Building plan (BBMP)Sanctioned 27 Sep 2023No. BBMP/CC/1530/23-24
RERA extensionsNone on the filingFiling read 15 Nov 2026
Land conversionConverted 7 Apr 2003DC Bengaluru
Permits
Validity
Disputes & cases
Are there court cases or buyer complaints on this project?
Locked
Cases on the land
Cases on the builder
RERA complaints
Builder's other projects
Filed onCase no.Filed atWhat it's aboutStatus
₹ ••,•••
•• %
•• ••• ••••
Contract & costs
What does a buyer commit to?
We haven't verified this for this project yet.
Sign in first, then it is one click.
Not verified yet: Forfeiture, agreement; Forfeiture, allotment letter; Transfer fee; Maintenance included; Agreement and allotment letter; Payment plan; Agreement for sale.
Valuation
What is it worth?
We haven't verified the rest of this yet.
Sign in first, then it is one click.
This project
Unit sizes
Unit mix filed
Location & risks
What is the location like?
Clear2 clear
Groundwater, taluk average16.9 m below groundBengaluru South taluk, July 2023
Water supply, as filedBWSSBDeclared by the promoter
Metro, operational
Construction & progress
How is it being built, and when will it be ready?
Review1 to review · 1 clear
Completion80%As of Q2 2026-27, promoter's return
Progress
Completion, as the promoter reported it
Developer
Can the developer deliver?
Clear2 clear
Sold218 / 218✓ClearClear
Sold in Q2 2026-270✓ClearClear
Funding
Estimated cost
Loan & collateral
Can it be financed?
Developer's project loanNo borrowing declaredAs declared in the K-RERA filing
Conditions
Collateral checks
Developer's project loan
No borrowing declared
Building plan (BBMP)
Sanctioned 27 Sep 2023
Escrow bank
HDFC · EMPIRE INFANTRY ROAD
Stage
Progress as reported, by quarter
Data room
Documents filed for this project
Locked
135 documents filed with K-RERA for this project
DocumentFolderPagesFiled
₹ ••,•••
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Unlock this full report₹99 for this report · opens Disputes & cases and DocumentsUnlock
Survey plots · KGIS cadastral
Imagery: Esri, Vantor, Earthstar Geographics
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
Visited Casagrand Flamingo recently and was genuinely impressed with the overall planning of the project. The apartment layouts feel spacious and well thought out, with good natural lighting and practical space utilization. The locality is…
JJolly Mishra10 May 2026★★★★★
There is a garbage / compost treatment plant nearby, that smell goes over 3-4.km radius. We live here on HSR almost forgot last 12-13 years. Whenever we cross that road entire road smell stinks. Try to go for a walk on that small lake or…
SSkand25 Nov 2025★★★★★
CasaGrand Flamingo is a Scam – Do NOT Trust Them! I feel compelled to warn everyone against CasaGrand Flamingo. My experience with this builder has been horrific, unprofessional, and potentially illegal. Despite paying over 90% of the total…
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Casagrand Flamingo in the interactive atlas
Land use converted
DC Bengaluru · Survey 50
K-RERA filing, land schedule
Survey 50
Transfer of the land
Sale deed
Survey 50
K-RERA filing, land schedule
2022
Survey 50
Approval or registration
Khata issued
A Khatha · BBMP · Survey 50
K-RERA filing, land schedule
2023
Project
Approval or registration
Building plan sanctioned
BBMP · plan BBMP/CC/1530/23-24
K-RERA filing, approvals
Project
Approval or registration
RERA registration
PRM/KA/RERA/1251/310/PR/041023/006307
K-RERA registration ·
Approval or registrationTransfer of the landThe parcels join the project
Read from the original documentDescribed in the filing or another document; the original is not read here
Title
Title report
Title report dated
4 Nov 2022
Charges
Developer's project loan
None declared
Boundaries
Schedule in the EC vs KGIS neighbours
Side
Schedule in the EC
KGIS neighbours
North
EC schedule not read yet
Survey 53, 54 (Haralakunte)
East
EC schedule not read yet
Survey 52 (Haralakunte)
South
EC schedule not read yet
tank
West
EC schedule not read yet
Survey 49 (Haralakunte); Survey 15 (Yellukunte)
Survey sketch
Survey sketch filed with K-RERA
Page 1
Page 1 of the survey sketch. Filed with K-RERA: HSR - Single Plot Sketch.
Satellite map with the 1 cadastral survey plot named in the filing outlined. The outline is the land, not the building. The 1 filed survey number matched. Survey numbers read from the filed land documents and checked against the cadastre by an independent reviewer, 9 Oct 2026.
Consideration ₹37.0 L · Sy 50, Begur hobli, Bangalore South taluk
The RTC of each filed survey
Survey
Owners as on the RTC, read date / relation / share
Owners on the RTC
RTC extent
Filed extent
Map extent
Extents agree?
Land category
Pending mutations
Sy. No. 50
████████
1
3 acres 28 guntas
3 acres 28 guntas
4 acres 14 guntas
The map differs by 26 guntas
Not read yet
Not verified yet: Title opinion; Records searched to; Charges on the land; Landowner share of sales; Court-case search; High Court order; Encumbrance certificate, Form 15; Sketch dimensions; Sanctioned plan area; Mutation entry; Share of sales revenue; Joint development agreement.
Valid as of this reportValidity ended
Approval letters
Building plan (BBMP)
Sanctioned 27 Sep 2023 · No. BBMP/CC/1530/23-24
Power NOC
Filed with the registration
Fire NOC
KSFES/NOC/342/2021 · issued 23 Mar 2022
✓Clear
Environmental clearance
SEIAA 13 CON 2022 · EC identification no. EC22B038KA163744 · issued 1 Jun 2022
✓Clear
Airport height NOC
issued 9 Feb 2022 · valid until 8 Feb 2030
✓Clear
Pollution board (CFE)
consent order CTE-336547 · issued 2 Mar 2023 · valid until 31 May 2032
✓Clear
Water and sewerage NOC (BWSSB)
issued 27 Oct 2022
RERA
K-RERA
RERA extensions
None on the filing
RERA completion date
15 Sep 2026
Registration certificates
PRM/KA/RERA/1251/310/PR/041023/006307
Land use
Conversion order
Land conversion
Converted 7 Apr 2003 · DC Bengaluru
Survey numbers
50
•••••
₹ •.•• Cr
•• of ••
Unlock this full report
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
3BHK+3t · avg 106 m² 74.3%2BHK-2t · avg 79 m² 12.8%4BHK-4t · avg 144 m² 12.8%
Unit types
Type
Flats
Carpet per flat, average (sq ft)
2BHK-2t
28
847
3BHK+3t
162
1,146
4BHK-4t
28
1,545
Floor plans, brochure
No floor plans on file
Unsold stock
K-RERA inventory
Sold, Q2 2026-27
218 / 218
Unsold, Q2 2026-27
0
The area
Comparable projects
Filed prices nearby
Basemap: Esri, OpenStreetMap contributors
Map of 6 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Assetz Mizumi Reserve Tower A1 A2 A4, price locked; Mahindra Zen, price locked; Aydin Infra Signature 3, price locked; Mahindra NewHaven, price locked; K&T's Sai Sannidhi, price locked; Assetz Canvas & Cove 2.0 - Block A, price locked.
This project
Padlock: that project's price is part of its own report
Not verified yet: Recent price, super built-up; Recent price, carpet; Phase 1 → Phase 2; Gross yield, per sq ft; Price per sq ft, super built-up; Form 4 certified totals; Agreements in the Form 4 sold list; Carpet vs rest, by type; Transactions in this project; South Bengaluru, past year; Bengaluru, past year; South Bengaluru since 2022; This project vs South Bengaluru; By quarter; Registered sale price per sq ft, by year; Transactions around this project; Carpet price, projects within 4 km; Bengaluru median yield.
1.4 kmKudlu Gate
The site
Zoning & hazards
Power lines, drains and flood locations
Basemap: Esri, OpenStreetMap contributors
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
Land · ₹9.84 Cr 6.9%Development · ₹132.13 Cr 93.1%
Form 4
Estimated cost, at registration
₹141.96 Cr
Estimated cost, architect's certificate
₹123.75 Cr
Estimated cost, Form 4 Q2 2026-27
₹158.59 Cr
Sales
Sold vs unsold, Q2 2026-27
Sold (218) 100%
Sold per quarter
K-RERA inventory
Sold, Q3 2025-26
218 / 218 · 0 available
Sold, Q4 2025-26
218 / 218 · 0 available
Sold, Q1 2026-27
218 / 218 · 0 available
Sold, Q2 2026-27
218 / 218 · 0 available
Unsold, Q2 2026-27
0
Sold in Q4 2025-26
0
Sold in Q1 2026-27
0
Sold in Q2 2026-27
0
Compliance
Escrow, Q2 2026-27
Escrow and filings
Escrow bank
HDFC · EMPIRE INFANTRY ROAD
Designated account, collected
₹257.74 Cr in Q2 2026-27
Designated account, withdrawn
₹45.5 L in Q2 2026-27 (0% of that quarter's deposits)
Amount deposited in the quarter, Form 4
₹3,95,63,774
Share of collections deposited in escrow
65%
Sale proceeds realised, Q1 2026-27
₹6,10,08,654
Track record
Average schedule slip
DOSL builder track
K-RERA registrations under this promoter
20
Marked completed
3
Past promised date, not completed
9
Other phases under this promoter name
18
With a filed extension or completion
3 (2 completed, 1 extended)
Average schedule slip
9 months
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Cost incurred; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid.
Site photos, Q1 2026-27
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
Bengaluru South taluk average, July 2023: 16.9 m below ground
What it means
10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 10 CGWB wells in Bengaluru South taluk read in this class
Through the year
January 2025: 2.2 m (5 wells), Pre-monsoon 2025: 1.9 m (10 wells), August 2025: 1.5 m (11 wells), depth below ground of CGWB's monitoring wells in Bengaluru South taluk (the median where there are several)
Water supply, as filed
BWSSB
Nearest city water main
10 m
Distances
Within 3 km
Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.