Location is the best for this property. Metro station is just outside of the main gate. Well maintained and clean.
Overview
Brigade Metropolis
Overview
Brigade Metropolis
Overview
Brigade Metropolis
Overview
Photo: Sudeshna Dev NathLocation is the best for this property. Metro station is just outside of the main gate. Well maintained and clean.
Flats: Room size is small but the living room and kitchen are very spacious. Very well ventilated. Management: They are just hungry for money. They keep inventing new rules to extort money. They don't always return the deposit either.
Good society Beautifully maintained but flat sizes are average
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 2 | – | |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| 1 Lakh Multi Storey Bengaluru Housing BidarahalliLapsed · completion date passed | Rajiv Gandhi Housing Corporation Limited | Apartment | 323 sqft carpet (as filed) | Mar 2024 |
| 2g TulaExtended to 27-12-2027 | Togetherments Infra Pvt Ltd | Apartment | 1,256–1,485 sqft carpet (as filed) | Dec 2027 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| A M RajshekarActive · 70% built | A M RAJSHEKAR | Plot | ~600–1,200 sqft (estimate: filed carpet plus 25%) | Dec 2028 |
| Aakruthi Roots & RaysCompleted (regulator flag) | AAKRUTHI PROPERTIES | Plot | ~980–1,800 sqft (estimate: filed carpet plus 25%) | Completed |
| Aasara GreenwoodsCompleted · OC 02-04-2025 | AASARA BUILDERS | Apartment | 1,665–2,497 sqft carpet (as filed) | Completed |
| Adarsh Palm Meadows | Adarsh Developers | Villa | 1,800–5,500 sqft | – |
| Adithya EsquinaCompleted · OC 21-03-2019 | ADITHYA CONSTRUCTIONS | Apartment | 884 sqft carpet (as filed) | Completed |
| Adithya Green GardensCompleted · OC 14-06-2022 | ADITHYA DEVELOPERS | Apartment | 880–1,095 sqft carpet (as filed) | Completed |
8 of 438 other projects in Whitefield, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Brigade Metropolis in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Map of 2 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: 2g Tula, price locked; Garuda Grand, price locked.
| 2g Tula | 1.8 km | Locked | |
|---|---|---|---|
| Garuda Grand | 2.4 km | Locked | |
| Assetz Sun & Sanctum - Phase 2 | about 3.5 km | Locked | |
| Vaswani Starlight | about 4 km | Locked | |
| Coevolve Misty Shores | about 4 km | Locked | |
| Axis Ekatva | about 4.5 km | Locked | |
| Godrej Splendour | 5.0 km | Locked | |
| Godrej Splendour Phase II | about 5 km | Locked | |
| Reflections 66 | 5.3 km | Locked | |
| Assetz 66 & Shibui | about 5.5 km | Locked | |
| Legacy Saviero | about 5.5 km | Locked | |
| Assetz Bloom & Dell - Phase 2 | 5.9 km | Locked |
| Brigade Metropolis This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| 2g Tula | 1.8 km | 27 Dec 2027 | 68% (173 of 256) | Locked |
| Garuda Grand | 2.4 km | 31 Mar 2028 | 41% (56 of 136) | Locked |
| Assetz Sun & Sanctum - Phase 2 | about 3.5 km | 31 Jul 2026 | 100% (70 of 70) | Locked |
| Vaswani Starlight | about 4 km | 31 Dec 2029 | 43% (115 of 269) | Locked |
| Coevolve Misty Shores | about 4 km | 31 Dec 2029 | 2% (3 of 153) | Locked |
| Axis Ekatva | about 4.5 km | 30 Jun 2029 | 8% (23 of 287) | Locked |
| Rent, 5+BHK, 3 km | ₹75,000 /mo · 5 listings | |
|---|---|---|
| Rent, 4BHK, 3 km | ₹1,00,000 /mo · 11 listings | |
| Rent, 3BHK, 3 km | ₹63,000 /mo · 158 listings | |
| Rent, 2BHK, 3 km | ₹35,000 /mo · 222 listings | |
| Rent, 1BHK, 3 km | ₹20,000 /mo · 131 listings | |
| Rent per sq ft, 3 km | ₹35.3 /mo, as listed · 221 listings with a size |
| Projects within 4 km, counted | 36 (17 with an approximate location) | |
|---|---|---|
| Flats in them | 9,530 | |
| Booked | 5,641 of 9,530 (59%) | |
| Unsold | 3,889 | |
| Booked a month, pooled | 77 flats | |
| Months to sell, pooled | 50 months |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | 71% Industrial (general), 19% Commercial (business), 7% Parks & open space | Review |
|---|---|---|
| Nearest high-tension line | A 220 kV line crosses the site, its corridor taking about 2% (about 2,610 m²), with 5 transmission towers standing inside the outline | Review |
| Nearest government-flagged flood location | 1.1 km, Maheshwari nagar |
| Nearest storm drain | 50 m to the north, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 560 m to the south-west, an unnamed tank |
| K-RERA registrations under this promoter | 60 | |
|---|---|---|
| Marked completed | 20 | |
| Past promised date, not completed | 15 | |
| Revoked or withdrawn | 1 |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru East taluk average, July 2023: 27.3 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Nearest city water main | 290 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 50 m to the north, tertiary drain | |
|---|---|---|
| Ground level | 907 m above sea level, plus or minus 4 m | |
| Metro, operational | 300 m, Garudacharpalya | |
| Metro, under construction | 1.4 km, DRDO Sports complex |
| Kempegowda Airport | 38.4 | 38 | 23.1 |
| MG Road (CBD) | 13.4 | 15 | 11.1 |
| Manyata Tech Park | 12.9 | 18 | 10.8 |
| ITPL, Whitefield | 6.4 | 8 | 3.7 |
| Ecospace, Bellandur ORR | 9.9 | 17 | 7.7 |
| Electronic City Ph 1 | 28.2 | 34 | 17.1 |
| Landfill or waste transfer station | 2.8 km to the south | |
|---|---|---|
| Sewage treatment plant | 2.8 km to the south-east, named Sewage Treatment Plant on OpenStreetMap | |
| Quarry | 1.5 km to the west | |
| Crematorium | 2.4 km to the south-west | |
| Prison | None within 3 km | |
| Electrical substation | 250 m to the south-east |