | Declared by the promoter |
| Completion | Completed, occupancy certificate 24 Oct 2024 |
|---|
| Schedule end | 22 Nov 2023 | |
|---|---|---|
| RERA completion date | 22 Nov 2024 | |
| Grace period for possession | 3 months (plus a further 3 months extension for force majeure) | |
| Work began, as filed | 25 Nov 2021 |
| Structure | RCC framed structure | |
|---|---|---|
| Foundation | Footings | |
| Wall material | Internal walls 150 and 100 mm (6 and 4 inch) solid concrete blocks; external walls 150 mm (6 inch) | |
| Wall thickness | Internal 150 and 100 mm (6 and 4 inch); external 150 mm (6 inch) | |
| Building heights, fire NOC | 14.99 m filed |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Windows | UPVC windows (sliding) | |
|---|---|---|
| Flooring | Vitrified tiles | |
| Toilet tiles | Anti-skid ceramic tiles (floor) | |
| Wiring | Fire-resistant wiring | |
| Sanctioned load per flat | 2BHK: 3 kW | |
| Power backup | Power backup for lifts, pumps, common area lighting | |
| Sewage plant | Sewage treatment plant |
| Fire safety | Not found | |
|---|---|---|
| Architect's certificate, registration | Dated 15 Feb 2022 · site inspected 14 Feb 2022 | |
| Engineer's certificate, registration | Dated 15 Feb 2022 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
| Estimated cost, at registration | ₹42.64 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹30.61 Cr |
Sold (59) 92.2%Unsold (5) 7.8%
| Flats sold, at completion | 59 | |
|---|---|---|
| Flats unsold, at completion | 5 | |
| Flats in the phase | 64 |
| Escrow bank | Karnataka Bank Ltd. · BTM LAYOUT |
|---|
| K-RERA registrations under this promoter | 6 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 1 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Dhiraan Lotus |
|---|
| about 1 km |
| 31 Dec 2027 |
| 56% (20 of 36) |
| Locked |
| Mahindra Zen | about 1 km | 31 Dec 2028 | 100% (227 of 228) | Locked |
|---|
| Assetz Canvas & Cove 2.0 - Block A | about 1 km | 30 Apr 2029 | 98% (238 of 244) | Locked |
|---|
| K&T's Sai Sannidhi | about 1 km | 31 Dec 2025 | 68% (27 of 40) | Locked |
|---|
| Projects within 4 km, counted | 42 (42 with an approximate location) | |
|---|---|---|
| Flats in them | 11,040 | |
| Booked | 6,890 of 11,040 (62%) | |
| Unsold | 4,150 | |
| Booked a month, pooled | 139 flats | |
| Months to sell, pooled | 28 months |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 23.2 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru South taluk average, July 2023: 16.9 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class | |
| Through the year | January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several) | |
| Water supply, as filed | BWSSB |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | about 0.5 km, tertiary drain | |
|---|---|---|
| Metro, operational | about 1 km, Singasnadra | |
| Metro, under construction | about 4 km, HSR Layout |
| Kempegowda Airport | 47 | 36.5 |
| MG Road (CBD) | 12.5 | 11.5 |
| Manyata Tech Park | 23.5 | 18.5 |
| ITPL, Whitefield | 24 | 16 |
| Ecospace, Bellandur ORR | 11.5 | 7 |
| Electronic City Ph 1 | 8.5 | 6 |
| Landfill or waste transfer station | about 2 km, named Karnataka Compost Development Centre - KCDC on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | about 0.5 km, named Chikkabeguru Sewage Treatment Plant on OpenStreetMap | |
| Quarry | about 2.5 km to the south | |
| Crematorium | about 2 km to the north-east, named Kudlu Crematorium on OpenStreetMap | |
| Prison | about 2.5 km to the east, named Bangalore Central Jail on OpenStreetMap | |
| Electrical substation | about 2 km |