Google reviews One of the best luxury projects coming up in Budigere Cross. Located on the main connection to the airport from Whitefield area. The design is well planned. Construction is progressing at a rapid pace.
P Praveen Kumar 24 Feb 2026 ★ ★ ★ ★ ★ This building is going to be about 22 floors . It is already redefining the Skyline of Budigere cross and has become a landmark project . Ultimate in luxury living .. large balcony gardens and top of the line in construction materials and…
P Prakash V 21 Feb 2026 ★ ★ ★ ★ ★ This is an ultra-luxury residential apartment project by located in Upcoming Budigere Cross off Old Madras Road, Bangalore. 44 exclusive 3BHK "Sky Bungalows" , sizes of 5000 sq ft onwards, private gardens.. Prices start at about a whopping…
Not verified yet: Gross yield; East Bengaluru, past year.
Everything here is as filed by the promoter with Karnataka RERA or as recorded in Bhoomi land records, and can be stale or wrong at source. Verify against certified records before you transact. Open Chaithanya Sankhya in the interactive atlas
•• ••• ••••
Title Title report •• %
•• ••• ••••
•••••
₹ •.•• Cr
Charges •• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Boundaries Schedule in the EC vs KGIS neighbours Encumbrance certificate, Form 15 Survey sketch Survey sketch filed with K-RERA Sketch, sanction and mutation vs KGIS map ₹ ••,•••
•• %
•• ••• ••••
•••••
Land record Filing vs KGIS map •• ••• ••••
•••••
₹ •.•• Cr
•• of ••
The RTC of each filed survey •••••
₹ •.•• Cr
•• of ••
₹ ••,•••
Ownership Joint development agreement •• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report ₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what Chaithanya Sankhya's developer filed before you say yes.
× Chaithanya Sankhya
Chaithanya Projects Private Limited · Budigere Cross, off Old Madras Road
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
2028 Pollution board valid until 6 Jul 2028 Pollution board: valid until 6 Jul 2028 As of 18 Nov 2026 2024 2025 2026 2027 2028 Pollution board valid until 6 Jul 2028 Pollution board: valid until 6 Jul 2028 As of 18 Nov 2026
2024 2025 2026 2027 2028 Pollution board valid until 6 Jul 2028 Pollution board: valid until 6 Jul 2028 As of 18 Nov 2026
2024 2025 2026 2027 2028 Pollution board valid until 6 Jul 2028 Pollution board: valid until 6 Jul 2028 As of 18 Nov 2026
Valid as of this report Validity ended
RERA Registration certificates Registration certificate PRM/KA/RERA/1251/446/PR/271123/006439
•••••
Unlock this full report ₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what Chaithanya Sankhya's developer filed before you say yes.
× Chaithanya Sankhya
Chaithanya Projects Private Limited · Budigere Cross, off Old Madras Road
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
Agreement for sale
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Fees Agreement for sale
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unlock this full report ₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what Chaithanya Sankhya's developer filed before you say yes.
× Chaithanya Sankhya
Chaithanya Projects Private Limited · Budigere Cross, off Old Madras Road
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
Form 4 certified totals •• %
•• ••• ••••
•••••
₹ •.•• Cr
Agreements in the Form 4 sold list Unit sizes Unit types
•• of ••
₹ ••,•••
•• %
•• ••• ••••
•••••
Unsold stock K-RERA inventory
•• %
•• ••• ••••
•••••
₹ •.•• Cr
•• of ••
Registered deeds Transactions in this project The area Price trend East Bengaluru, past year Not verified yet
Bengaluru, past year Not verified yet
East Bengaluru since 2022 Not verified yet
This project vs East Bengaluru Not verified yet
Price per sq ft, super built-up Registered sales around Registered sale price per sq ft, by year Transactions around this project Comparable projects Carpet price, projects within 4 km Nearest 12 with filed prices
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Nearest projects This project vs the nearest with filed prices
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
•• ••• ••••
Unsold stock nearby Months to sell unsold stock K-RERA inventory
•••••
₹ •.•• Cr
•• of ••
₹ ••,•••
•• %
Unlock this full report ₹99 for this report opens Valuation, Contract & costs, Title & ownership, Disputes & cases and Documents for this project, yours to read for good.
Sign in to unlock for ₹99 Adjust maadbeda.One minute, read what Chaithanya Sankhya's developer filed before you say yes.
× Chaithanya Sankhya
Chaithanya Projects Private Limited · Budigere Cross, off Old Madras Road
₹99 for this report
✓ Contract terms read from the filed agreement ✓ Title and land records read from the filings ✓ Every figure cited to its page ✓ Pay once. It stays yours to read Sign in first, then pay ₹99 once for this report. No subscription.
No spam calls. We never ask for your phone number.
Built from 100+ public records and registers, K-RERA filings first · No broker, no listing fees
Around it Water Groundwater, Bengaluru East taluk average 0 m 10 m 20 m 30 m 40+ m 10 to 20 20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground 0 m 10 m 20 m 30 m 40+ m 5 to 10 10 to 20
Not verified yet: Nearest high-tension line, Kitchen handover, Sewage plant, Nearest city water main, Ground level.
0% 50% 100% Q3 2025-26: 76% 76% Q3 2025-26 Q4 2025-26: 85% 85% Q4 2025-26 Q1 2026-27: 90% 90% Q1 2026-27 Q2 2026-27: 92% 92% Q2 2026-27 0% 50% 100% Q3 2025-26: 76% 76% Q3 2025-26 Q4 2025-26: 85% 85% Q4 2025-26 Q1 2026-27: 90% 90% Q1 2026-27 Q2 2026-27: 92% 92% Q2 2026-27 0% 50% 100% Q3 2025-26: 76% 76% Q3 2025-26 Q4 2025-26: 85% 85% Q4 2025-26 Q1 2026-27: 90% 90% Q1 2026-27 Q2 2026-27: 92% 92% Q2 2026-27 0% 50% 100% Q3 2025-26: 76% 76% Q3 2025-26 Q4 2025-26: 85% 85% Q4 2025-26 Q1 2026-27: 90% 90% Q1 2026-27 Q2 2026-27: 92% 92% Q2 2026-27 As the promoter reported it
Work left By component, Q2 2026-27 Tower A Tower A: 92% 92% Earth work and other leveling preparation work Earth work and other leveling preparation work: 99% 99% Upto Plinth Level Upto Plinth Level: 95% 95% Retaining wall (All types) Retaining wall (All types): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 93% 93% Basic work of Water supply, Sanitary and Electrification Basic work of Water supply, Sanitary and Electrification: 80% 80% Railing and Grill fixing Railing and Grill fixing: 2% 2% Electrification, Water supply and Sanitary Finishing Electrification, Water supply and Sanitary Finishing: 60% 60% Fire prevention and fire fighting fitting and fixture with network Fire prevention and fire fighting fitting and fixture with network: 70% 70% Elevation work Elevation work: 5% 5% Sewage and Drainage System Sewage and Drainage System: 20% 20% Staircases Staircases: 100% 100% Corridor/Lobbies Corridor/Lobbies: 98% 98% Outer Wall Outer Wall: 100% 100% Club House Not started Electricity Not started Gym Not started Indoor Sports facility Not started Power Backup Not started Water and Sanitation Not started Sewage Treatment Plant (STP) Not started Solid waste management and disposal Not started Storm water drains Not started Street Lighting Not started Water Supply, external Not started Water conservation/rain water harvesting/recharg e of ground water, external Not started Emergency Evacuation services Not started Fire protection and fire safety requirements Not started Water Supply, internal Not started Water conservation/rain water harvesting/recharg e of ground water, internal Not started Common entrance and exit for the building/common portico/foyer/vera ndah Not started Provision for lodging of management staff and security staff Not started Solid Waste Management Not started
Tower A Tower A: 92% 92% Earth work and other leveling preparation work Earth work and other leveling preparation work: 99% 99% Upto Plinth Level Upto Plinth Level: 95% 95% Retaining wall (All types) Retaining wall (All types): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 93% 93% Basic work of Water supply, Sanitary and Electrification
Tower A Tower A: 92% 92% Earth work and other leveling preparation work Earth work and other leveling preparation work: 99% 99% Upto Plinth Level Upto Plinth Level: 95% 95% Retaining wall (All types) Retaining wall (All types): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 93% 93% Basic work of Water supply, Sanitary and Electrification
Tower A Tower A: 92% 92% Earth work and other leveling preparation work Earth work and other leveling preparation work: 99% 99% Upto Plinth Level Upto Plinth Level: 95% 95% Retaining wall (All types) Retaining wall (All types): 100% 100% Main structure Main structure: 100% 100% Plastering inside, outside & Ceiling Plastering inside, outside & Ceiling: 93% 93% Basic work of Water supply, Sanitary and Electrification
Quarterly return, Q2 2026-27 Dates Dates 2024 2026 2028 Work began 1 Nov 2023 As of 18 Nov 2026 RERA deadline 30 Nov 2028 Builder's schedule ends 30 Nov 2028 Work began: 1 Nov 2023 As of 18 Nov 2026 RERA deadline: 30 Nov 2028 Builder's schedule ends: 30 Nov 2028
2024 2025 2026 2027 2028 2029 Work began 1 Nov 2023 As of 18 Nov 2026 RERA deadline 30 Nov 2028 Builder's schedule ends 30 Nov 2028 Work began: 1 Nov 2023 As of 18 Nov 2026 RERA deadline: 30 Nov 2028 Builder's schedule ends: 30 Nov 2028
2024 2025 2026 2027 2028 2029 Work began 1 Nov 2023 As of 18 Nov 2026 RERA deadline 30 Nov 2028 Builder's schedule ends 30 Nov 2028 Work began: 1 Nov 2023 As of 18 Nov 2026 RERA deadline: 30 Nov 2028 Builder's schedule ends: 30 Nov 2028
2024 2025 2026 2027 2028 2029 Work began 1 Nov 2023 As of 18 Nov 2026 RERA deadline 30 Nov 2028 Builder's schedule ends 30 Nov 2028 Work began: 1 Nov 2023 As of 18 Nov 2026 RERA deadline: 30 Nov 2028 Builder's schedule ends: 30 Nov 2028
Specified structure What the promoter specified · not an inspection Specified finishes Specification sheet · brands "or equivalent" Certificates Engineer, architect and fire certificates Not verified yet: Possession, agreement; Structure; Structural safety certificate; Internal roads; Foundation; Wall material; Wall thickness; Concrete / steel grade; Windows; Flooring; Toilet tiles, spec vs brochure; Wiring; Sanctioned load per flat; Sewage plant; Design consultants (Form 6).
Land · ₹12.78 Cr: 5.1% Development · ₹235.81 Cr: 94.9% ₹249 Cr estimated cost Land · ₹12.78 Cr 5.1% Development · ₹235.81 Cr 94.9%
Sales Sold vs unsold, Q2 2026-27 Sold (29): 65.9% Unsold (15): 34.1% 66% 44 flats Sold (29) 65.9% Unsold (15) 34.1%
Sold per quarter Q4 2025-26 Q4 2025-26: booked flats went from 25 to 26 1 flat Q1 2026-27 1 booking cancelled or corrected (26 → 25 sold) Q2 2026-27 Q2 2026-27: booked flats went from 25 to 29 4 flats
Q4 2025-26 Q4 2025-26: booked flats went from 25 to 26 1 flat Q1 2026-27 1 booking cancelled or corrected (26 → 25 sold) Q2 2026-27 Q2 2026-27: booked flats went from 25 to 29 4 flats
Q4 2025-26 Q4 2025-26: booked flats went from 25 to 26 1 flat Q1 2026-27 1 booking cancelled or corrected (26 → 25 sold) Q2 2026-27 Q2 2026-27: booked flats went from 25 to 29 4 flats
Q4 2025-26 Q4 2025-26: booked flats went from 25 to 26 1 flat Q1 2026-27 1 booking cancelled or corrected (26 → 25 sold) Q2 2026-27 Q2 2026-27: booked flats went from 25 to 29 4 flats
Compliance Escrow, Q2 2026-27 Paid in Paid into the designated account in Q2 2026-27 ₹18.54 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹13.42 Cr
Paid in Paid into the designated account in Q2 2026-27 ₹18.54 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹13.42 Cr
Paid in Paid into the designated account in Q2 2026-27 ₹18.54 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹13.42 Cr
Paid in Paid into the designated account in Q2 2026-27 ₹18.54 Cr Withdrawn Withdrawn by the promoter in Q2 2026-27 ₹13.42 Cr
Not verified yet: Receivable, sold flats; Cost left; Cost left vs buyer dues; Collected from buyers; Land cost revision; Unregistered agreements, over 10% paid; Average schedule slip; DOSL builder track.
Q3 2025-26 Q3 2025-26: 76% built, as the promoter reported it 76% Q4 2025-26 Q4 2025-26: 85% built, as the promoter reported it 85% Q1 2026-27 Q1 2026-27: 90% built, as the promoter reported it 90% Q2 2026-27 Q2 2026-27: 92% built, as the promoter reported it 92%
Q3 2025-26 Q3 2025-26: 76% built, as the promoter reported it 76% Q4 2025-26 Q4 2025-26: 85% built, as the promoter reported it 85% Q1 2026-27 Q1 2026-27: 90% built, as the promoter reported it 90% Q2 2026-27 Q2 2026-27: 92% built, as the promoter reported it 92%
Q3 2025-26 Q3 2025-26: 76% built, as the promoter reported it 76% Q4 2025-26 Q4 2025-26: 85% built, as the promoter reported it 85% Q1 2026-27 Q1 2026-27: 90% built, as the promoter reported it 90% Q2 2026-27 Q2 2026-27: 92% built, as the promoter reported it 92%
Q3 2025-26 Q3 2025-26: 76% built, as the promoter reported it 76% Q4 2025-26 Q4 2025-26: 85% built, as the promoter reported it 85% Q1 2026-27 Q1 2026-27: 90% built, as the promoter reported it 90% Q2 2026-27 Q2 2026-27: 92% built, as the promoter reported it 92%
Not verified yet: Value; Max loan; Borrower margin; Example unit; Calculation; Records searched to; Unregistered agreements, over 10% paid; Sale deed in favour of.
0 60 80 100
3 km 2 km Filed pin pin may be this far off: 1 km Basemap: Esri, OpenStreetMap contributors
Map of drains, lakes, metro, high-tension lines and government-flagged flood locations within 3 km of the filed pin, with rings at 3 km. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Storm drain, primary Storm drain, smaller Lake or tank Metro lines (dashed: planned) High-tension line, 765, 400, 220 and 66 kV Its corridor, to scale Buried cable Approximate location: the filed pin, good to the neighbourhood, not the plot1 km Filed pin pin may be this far off: 1 km 1 km Filed pin pin may be this far off: 1 km Basemap: Esri, OpenStreetMap contributors
Map of storm drains, lakes and government-flagged flood locations within about 2 km of an approximate filed pin. Approximate location: the filed pin, good to the neighbourhood, not the plot. The dashed ring is 1 km: of the approximate pins that could be checked against the surveyed land, nine in ten sat within it.
Lake or tank Storm drain, primary Storm drain, smaller Approximate location: the filed pin, good to the neighbourhood, not the plot20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground 0 m 10 m 20 m 30 m 40+ m 2 to 5 5 to 10 10 to 20 20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground 0 m 10 m 20 m 30 m 40+ m 2 to 5 5 to 10 10 to 20 20 to 40 Ten-year July mean for Bengaluru East: 30.5 m Bengaluru East taluk average, July 2023 27.3 m below ground Ten-year July mean for this taluk: 30.5 m
Taluk average; not a reading at the site.
Connectivity Road distance from the site Kempegowda Airport Kempegowda Airport: about 23.5 km by road about 23.5 km MG Road (CBD) MG Road (CBD): about 23.5 km by road about 23.5 km Manyata Tech Park Manyata Tech Park: about 19 km by road about 19 km ITPL, Whitefield ITPL, Whitefield: about 15 km by road about 15 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: about 23 km by road about 23 km Electronic City Ph 1 Electronic City Ph 1: about 38 km by road about 38 km
Kempegowda Airport Kempegowda Airport: about 23.5 km by road about 23.5 km MG Road (CBD) MG Road (CBD): about 23.5 km by road about 23.5 km Manyata Tech Park Manyata Tech Park: about 19 km by road about 19 km ITPL, Whitefield ITPL, Whitefield: about 15 km by road about 15 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: about 23 km by road about 23 km Electronic City Ph 1 Electronic City Ph 1: about 38 km by road about 38 km
Kempegowda Airport Kempegowda Airport: about 23.5 km by road about 23.5 km MG Road (CBD) MG Road (CBD): about 23.5 km by road about 23.5 km Manyata Tech Park Manyata Tech Park: about 19 km by road about 19 km ITPL, Whitefield ITPL, Whitefield: about 15 km by road about 15 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: about 23 km by road about 23 km Electronic City Ph 1 Electronic City Ph 1: about 38 km by road about 38 km
Kempegowda Airport Kempegowda Airport: about 23.5 km by road about 23.5 km MG Road (CBD) MG Road (CBD): about 23.5 km by road about 23.5 km Manyata Tech Park Manyata Tech Park: about 19 km by road about 19 km ITPL, Whitefield ITPL, Whitefield: about 15 km by road about 15 km Ecospace, Bellandur ORR Ecospace, Bellandur ORR: about 23 km by road about 23 km Electronic City Ph 1 Electronic City Ph 1: about 38 km by road about 38 km
Six city anchors · OSRM, no traffic Nuisances Distance from the filed pin Landfill or waste station Landfill or waste station: about 1 km, Cheemasandra BBMP Landfill about 1 km Electrical substation Electrical substation: about 1.5 km, Manduru about 1.5 km Sewage treatment plant Sewage treatment plant: about 2.5 km about 2.5 km
Landfill or waste station Landfill or waste station: about 1 km, Cheemasandra BBMP Landfill about 1 km Electrical substation Electrical substation: about 1.5 km, Manduru about 1.5 km Sewage treatment plant Sewage treatment plant: about 2.5 km about 2.5 km
Landfill or waste station Landfill or waste station: about 1 km, Cheemasandra BBMP Landfill about 1 km Electrical substation Electrical substation: about 1.5 km, Manduru about 1.5 km Sewage treatment plant Sewage treatment plant: about 2.5 km about 2.5 km
Landfill or waste station Landfill or waste station: about 1 km, Cheemasandra BBMP Landfill about 1 km Electrical substation Electrical substation: about 1.5 km, Manduru about 1.5 km Sewage treatment plant Sewage treatment plant: about 2.5 km about 2.5 km
Basic work of Water supply, Sanitary and Electrification: 80% 80% Railing and Grill fixing Railing and Grill fixing: 2% 2% Electrification, Water supply and Sanitary Finishing Electrification, Water supply and Sanitary Finishing: 60% 60% Fire prevention and fire fighting fitting and fixture with network Fire prevention and fire fighting fitting and fixture with network: 70% 70% Elevation work Elevation work: 5% 5% Sewage and Drainage System Sewage and Drainage System: 20% 20% Staircases Staircases: 100% 100% Corridor/Lobbies Corridor/Lobbies: 98% 98% Outer Wall Outer Wall: 100% 100% Club House Not started Electricity Not started Gym Not started Indoor Sports facility Not started Power Backup Not started Water and Sanitation Not started Sewage Treatment Plant (STP) Not started Solid waste management and disposal Not started Storm water drains Not started Street Lighting Not started Water Supply, external Not started Water conservation/rain water harvesting/recharge of ground water, external Not started Emergency Evacuation services Not started Fire protection and fire safety requirements Not started Water Supply, internal Not started Water conservation/rain water harvesting/recharge of ground water, internal Not started Common entrance and exit for the building/common portico/foyer/verandah Not started Provision for lodging of management staff and security staff Not started Solid Waste Management Not started Basic work of Water supply, Sanitary and Electrification: 80% 80% Railing and Grill fixing Railing and Grill fixing: 2% 2% Electrification, Water supply and Sanitary Finishing Electrification, Water supply and Sanitary Finishing: 60% 60% Fire prevention and fire fighting fitting and fixture with network Fire prevention and fire fighting fitting and fixture with network: 70% 70% Elevation work Elevation work: 5% 5% Sewage and Drainage System Sewage and Drainage System: 20% 20% Staircases Staircases: 100% 100% Corridor/Lobbies Corridor/Lobbies: 98% 98% Outer Wall Outer Wall: 100% 100% Club House Not started Electricity Not started Gym Not started Indoor Sports facility Not started Power Backup Not started Water and Sanitation Not started Sewage Treatment Plant (STP) Not started Solid waste management and disposal Not started Storm water drains Not started Street Lighting Not started Water Supply, external Not started Water conservation/rain water harvesting/recharge of ground water, external Not started Emergency Evacuation services Not started Fire protection and fire safety requirements Not started Water Supply, internal Not started Water conservation/rain water harvesting/recharge of ground water, internal Not started Common entrance and exit for the building/common portico/foyer/verandah Not started Provision for lodging of management staff and security staff Not started Solid Waste Management Not started Basic work of Water supply, Sanitary and Electrification: 80% 80% Railing and Grill fixing Railing and Grill fixing: 2% 2% Electrification, Water supply and Sanitary Finishing Electrification, Water supply and Sanitary Finishing: 60% 60% Fire prevention and fire fighting fitting and fixture with network Fire prevention and fire fighting fitting and fixture with network: 70% 70% Elevation work Elevation work: 5% 5% Sewage and Drainage System Sewage and Drainage System: 20% 20% Staircases Staircases: 100% 100% Corridor/Lobbies Corridor/Lobbies: 98% 98% Outer Wall Outer Wall: 100% 100% Club House Not started Electricity Not started Gym Not started Indoor Sports facility Not started Power Backup Not started Water and Sanitation Not started Sewage Treatment Plant (STP) Not started Solid waste management and disposal Not started Storm water drains Not started Street Lighting Not started Water Supply, external Not started Water conservation/rain water harvesting/recharge of ground water, external Not started Emergency Evacuation services Not started Fire protection and fire safety requirements Not started Water Supply, internal Not started Water conservation/rain water harvesting/recharge of ground water, internal Not started Common entrance and exit for the building/common portico/foyer/verandah Not started Provision for lodging of management staff and security staff Not started Solid Waste Management Not started 3 km 2 km Filed pin pin may be this far off: 1 km