This project is on dried lake bed. Definitely beware of potential future problems
Overview
Century Tisora
Overview
Century Tisora
Overview
Century Tisora
Overview
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
This project is on dried lake bed. Definitely beware of potential future problems
5 stars Been to the site and area looks good. The community is coming up just opposite the attur lake so you can surely consider investing.
Visited recently. Seems like reasonably priced luxury apartments. The project is between two lakes
| Property title & search report | ||||
|---|---|---|---|---|
| Title & ownership | – | – | – | Not verified |
| Approvals | – | – | – | – |
| Disputes & cases | – | – | – | – |
| Contract & costs | – | – | – | Not verified |
| Technical report | ||||
| Valuation | – | – | – | Not verified |
| Location & risks | – | 1 | 1 | |
Other sites that list or cover this project. DOSL does not vouch for them, and they can be older than the filing above.
| 4square Park SierraActive · 29% built | 4SQUARE ESTATES | Apartment | 1,083 sqft carpet (as filed) | Dec 2029 |
| Adithya TranquilLapsed · completion date passed | ADITHYA DEVELOPERS | Apartment | – | Jan 2023 |
| Aditi North StarActive · 0% built | ADI DEVELOPERS | Apartment | – | Dec 2030 |
Title & ownership
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Approvals
Disputes & cases
Contract & costs
We haven't verified this for this project yet.
Sign in first, then it is one click.
Valuation
We haven't verified the rest of this yet.
Sign in first, then it is one click.
Location & risks
Construction & progress
Developer
Loan & collateral
| Construction & progress | – | – | – | – |
|---|
| Developer & finance |
|---|
| Developer | – | – | – | – |
|---|
| Loan & collateral | – | – | – | – |
|---|
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Aditrri LotusExtended to 20-12-2026 |
| ADITRRI BUILDERS AND DEVELOPERS |
| Apartment |
| 839 sqft carpet (as filed) |
| Dec 2026 |
| Affinity GardeniaActive · 95% built | AFFINITY PROPERTIES LLP | Apartment | 682–853 sqft carpet (as filed) | Dec 2026 |
| After the RainCompleted · OC 30-04-2022 | Total Environment | Villa | 3,184–5,182 sqft | Completed |
| After the Rain - Phase II ACompleted · OC 10-01-2024 | Total Environment Building Systems Private Limited | Mixed development | 290–2,669 sqft carpet (as filed) | Completed |
| After the Rain Phase IIIActive · 3% built | TOTAL ENVIRONMENT BUILDING SYSTEMS PVT LTD | Apartment | 2,643–6,964 sqft carpet (as filed) | Apr 2032 |
8 of 135 other projects in Yelahanka, A to Z. Status is taken from each project's own filing.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Century Tisora in the interactive atlas
Survey plots around the filed site pin, on satellite imagery. The outlines are the land of each survey number, not buildings. Survey plots around the filed site pin. This project's survey numbers are not matched to them yet, so no plot is marked as its land.
Map of 1 projects within 4 km of the site that have a price confirmed from their Form 4 certificate: Century Kindle Phase 1, price locked.
| Century Kindle Phase 1 | 50 m | Locked | |
|---|---|---|---|
| Shriram Solitaire | about 1.5 km | Locked | |
| Rubby Castle 1 | about 3.5 km | Locked | |
| Legacy Salvador | about 4 km | Locked | |
| 4square Park Sierra | 4.3 km | Locked | |
| Godrej Aveline | 4.5 km | Locked | |
| Sri Rama Enclave | about 5 km | Locked | |
| Assetz Miru & Miyo | about 5 km | Locked | |
| Tnm Lakeview | about 6 km | Locked | |
| Assetz Soho & Sky | 6.0 km | Locked | |
| Cumins Sanctum | about 6.5 km | Locked | |
| Riviera Glade | about 6.5 km | Locked |
| Century Tisora This project | This project is the point the others are measured from | – | – | Not verified yet |
|---|---|---|---|---|
| Century Kindle Phase 1 | 50 m | 14 Mar 2031 | 73% (336 of 458) | Locked |
| Shriram Solitaire | about 1.5 km | 15 May 2026 | 100% (269 of 269) | Locked |
| Rubby Castle 1 | about 3.5 km | 30 Apr 2029 | 25% (8 of 32) | Locked |
| Legacy Salvador | about 4 km | 31 Dec 2026 | 71% (119 of 167) | Locked |
| 4square Park Sierra | 4.3 km | 31 Dec 2029 | 8% (14 of 170) | Locked |
| Godrej Aveline | 4.5 km | 31 Mar 2031 | 91% (769 of 849) | Locked |
| Rent, 3BHK, 3 km | ₹42,000 /mo · 8 listings | |
|---|---|---|
| Rent, 2BHK, 3 km | ₹24,500 /mo · 20 listings | |
| Rent, 1BHK, 3 km | ₹7,000 /mo · 10 listings | |
| Rent per sq ft, 3 km | ₹22.4 /mo, as listed · 20 listings with a size |
| Projects within 4 km, counted | 31 (17 with an approximate location) | |
|---|---|---|
| Flats in them | 6,762 | |
| Booked | 3,928 of 6,762 (58%) | |
| Unsold | 2,834 | |
| Booked a month, pooled | 101 flats | |
| Months to sell, pooled | 28 months |
Map of the ground within about 450 m of the site, showing high-tension power lines, storm drains and government-flagged flood locations.
| Zoning, RMP 2015 | Residential (main) | Clear |
|---|---|---|
| Nearest high-tension line | A 66 kV line's corridor covers about 16% of the site (about 10,280 m²), with 2 transmission towers standing inside the outline | Review |
| Nearest government-flagged flood location | 450 m, Attur, Near Dairy Circle |
| Nearest storm drain | 50 m to the south, tertiary drain | |
|---|---|---|
| Nearest lake, tank or pond | 120 m to the north-west, Tur Lake |
| K-RERA registrations under this promoter | 21 | |
|---|---|---|
| Marked completed | 2 | |
| Past promised date, not completed | 7 |
Map of storm drains, lakes and government-flagged flood locations within about 450 m of the site.
Ten-year July mean for this taluk: 32.6 m
Taluk average; not a reading at the site.
| Groundwater | Yelahanka taluk average, July 2023: 11.4 m below ground | |
|---|---|---|
| What it means | 10-20 m below ground, a class in CGWB's depth-to-water-level classes. In the pre-monsoon of 2025, 0 of 1 CGWB wells in Yelahanka taluk read in this class | |
| Through the year | January 2025: 3.8 m (1 well), Pre-monsoon 2025: 3.4 m (1 well), August 2025: 0.1 m (1 well), depth below ground of CGWB's monitoring wells in Yelahanka taluk (the median where there are several) | |
| Nearest city water main | 180 m |
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the site, with rings at 1 km and 3 km.
| Nearest drain | 50 m to the south, tertiary drain | |
|---|---|---|
| Ground level | 901 m above sea level, plus or minus 4 m | |
| Metro, operational | 9.3 km, Peenya | |
| Metro, under construction | 3.8 km, Yelahanka |
| Kempegowda Airport | 25.3 | 26 | 18.1 |
| MG Road (CBD) | 21.4 | 23 | 15.4 |
| Manyata Tech Park | 14.4 | 17 | 9.3 |
| ITPL, Whitefield | 31.4 | 38 | 23.1 |
| Ecospace, Bellandur ORR | 37.0 | 43 | 24.0 |
| Electronic City Ph 1 | 41.3 | 47 | 32.5 |
| Landfill or waste transfer station | 2.4 km to the north-west, named Mavallipura BBMP Landfill on OpenStreetMap | |
|---|---|---|
| Sewage treatment plant | 960 m to the east, named Yelahanka Waste Water Treatment Plant on OpenStreetMap | |
| Quarry | None within 3 km | |
| Crematorium | None within 3 km | |
| Prison | None within 3 km | |
| Electrical substation | 1.2 km to the east, named KHB Yelahanka on OpenStreetMap |