Overview
Brigade Lumina
Overview
Brigade Lumina
Overview
Brigade Lumina
Overview
Photo: Brigade LuminaTitle & ownership
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Building plan (BDA) | Sanctioned 16 Mar 2026 | |
| Escrow bank | KOTAK MAHINDRA BANK · Lavelle Road, Bangalore |
Data room
142 documents filed with K-RERA for this project
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 2 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 2 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
CRM team Sanjay, is very co-operation and helpful in every interaction I had., Good Job, Keep it up.
Unit No C117 Today have discussed in detail with Mr Sanjay of your office. He explained every thing and clarified my all doubts to my satisfaction.
Met Sanjay at site, CRM team helped me clarifying my doubts, thank you
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Locked |
| Approvals | – | – | 3 | Clear |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | 1 | 1 | Review |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| 1lakh Multistorey Bengaluru Housing PillahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation LImited | Apartment | 324 sqft carpet (as filed) | Mar 2024 |
| 8 Siddeshwar, String EstatesCompleted (regulator flag) | Vinod ML Kumar | Apartment | – | Completed |
| AgastyaLapsed · completion date passed | ISHTIKA HOMES PRIVATE LIMITED | Apartment | – | Sep 2022 |
| Akkshara CountyApplied for completion 24/06/2022 | G KRISHNA KUMAR | Plot | – | Jul 2021 |
| Alur Phase 2Lapsed · completion date passed | Bangalore Development Authority | Apartment | 1,781 sqft carpet (as filed) | Mar 2018 |
| Apollo AddressActive · 0% built | Indus Valley Properties Private Limited | Plot | ~1,040–2,100 sqft (estimate: filed carpet plus 25%) | Jul 2030 |
| Arine Golden BellsLapsed · completion date passed | M/s.Arine Structures | Mixed development | – | Apr 2022 |
| Artemis Address (In Association With Mythreyi)Applied for completion 31/12/2025 | INDIABUILD REAL ESTATES PVT LTD | Plot | ~1,200–1,530 sqft (estimate: filed carpet plus 25%) | Dec 2025 |
8 of 77 other projects in Tumkur Road, A to Z. Status is taken from each project's own filing.
All 80 projects in Tumkur Road → · Brigade Group's track record →
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Brigade Lumina in the interactive atlas
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Valid as of this reportValidity ended
| Building plan (BDA) | Sanctioned 16 Mar 2026 · No. BDA/PS/EM/EO-1/TA-1/E/05/2025-26 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| Fire NOC | KSFES/NOC/432/2025 · issued 5 Nov 2025 · building height 59.95 m (TOWER - A, TOWER - B), 62.92 m (TOWER - C) | Clear |
| Environmental clearance | SEIAA 10 CON 2025 · EC identification no. EC24C3801KA5232359N · issued 7 Mar 2025 | Clear |
| Airport height NOC | Filed with the registration | |
| Pollution board (CFE) | consent order CTE-350040 · issued 6 Aug 2025 · valid until 6 Mar 2035 | Clear |
| Water supply NOC | Filed with the registration |
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2030 |
| Land conversion | 3 of 3 parcels converted | |
|---|---|---|
| Sy 38/2B | Converted 4 Dec 2025 · Deputy Commissioner | |
| Sy 38/2A, 46/2 | Converted 9 Aug 1974 · Sp. Deputy Commissioner | |
| Survey numbers | 38/2B · 38/2A · 46/2 |
₹99 for this report opens Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
2 bedroom + 2 toilet · avg 69 m² 9.4%2 bedroom + 2 toilet · avg 69 m² 9.4%3 bedroom + 2 toilet · avg 91 m² 9.1%3 bedroom + 3 toilet · avg 104 m² 9.1%12 other types 63%
| 2 bedroom + 2 toilet | 39 | 747 |
| 2 bedroom + 2 toilet | 39 | 742 |
| 2 bedroom + 2 toilet | 18 | 736 |
| 2 bedroom + 2 toilet | 19 | 713 |
| 2 bedroom + 2 toilet | 19 | 738 |
| 2 bedroom + 2 toilet | 20 | 756 |
| 3 bedroom + 2 toilet | 36 | 1,010 |
| 3 bedroom + 2 toilet | 38 | 980 |
| 3 bedroom + 2 toilet | 36 | 939 |
| 3 bedroom + 2 toilet | 17 | 951 |
| 3 bedroom + 2 toilet | 19 | 1,011 |
| 3 bedroom + 3 toilet | 19 | 1,139 |
| 3 bedroom + 3 toilet | 19 | 1,118 |
| 3 bedroom + 3 toilet | 20 | 1,139 |
| 3 bedroom + 3 toilet | 20 | 1,117 |
| 3 bedroom + 3 toilet | 38 | 1,121 |
| Sold, Q2 2026-27 | 414 / 416 | |
|---|---|---|
| Unsold, Q2 2026-27 | 2 | |
| Months to sell, derived from filed bookings | 0 months |
Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Vruksha Greens, price locked.
| Vruksha Greens | 2.8 km | Locked | |
|---|---|---|---|
| Royal Enclave | about 4.5 km | Locked | |
| Rubby Castle 1 | about 7 km | Locked | |
| Sri Rama Enclave | about 8.5 km | Locked |
| Brigade Lumina This project | This project is the point the others are measured from | 31 Dec 2030 | 100% (414 of 416) | Not verified yet |
|---|---|---|---|---|
| Vruksha Greens | 2.8 km | 30 Jun 2027 | 30% (24 of 80) | Locked |
| Royal Enclave | about 4.5 km | 31 Mar 2027 | 73% (44 of 60) | Locked |
| Rubby Castle 1 | about 7 km | 30 Apr 2029 |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 52% Residential (main), 48% Industrial (general) | |
|---|---|---|
| Nearest government-flagged flood location | 540 m, CHICKKABIDRIKAL |
| Nearest storm drain | 110 m to the east, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 550 m to the south-east, Dabedurkallu |
| Amenities declared | Electricity · Power Backup · Water and Sanitation | |
|---|---|---|
| Electricity, built | 0% | |
| Water and Sanitation, built | 0% | |
| Covered parking per unit | 1.02 (425 covered spaces for 416 units) | |
| Power backup | Declared by the promoter |
As the promoter reported it

| Main structure | 3% · planned by 8 Jul 2028 | |
|---|---|---|
| Electrical and plumbing finishing | Not started · planned by 30 Mar 2030 | |
| Completion | 11% | |
| Completion, accountant | 10.5% of the estimated cost spent |
| Schedule end | 31 Dec 2030 | |
|---|---|---|
| RERA completion date | 31 Dec 2030 | |
| Work began, as filed | 1 Apr 2026 |
| Building heights, fire NOC | 59.95 m (TOWER - A, TOWER - B), 62.92 m (TOWER - C) on the fire NOC · filed: TOWER - A 59.95 m, TOWER - B 56.97 m, TOWER - C 59.95 m |
|---|
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Power backup | Provided, 271.11 sq m |
|---|
| Structural engineer, quarterly | Form 6 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | Clear |
|---|---|---|
| Fire safety | KSFES/NOC/432/2025 · issued 5 Nov 2025 · building height 59.95 m (TOWER - A, TOWER - B), 62.92 m (TOWER - C) | |
| Environmental clearance | SEIAA 10 CON 2025 · EC identification no. EC24C3801KA5232359N · issued 7 Mar 2025 | |
| Architect, quarterly | Form 5 · Apr 2026, Jul 2026, Oct 2026 (3 filed) | |
| Engineer's certificate, registration | Dated 17 Mar 2026 | |
| Chartered accountant's certificate, registration | Dated 17 Mar 2026 | |
| Chartered accountant, Form 4 | Dated 10 Oct 2026 | |
| Architect's site inspection for the quarterly progress certificate | 30 Sep 2026 |
Page 1
Page 1 of the structural safety certificate. The promoter filed this with the registration.
Land · ₹213.49 Cr 43.5%Development · ₹276.95 Cr 56.5%
| Estimated cost, at registration | ₹490.44 Cr | |
|---|---|---|
| Estimated cost, architect's and engineer's certificates | ₹276.95 Cr | |
| Estimated cost, Form 4 Q2 2026-27 | ₹490.44 Cr | |
| Cost incurred | ₹51.70 Cr (10.5% of the Form 4 Q2 2026-27 estimate) | |
| Receivable, sold flats | ₹626.67 Cr |
Sold (414) 99.5%Unsold (2) 0.5%
| Sold, Q4 2025-26 | 337 / 416 · 79 available | |
|---|---|---|
| Sold, Q1 2026-27 | 411 / 416 · 5 available | |
| Sold, Q2 2026-27 | 414 / 416 · 2 available | |
| Unsold, Q2 2026-27 | 2 | |
| Sold in Q1 2026-27 | 74 | |
| Sold in Q2 2026-27 | 3 | |
| 2 BHK, sold | 152 / 154 | |
| 3 BHK, sold | 262 / 262 | |
| Flats booked, Form 4 Q1 2026-27 | 337 |
| Escrow bank | KOTAK MAHINDRA BANK · Lavelle Road, Bangalore | |
|---|---|---|
| Designated account, collected | ₹32.69 Cr in Q2 2026-27 | |
| Designated account, withdrawn | ₹27.25 Cr in Q2 2026-27 (83% of that quarter's deposits) | |
| Sale proceeds realised, Q2 2026-27 | ₹12,34,00,000 |
| K-RERA registrations under this promoter | 60 | |
|---|---|---|
| Marked completed | 20 | |
| Past promised date, not completed | 15 | |
| Revoked or withdrawn | 1 | |
| Other phases under this promoter name | 31 | |
| With a filed extension or completion | 13 (11 completed, 2 extended) | |
| Average schedule slip | 19 months |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Birla Tisya | 8.8 km | Locked |
|---|
| Renaissance Srichakra | about 9 km | Locked |
|---|
| Shriram Solitaire | about 9.5 km | Locked |
|---|
| Vista Padmalaya | about 9.5 km | Locked |
|---|
| Century Kindle Phase 1 | 10.5 km | Locked |
|---|
| 25% (8 of 32) |
| Locked |
| Sri Rama Enclave | about 8.5 km | 30 Sep 2026 | 61% (39 of 64) | Locked |
|---|
| Birla Tisya | 8.8 km | 31 Dec 2026 | 100% (392 of 392) | Locked |
|---|
| Renaissance Srichakra | about 9 km | 11 Aug 2027 | 63% (5 of 8) | Locked |
|---|
| Rent, 2BHK, 3 km | ₹17,000 /mo · 13 listings | |
|---|---|---|
| Rent, 1BHK, 3 km | ₹8,750 /mo · 10 listings | |
| Rent per sq ft, 3 km | ₹21.7 /mo, as listed · 13 listings with a size |
| Projects within 4 km, counted | 6 (2 with an approximate location) | |
|---|---|---|
| Flats in them | 1,773 | |
| Booked | 1,312 of 1,773 (74%) | |
| Unsold | 461 | |
| Booked a month, pooled | 28 flats | |
| Months to sell, pooled | 16 months |
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Local authority (TMC, Madanakanahalli) | |
| Nearest city water main | 1.8 km | Review |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 110 m to the east, tertiary drain | |
|---|---|---|
| Ground level | 882 m above sea level, plus or minus 4 m | |
| Metro, operational | 360 m, Manjunatha Nagar | |
| Metro, under construction | 11.1 km, Hebbal |
| Kempegowda Airport | 38.6 | 44 | 28.6 |
| MG Road (CBD) | 22.0 | 24 | 14.5 |
| Manyata Tech Park | 18.3 | 24 | 14.0 |
| ITPL, Whitefield | 36.6 | 41 | 27.5 |
| Ecospace, Bellandur ORR | 35.6 | 42 | 24.7 |
| Electronic City Ph 1 | 46.4 | 34 | 30.9 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | 620 m to the south, named Nagasandra on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 840 m to the north-west, named Jindal City Substation on OpenStreetMap |