Photo: Century RenataTitle & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
| Title report dated | 6 Dec 2009 |
|---|
Page 1
Page 1 of the encumbrance certificate. Filed with K-RERA: Encumbrance Certificate.
Approvals
| Pollution board (CFE) | Filed with the registration | |
|---|---|---|
| Water supply NOC | Filed with the registration |
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
| Completion | Completed, occupancy certificate filed with K-RERA |
|---|
Developer
Land · ₹69.43 Cr 47.3%Development · ₹77.41 Cr
Loan & collateral
| Escrow bank | HDFC · Richmond Road |
|---|
Data room
63 documents filed with K-RERA for this project
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
A concise living just got a whole lot bigger. Century Renata is something you would definitely like to own. Highly recommended.
All 5 stars to Renata!! Incredible residences to have a feel of the real Banglore.
I bought an apartment in CENTURY RENATA. timely and superb Service of the sales team,the papers organised and everything as we desired. Thanks to the full team Value for money.
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | 1 | – | Review |
| Disputes & cases | – | – | – | Locked |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | – | – | – |
| Construction & progress | – | – | – | – |
| Developer & finance | ||||
| Developer | – | – | – | – |
| Loan & collateral | – | – | – | – |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| 27 SummitLapsed · completion date passed | Nestled Haven Developers LLP | Apartment | 3,697–3,799 sqft carpet (as filed) | Nov 2025 |
| 32 RichmondCompleted (regulator flag) | EDGAR BRITTO | Apartment | 574–1,378 sqft carpet (as filed) | Completed |
| Bearys Cul-De-SacLapsed · completion date passed | BEARYS PROPERTIES AND DEVELOPMENTS PRIVATE LIMITED | Apartment | 1,419 sqft carpet (as filed) | Sep 2021 |
| Blar 21Active · 4% built | BLIAR SURYA LLP | Apartment | 1,787–2,791 sqft carpet (as filed) | Feb 2032 |
| Cascadia By Tvs EmeraldActive · 27% built | M/s. Emerald Haven Realty Limited | Apartment | 1,473–3,584 sqft carpet (as filed) | Aug 2030 |
| Chowriappa InfinityLapsed · completion date passed | CHOWRIAPPA CONSTRUCTIONS PVT. LTD. | Apartment | – | Dec 2018 |
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Century Renata in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
| Land area of this registration | 4,607 sq m |
|---|
| RERA extensions | Granted · Approved 3 Jan 2020 | |
|---|---|---|
| RERA completion date | 31 Mar 2019 |
₹99 for this report opens Disputes & cases and Documents for this project, yours to read for good.
| Vista Svara | about 1 km | Locked | |
|---|---|---|---|
| Ranka Iris | about 4.5 km | Locked | |
| Vista Padmalaya | about 5.5 km | Locked | |
| Century Regalia (Project 2) | 5.6 km | Locked | |
| Adarsh Premia | 5.9 km | Locked | |
| Renaissance Srichakra | about 6 km | Locked | |
| Aydin Infra Signature 3 | 6.3 km | Locked | |
| Birla Tisya | 6.7 km | Locked | |
| Magnolia Delight | about 6.5 km | Locked | |
| Pacific Legacy | 7.0 km | Locked | |
| Sobha Infinia Phase 2b Block 4 W1 And Block 3 W2 | about 7 km | Locked | |
| Song Of Wind | about 7.5 km | Locked |
| Century Renata This project | This project is the point the others are measured from | 31 Mar 2019 | – | Not verified yet |
|---|---|---|---|---|
| Vista Svara | about 1 km | 30 Oct 2026 | 50% (16 of 32) | Locked |
| Ranka Iris | about 4.5 km | 30 Apr 2026 | 62% (8 of 13) | Locked |
| Vista Padmalaya | about 5.5 km | 30 Apr 2027 | 40% (4 of 10) | Locked |
| Century Regalia (Project 2) | 5.6 km | 28 Feb 2030 | 63% (80 of 128) | Locked |
| Adarsh Premia | 5.9 km | 31 Mar 2027 | 55% (182 of 330) | Locked |
| Renaissance Srichakra | about 6 km | 11 Aug 2027 | 63% (5 of 8) | Locked |
| Rent, 4BHK, 3 km | ₹1,00,000 /mo · 6 listings | |
|---|---|---|
| Rent, 3BHK, 3 km | ₹60,000 /mo · 54 listings | |
| Rent, 2BHK, 3 km | ₹30,000 /mo · 113 listings | |
| Rent, 1BHK, 3 km | ₹12,000 /mo · 109 listings | |
| Rent per sq ft, 3 km | ₹31.6 /mo, as listed · 98 listings with a size |
| Projects within 4 km, counted | 18 (17 with an approximate location) | |
|---|---|---|
| Flats in them | 731 | |
| Booked | 467 of 731 (64%) | |
| Unsold | 264 | |
| Booked a month, pooled | 4 flats | |
| Months to sell, pooled | 65 months |
Map of the ground within about 900 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Commercial (business) | |
|---|---|---|
| Nearest government-flagged flood location | 740 m, Micheal church |
| Nearest storm drain | 680 m to the south-west, primary drain | |
|---|---|---|
| Nearest lake, tank or pond | 640 m to the north-west, an unnamed water body |
| Schedule end | 31 Mar 2018 | |
|---|---|---|
| RERA completion date | 31 Mar 2019 | |
| Work began, as filed | 30 Apr 2013 |
Page 1
Page 1 of the specification sheet. The promoter filed this with the registration.
| Estimated cost, at registration | ₹146.84 Cr |
|---|
| Escrow bank | HDFC · Richmond Road |
|---|
| K-RERA registrations under this promoter | 21 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 7 |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| EllenLapsed · completion date passed | Ubernest Developers LLP | Apartment | – | Sep 2022 |
| Gm PalazzoRegistered · no quarterly update yet | GULAM MUSTAFA | Apartment | 1,648 sqft carpet (as filed) | Mar 2028 |
8 of 22 other projects in Richmond Town, A to Z. Status is taken from each project's own filing.
Map of storm drains, lakes and government-flagged flood locations within about 900 m of the site.
Ten-year July mean for this taluk: 26.8 m
Taluk average; not a reading at the site.
| Groundwater | Bengaluru North taluk average, July 2023: 22.7 m below ground | |
|---|---|---|
| What it means | 20-40 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 7 CGWB wells in Bengaluru North taluk read in this class | |
| Through the year | January 2025: 2.6 m (5 wells), Pre-monsoon 2025: 2.9 m (7 wells), August 2025: 3.2 m (7 wells), depth below ground of CGWB's monitoring wells in Bengaluru North taluk (the median where there are several) | |
| Water supply, as filed | Local authority | |
| Nearest city water main | 580 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 680 m to the south-west, primary drain | |
|---|---|---|
| Ground level | 900 m above sea level, plus or minus 4 m | |
| Metro, operational | 1.8 km, Sir M. Visvesvaraya Stn., Central College | |
| Metro, under construction | 1.3 km, Rashtriya Military School |
| Kempegowda Airport | 35.4 | 40 | 28.9 |
| MG Road (CBD) | 2.3 | 6 | 1.6 |
| Manyata Tech Park | 11.7 | 18 | 9.6 |
| ITPL, Whitefield | 18.5 | 23 | 15.6 |
| Ecospace, Bellandur ORR | 15.6 | 24 | 10.1 |
| Electronic City Ph 1 | 19.7 | 28 | 16.4 |
| Landfill or waste transfer station | 1.7 km to the north | |
|---|---|---|
| Sewage treatment plant | 930 m to the north-west, named Cubbon Park 4MLD Sewage Treatment Planet on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 880 m to the north-west, named Kanteerava Stadium on OpenStreetMap |