Overview
Carpe Diem
Overview
Carpe Diem
Overview
Carpe Diem
Overview

Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
| Building plan (Hoskote Planning Authority) | Sanctioned 12 Mar 2025 · No. HPA/LAO/36/2024-25/3219 | |
|---|---|---|
| Power NOC | Filed with the registration | |
| SEIAA |
Disputes & cases
Contract & costs
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Developer's project loan | No borrowing declared | |
|---|---|---|
| Records searched to | 6 Apr 2025 | |
| Building plan | Sanctioned 12 Mar 2025 | |
| Escrow bank | Canara Bank · 598-HOSAKOTE 562114 |
Data room
129 documents filed with K-RERA for this project
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Locked |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | – | Review |
| Construction & progress | – | – | 1 | Clear |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
| 10xLapsed · completion date passed | M/S. MAZ-RD BUILDERS AND DEVELOPERS PRIVATE LIMITED | Apartment | – | Sep 2024 |
| 10x ELapsed · completion date passed | MAZ RD Builders and Developers Private Limited | Apartment | 478 sqft carpet (as filed) | Dec 2024 |
| A.S.R.S ParadiseLapsed · completion date passed | A.S. Builders | Apartment | – | Jan 2021 |
| Aadya HeightsLapsed · completion date passed | WHITEWINDS CONSTRUCTIONS PRIVATE LIMITED | Apartment | 917–1,080 sqft carpet (as filed) | Dec 2025 |
| Aakriti EmeraldActive · 51% built | AAKRITI PROJECTS | Apartment | 694–1,137 sqft carpet (as filed) | Aug 2028 |
| Aakruthi NestActive · 35% built | KRITI BUILDERS AND DEVELOPERS | Apartment | 608–837 sqft carpet (as filed) | Dec 2028 |
| Aban DesireRegistered · no quarterly update yet | ABAN DEVELOPERS PRIVATE LIMITED | Apartment | 801–1,054 sqft carpet (as filed) | Dec 2028 |
| Adarsh ParadiseActive · 93% built | A1 BUILDERS | Apartment | 668–924 sqft carpet (as filed) | Dec 2026 |
8 of 328 other projects in Old Madras Road, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Carpe Diem in the interactive atlas
Approval or registration
Land use converted
District Commissioner, Bangalore · Survey 10/2, 10/3, 190, 191/1
K-RERA filing, land schedule
Approval or registration
Land use converted
District Commissioner, Bangalore · Survey 10/2, 10/3, 190, 191/1
K-RERA filing, land schedule
Approval or registration
Land use converted
District Commissioner, Bangalore · Survey 10/2, 10/3, 190, 191/1
K-RERA filing, land schedule
Approval or registration
Building plan sanctioned
Hoskote Planning Authority · plan HPA/LAO/36/2024-25/3219
K-RERA filing, approvals
Approval or registration
Khata issued
E Khatha · N A · Survey 191/1
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Survey 10/2, 10/3, 190
K-RERA filing, land schedule
Approval or registration
Khata issued
E Khatha · Survey 10/2, 10/3, 190
K-RERA filing, land schedule
Transfer of the land
Title deed registered
No. HSK-1-01431-2025-26 · Book 1
Title deed filed with K-RERA, p. 4 · See it in Documents
Approval or registration
RERA registration
PRM/KA/RERA/1250/304/PR/080525/007729
K-RERA registration
Approval or registrationTitle checkTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
| Records searched to | 6 Apr 2025 |
|---|
| Developer's project loan | None declared |
|---|
Page 1
Page 1 of 2 of the survey sketch. Filed with K-RERA: ADLR SKETCH, 2 pages, not in English.
| Filed survey numbers matched to the KGIS map | 3 of 3 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 50,646 sq m | |
| Extent the filed land schedule names for these survey numbers | 31,784 sq m | |
| Plot area against the filed extent | 1.59 times | |
| Village, hobli and taluk on the KGIS map | Kolatthuru, Kasaba hobli, Hoskote taluk | |
| Sy. 190: filed extent, KGIS plot | 16,390 sq m, 17,006 sq m | |
| Sy. 191/1: filed extent, KGIS plot | 5,969 sq m, 16,118 sq m | |
| Mutation entry | None open on 4 of 4 filed surveys |
Satellite map with the 3 cadastral survey plots named in the filing outlined. The outline is the land, not the building. All 3 filed survey numbers matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026. Some drawn plots are whole survey numbers, not the project's own share of them; they show where the land is, not the site.
| Survey numbers | 10/2, 10/3, 190, 191/1 | |
|---|---|---|
| Whole survey numbers on the KGIS map | 50,646 sq m (the project holds a share) | |
| Khata | E Khatha · 1 Apr 2025; E Khatha · N A · 1 Apr 2025 |
| Sy. No. 10/2 | 1 | 1 acre 23 guntas | 0 | |||||
| Sy. No. 10/3 | 1 | 31 guntas | 0 | |||||
| Sy. No. 190 |
| KSPCB | Filed with the registration |
|---|
| Water supply NOC | Filed with the registration |
|---|
| RERA extensions | None on the filing | |
|---|---|---|
| RERA completion date | 31 Dec 2027 |
| Land conversion | Converted 30 Jul 2024 · District Commissioner, Bangalore | |
|---|---|---|
| Survey numbers | 10/2 · 10/3 · 190 · 191/1 |
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
₹99 for this report opens Contract & costs, Disputes & cases and Documents for this project, yours to read for good.
| Projects within 4 km, counted | 15 (15 with an approximate location) | |
|---|---|---|
| Plots in them | 3,340 | |
| Booked | 2,359 of 3,340 (71%) | |
| Unsold | 981 | |
| Booked a month, pooled | 94 plots | |
| Months to sell, pooled | 10 months |
Map of high-tension power lines, storm drains and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Zoning, RMP 2015 | Agriculture, over the filed survey numbers | Review |
|---|---|---|
| Nearest government-flagged flood location | about 11.5 km, SIDDHARTHA LAYOUT KADUGODI | |
| Government land in the filed surveys | Not found |
| Nearest storm drain | None within 3 km | |
|---|---|---|
| Nearest lake, tank or pond | about 0.5 km, an unnamed water body |
As the promoter reported itPossession date in the agreement

| Completion | 100% | |
|---|---|---|
| Completion, accountant | 77.3% of the estimated cost spent |
| Possession, agreement | 31 Dec 2028 | |
|---|---|---|
| RERA completion date | 31 Dec 2027 | |
| Work began, as filed | 1 May 2025 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Structural engineer, quarterly | Form 6 · Jan 2026, Apr 2026, Jul 2026, Oct 2026 (4 filed) | Clear |
|---|---|---|
| Engineer's certificate, registration | Dated 10 Apr 2025 | |
| Chartered accountant's certificate, registration | Dated 10 Apr 2025 |
Land · ₹13.17 Cr 69.9%Development · ₹5.68 Cr 30.1%
| Estimated cost, at registration | ₹18.85 Cr | |
|---|---|---|
| Estimated cost, engineer's certificate | ₹3.98 Cr | |
| Cost incurred | ₹14.58 Cr (77.3% of the estimate) | |
| Receivable, sold plots | ₹6.68 Cr |
| Plots booked, Form 4 Q2 2026-27 | 11 |
|---|
| Escrow bank | Canara Bank · 598-HOSAKOTE 562114 | |
|---|---|---|
| Designated account, collected | ₹5.0 L in Q2 2026-27 | |
| Designated account, withdrawn | ₹5.0 L in Q2 2026-27 | |
| Net amount withdrawable, Form 4 | ₹5,55,97,076 | |
| Share of collections the promoter declared for escrow | 70% |

Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| 1 |
| 4 acres 2 guntas |
| 4 acres 2 guntas |
| 4 acres 8 guntas |
| Yes |
| 0 |
| Sy. No. 191/1 | 1 | 1 acre 19 guntas | 1 acre 19 guntas | 3 acres 39 guntas | The map differs by 2 acres 20 guntas | 0 |
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Ten-year July mean for this taluk: 62 m
Taluk average; not a reading at the site.
| Groundwater | Hosakote taluk average, July 2023: 22.6 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes | |
| Through the year | Not found | |
| Water supply, as filed | Other |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
| Nearest drain | None within 3 km | |
|---|---|---|
| Metro, operational | about 12 km, Whitefield | |
| Metro, under construction | about 18 km, Saraswathi Nagar |
| Kempegowda Airport | 35.5 | 18.5 |
| MG Road (CBD) | 30 | 27 |
| Manyata Tech Park | 29.5 | 22.5 |
| ITPL, Whitefield | 20.5 | 14.5 |
| Ecospace, Bellandur ORR | 31 | 23.5 |
| Electronic City Ph 1 | 45 | 31 |
| Landfill or waste transfer station | None within 3 km | |
|---|---|---|
| Sewage treatment plant | None within 3 km | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | None within 3 km |